NevGold Corp (OTC:NAUFF) Drill core

NevGold Corp

Drill core

ReleaseDateProjectHeadline hole
NevGold Intercepts Strongest Result To Date in 2026: 8.28 g/t Oxide Au Over 3.0 Meters Within 1.73 g/t Oxide Au Over 45.7 Meters
LB26-009 Lower 1.73 g/t Au over 45.7 m from 178.3 m
LB26-017 0.27 g/t Au over 76.2 m from 16.8 m
Nov 12, 2026Limousine Butte ProjectLB26-009 Upper 0.45 % Sb over 10.7 m from 36.6 m
NevGold Extends Oxide Mineralization By Over 100 Meters: 7.27 g/t AuEq Over 3.0 Meters (6.18 g/t Au, 0.28% Sb) Within 1.55 g/t AuEq Over 32.0 Meters (0.92 g/t Au, 0.16% Sb); And 8.04 g/t AuEq Over 3.0 Meters (0.36 g/t Au, 1.98% Sb) Within 0.42% Sb Over 42.7 Meters
also including 8.04 g/t AuEq over 3.0 m from 27.4 m
LB26-008 Lower 0.16 g/t Au over 50.3 m from 207.3 m
Oct 22, 2026Limousine Butte ProjectLB26-008 Upper 0.42 % Sb over 42.7 m from 24.4 m
NevGold Intercepts 1.06 g/t Oxide Au Over 42.7 Meters Outside of 2026 MRE Pit-shell; Mineralization Also Expanded Inside Pit-Shell With 5.00 g/t Oxide Au Over 3.0 Meters Within 1.23 g/t Oxide Au Over 27.4 Meters at Limo Butte, Nevada
LB26-005 0.13 g/t Au over 36.6 m from 83.8 m
LB26-006 0.18 g/t Au over 30.5 m from 68.6 m
Sep 17, 2026Limousine Butte ProjectLB26-004 1.23 g/t Au over 27.4 m from 164.6 m
NevGold Expands Recent Mineral Resource Estimate With First 2026 Drillholes; 1.16% Antimony Over 3.0 Meters Within 1.38 g/t AuEq Over 50.3 Meters (0.31% Antimony and 0.19 g/t Au) From Surface
LB26-001 Middle 0.12 g/t Au over 24.4 m from 129.5 m
LB26-001 Lower 0.24 g/t Au over 45.7 m from 211.8 m
Aug 25, 2026Limousine Butte ProjectLB26-001 Upper 0.14 g/t Au over 9.1 m from 0.0 m
NevGold Intercepts Consistent Oxide Antimony-Gold Mineralization in All Drillholes From Historic Crushed Leach Pad Including 0.32% Antimony And 0.39 g/t Au Over 14.9 Meters
LBS26-019 0.30 % Sb over 16.5 m from 0.0 m
LBS26-016 0.27 % Sb over 14.0 m from 0.0 m
May 14, 2026Limousine Butte ProjectLBS26-014 0.39 g/t Au over 14.9 m from 0.0 m
NevGold Announces Positive, Consistent Drill Results on Historic Gold Leach Pads Including 0.34% Antimony And 0.41 g/t Au Over 12.5 Meters; Path to Near-Term Antimony Production Continues
LBS26-002 0.31 % Sb over 13.7 m from 0.0 m
LBS26-003 0.33 % Sb over 11.0 m from 0.0 m
Apr 14, 2026Limousine Butte ProjectLBS26-001 0.41 g/t Au over 12.5 m from 0.0 m
NevGold Intercepts 1.11% Antimony Over 6.1 Meters, Within 1.93 g/t AuEq Over 100.6 Meters (1.07 g/t Au And 0.22% Antimony) From Surface; Focus On Maiden Antimony-Gold Mineral Resource Estimate and Near-Term Antimony Production
also including 1.11 % Sb over 6.1 m from 16.8 m
LB25-027 0.11 g/t Au over 6.1 m from 0.0 m
Apr 9, 2026Limousine Butte ProjectLB25-023A 1.93 g/t AuEq over 100.6 m from 6.1 m
NevGold Intercepts 11.42 g/t AuEq Over 7.7 Meters (2.64% Antimony And 1.17 g/t Au) Within 4.91 g/t AuEq Over 27.4 Meters (1.09% Antimony And 0.67 g/t Au); Initial Antimony-Gold Mineral Resource Estimate On Schedule For Q2-2026 With Focus On Near-Term Antimony Production
LB25-022 0.09 g/t Au over 35.0 m from 44.2 m
LB25-021 0.23 g/t Au over 4.6 m from 39.6 m
Mar 19, 2026Limousine Butte ProjectLB25-024 4.91 g/t AuEq over 27.4 m from 29.0 m
NevGold Drills 8.51 g/t Oxide AuEq Over 10.6 Meters (8.11 g/t Au And 0.10% Antimony) Within 2.32 g/t Oxide AuEq Over 86.8 Meters (1.94 g/t Au And 0.10% Antimony); Discovers High-Grade Oxide Gold-Antimony "Armory Fault" Structure At Bullet Zone
also including 2.27 g/t Au over 3.1 m from 15.2 m
LB25-017 Lower 1.94 g/t Au over 86.8 m from 187.5 m
Feb 18, 2026Limousine Butte ProjectLB25-017 Upper 0.61 g/t Au over 21.3 m from 4.6 m
NevGold Intercepts 12.42 g/t AuEq Over 3.1 Meters (3.06% Antimony And 0.53 g/t Au) Within 3.30 g/t AuEq Over 32.0 Meters (0.63% Antimony And 0.87 g/t Au); Significant Oxide Gold-Antimony Mineralization Intercepted in All Step-out Drillholes at Bullet Zone Discovery
also including 12.42 g/t AuEq over 3.1 m from 102.1 m
LB25-013 0.20 g/t Au over 45.8 m from 59.4 m
Feb 10, 2026Limousine Butte ProjectLB25-019 3.30 g/t AuEq over 32.0 m from 77.7 m
NevGold Intercepts 5.89% Antimony Over 3.0 Meters Within 2.67 g/t AuEq Over 53.3 Meters (0.59% Antimony And 0.36 g/t Au) At Bullet Zone, and Makes New Oxide Gold Discovery Over 150 Meters East
also including 5.89 % Sb over 3.0 m from 44.2 m
LB25-018 Lower 0.11 g/t Au over 70.1 m from 182.9 m
Jan 22, 2026Limousine Butte ProjectLB25-018 Upper 2.67 g/t AuEq over 53.3 m from 0.0 m
NevGold Intercepts Highest-Grade Oxide Antimony At Bullet Zone Discovery: 5.51% Antimony Over 4.6 Meters Within 4.00 g/t AuEq Over 41.1 Meters (0.96% Antimony And 0.29 g/t Au) at Limo Butte, Nevada
LB25-009 Lower 0.12 g/t Au over 6.1 m from 138.7 m
LB25-001 0.09 g/t Au over 48.8 m from 93.0 m
Dec 2, 2025Limousine Butte ProjectLB25-009 Upper 4.00 g/t AuEq over 41.1 m from 15.2 m
NevGold Discovers High-Grade Oxide Antimony “Bullet Zone” From Surface with 2025 Step-Out Drilling: 14.90 g/t AuEq Over 4.6 Meters (3.76% Antimony And 0.29 g/t Au) Within 2.42 g/t AuEq Over 53.3 Meters (0.57% Antimony And 0.22 g/t Au) at Limo Butte, Nevada
LB25-002 Lower 0.45 g/t Au over 57.9 m from 150.9 m
Oct 16, 2025Limousine Butte ProjectLB25-002 Upper 2.42 g/t AuEq over 53.3 m from 3.0 m
NevGold Releases Significant Oxide Gold-Antimony Results: 11.41 g/t AuEq Over 6.1 Meters (10.60 g/t Au And 0.18% Antimony) Within 2.19 g/t AuEq Over 56.4 Meters (1.74 g/t Au And 0.10% Antimony) at the Limousine Butte Project, Nevada
LB010 1.45 g/t Au over 57.2 m from 13.0 m
LB028 0.06 g/t Au over 128.0 m from 36.6 m
Sep 25, 2025Limousine Butte ProjectRR03_01 2.19 g/t AuEq over 56.4 m from 85.3 m
NevGold Releases Some of the Highest Grade Oxide Gold-Antimony Results To Date: 9.68 g/t AuEq Over 11.6 Meters (8.92 g/t Au And 0.17% Antimony) Within 2.85 g/t AuEq Over 60.3 Meters (2.27 g/t Au And 0.13% Antimony) at the Limousine Butte Project, Nevada
RR03_06 0.52 g/t Au over 65.5 m from 27.4 m
LB020 0.25 g/t Au over 58.2 m from 61.0 m
Jun 25, 2025Limousine Butte ProjectLB21-004 2.85 g/t AuEq over 60.3 m from 81.7 m
NevGold Extends Oxide Gold-Antimony Mineralization Over 1.7 Kilometers at Cadillac Valley Target: 2.28 g/t AuEq Over 30.5 Meters (1.29 g/t Au And 0.22% Antimony) Within 1.61 g/t AuEq Over 61.0 Meters (1.08 g/t Au And 0.12% Antimony)
LB155 0.40 g/t Au over 59.5 m from 97.5 m
LB141 0.41 g/t Au over 77.7 m from 61.0 m
Jun 12, 2025Limousine Butte ProjectLB119 1.61 g/t AuEq over 61.0 m from 146.3 m
NevGold Adds More Significant Oxide Gold-Antimony Results: 7.04 g/t AuEq Over 15.2 Meters (6.37 g/t Au And 0.15% Antimony) Within 4.14 g/t AuEq Over 29.0 Meters (3.56 g/t Au And 0.13% Antimony), and Expands Gold-Antimony Mineralization Over 400 Meters Along Strike at the Limousine Butte Project, Ne
LB016 0.16 g/t Au over 36.6 m from 0 m
LB018 0.45 g/t Au over 74.7 m from 36.6 m
Jun 4, 2025Limousine Butte ProjectLIM-46 4.14 g/t AuEq over 29.0 m from 120.4 m
NevGold Adds More Significant Oxide Gold-Antimony Results: 1.47 g/t AuEq Over 74.7 Meters (0.23% Antimony And 0.45 g/t Au), Including 3.59 g/t AuEq Over 18.2 Meters (0.60% Antimony And 0.92 g/t Au), and Also Including 4.61 g/t AuEq Over 6.0 Meters (0.96% Antimony And 0.31 g/t Au) at the Limousine Bu
LB030 0.58 g/t Au over 12.2 m from 170.7 m
LB002 0.07 g/t Au over 25.0 m from 0.0 m
Jun 3, 2025Limousine Butte ProjectLB018 1.47 g/t AuEq over 74.7 m from 36.6 m
NEVGOLD ADDS MORE SIGNIFICANT OXIDE GOLD-ANTIMONY RESULTS: 2.19 G/T AUEQ OVER 64.0 METERS (0.72 G/T AU AND 0.33% ANTIMONY), INCLUDING 4.17 G/T AUEQ OVER 24.1 METERS (1.47 G/T AU AND 0.60% ANTIMONY), AND ALSO INCLUDING 10.86 G/T AUEQ OVER 4.50 METERS (1.43 G/T AU AND 2.10% ANTIMONY) AT THE LIMOUSINE
LB21-003 1.91 g/t Au over 20.1 m from 62.5 m
LB024 0.26 g/t Au over 61.0 m from 79.3 m
May 13, 2025Limousine Butte ProjectLB21-002 2.19 g/t AuEq over 64.0 m from 48.2 m
NevGold Discovers More Significant Oxide Gold-Antimony Results:  2.11 g/t AuEq Over 67.1 Meters (1.30 g/t Au And 0.18% Antimony), Including 4.29 g/t AuEq Over 30.5 Meters (2.79 g/t Au And 0.33% Antimony), and Also Including 7.12 g/t AuEq Over 16.8 Meters (5.05 g/t Au And 0.46% Antimony) at the Limou
LB029 0.53 g/t Au over 79.3 m from 122.0 m
LB013 0.15 g/t Au over 49.7 m from 30.8 m
Apr 24, 2025Limousine Butte ProjectLB023 2.11 g/t AuEq over 67.1 m from 24.4 m
NevGold Discovers More Significant Oxide Gold-Antimony Results: 1.70 g/t AuEq Over 169.2 Meters (0.89 g/t Au And 0.18% Antimony), Including 2.85 g/t AuEq Over 54.4 Meters (2.26 g/t Au And 0.13% Antimony), and Also Including 13.15 g/t AuEq Over 3.1 Meters (0.76 g/t Au And 2.76% Antimony) at the Limo
LB22-006 0.84 g/t Au over 124.7 m from 127.4 m
LB22-019 1.09 g/t Au over 28.9 m from 170.7 m
Apr 10, 2025Limousine Butte ProjectLB22-007 1.70 g/t AuEq over 169.2 m from 213.5 m
NevGold Discovers Further Significant Gold-Antimony Results: 2.46 g/t AuEq Over 86.9 Meters (1.11 g/t Au And 0.30% Antimony), Including 5.75 g/t AuEq Over 12.8 Meters (1.83 g/t Au And 0.87% Antimony), and Also Including 6.77 g/t AuEq Over 6.7 Meters (2.29 g/t Au And +1% Antimony) at the Limousine B
LB-001 0.21 g/t Au over 63.9 m from 13.1 m
LIM-003 2.26 g/t Au over 22.3 m from 67.1 m
Mar 26, 2025Limousine Butte ProjectLB-006 2.46 g/t AuEq over 86.9 m from 36.6 m
NevGold Discovers Significant Gold-Antimony Results: 1.20 G/T Au And 0.64% Antimony (Sb) Over 54.9 Meters, Including 2.12 G/T Au And +1% Antimony (Sb) Over 12.2 Meters at the Limousine Butte Gold-Antimony Project in Nevada
LIM-45 1.23 g/t Au over 36.6 m from 24.4 m
LIM-48 0.77 g/t Au over 61.0 m from 24.4 m
Feb 27, 2025Limousine Butte Gold-Antimony ProjectLIM-40 1.20 g/t Au over 54.9 m from 18.3 m
NevGold Extends Mineralization to 0.74 g/t Au Over 66.8 Meters From Surface, Including 1.40 g/t Au Over 11.3 Meters From 10 Meters Depth At Nutmeg Mountain
NMD0001a 0.20 g/t Au over 53.3 m from 29.0 m
NMD0002 0.16 g/t Au over 10.0 m from 4.8 m
Nov 30, 2023Nutmeg Mountain projectNMD0001 0.56 g/t Au over 23.9 m from 24.1 m