Grid Metals Corp. (OTC:MSMGF) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Grid Metals Commissions Mineral Resource Estimate for Falcon West; Announces Final Assays from Phase 2 Drill Program LU26-53 0.86 % Cs2O over 1.20 m from 11.80 m LU26-55 0.90 % Cs2O over 2.90 m from 23.00 m | Aug 6, 2026 | Falcon West Property | LU26-51 0.57 % Cs2O over 2.85 m from 13.45 m |
| Grid Metals Reports Second Batch of Assays from its Phase 2 Drill Program at Falcon West; Cesium Mineralization Intercepted 75 m North of Lucy South Target Area with 15.05 % Cs2O over 0.35 m from 28.25 m LU26-21 3.15 % Cs2O over 2.20 m from 31.30 m | May 5, 2026 | Falcon West Property | LU26-19 2.51 % Cs2O over 3.65 m from 26.10 m |
| Grid Metals Reports First Assays From Its Phase 2 Drill Program at Falcon West Including 12.9% Cs2O Over 3.8m LU26-03 12.9 % Cs2O over 3.84 m from 19.61 m LU26-04 0.06 % Cs2O over 1.00 m from 31.10 m | Apr 1, 2026 | Falcon West Property | LU26-02 0.72 % Cs2O over 4.10 m from 23.70 m |
| Grid Metals Continues to Expand Cesium Mineralization at Falcon West LU25-13 0.04 % Cs2O over 7.61 m from 1.50 m LU25-15 0.32 % Cs2O over 3.30 m from 24.10 m | Feb 3, 2026 | Falcon West Cesium Project | LU25-12 0.12 % Cs2O over 14.65 m from 56.87 m |
| Grid Metals Intersects High-Grade Cesium at the Falcon West Cesium Project including 14.0% Cs2O over 3.01m with 14.0 % Cs2O over 1.73 m from 27.10 m LU25-02 0.16 % Cs2O over 5.43 m from 27.07 m | Nov 20, 2025 | Falcon West Cesium Project | LU25-01 3.70 % Cs2O over 6.75 m from 22.80 m |
| Grid Metals Corp. Intersects 44 m at 0.93% CuEq, Including 25 m at 1.47% CuEq, in First Drill Holes at Eagle Gabbro with 3.70 % CuEq over 1.10 m from 75.90 m EAG24-02 0.69 % CuEq over 37.00 m from 53.00 m | Dec 2, 2024 | MM copper/nickel project | EAG24-01 0.58 % CuEq over 41.65 m from 45.50 m |
| Grid Metals Intersects High-Grade Lithium Values Including 4.7% Li2O At Maiden Falcon West Drill Program ADL24-02 1.07 % Li2O over 4.99 m from 13.16 m ADL24-09 1.32 % Li2O over 5.80 m from 19.85 m | Apr 29, 2024 | Falcon West Lithium Property | ADL24-01 0.73 % Li2O over 13.95 m from 5.75 m |
| Grid Metals Intersects 7 m at 1.28% Li2O at over 125 m Below the Previously Deepest Drill Holes at Donner Lake; Provides Project Update GDL24-02 2.09 % Li2O over 1.40 m from 16.40 m GDL24-03 1.56 % Li2O over 3.15 m from 419.65 m | Apr 18, 2024 | Donner Lake Lithium Project | GDL24-01 1.28 % Li2O over 6.93 m from 467.42 m |
| Grid Metals Corp. Reports 1.13% Li2O over 10.7 m GLD 23-74 1.56 % Li2O over 6.9 m from 59.1 m GDL 23-78 1.13 % Li2O over 10.7 m from 185.2 m | May 31, 2023 | Donner Lake Lithium Project | GDL 23-68 1.59 % Li2O over 5.9 m from 14.5 m |
| Grid Metals Announces Near Surface High-Grade Lithium, Cesium and Tantalum Drill Core Assays at Falcon West LU-12-05 0.09 % Ta2O5 over 14.4 m from 3.9 m LU-12-03 0.53 % Ta2O5 over 2.7 m from 17.14 m | Mar 28, 2023 | Falcon West Lithium Property | LU-12-02 10.3 % Cs2O over 3.3 m from 25.7 m |
| Grid Metals Corp Announces Strong Second Wave of Results From the Main Dyke Lithium Drilling | Feb 2, 2023 | Donner Lake Lithium Project | GDL22-28 1.62 % Li2O over 6.98 m from 252.22 m |
| Grid Metals Corp Announces Initial Drill Results at Donner Lake Lithium Property, Se Manitoba GDL22-20 1.7 % Li2O over 1.4 m from 81.4 m GDL22-21 1.6 % Li2O over 4.4 m from 116.3 m | Jan 17, 2023 | Donner Lake Lithium Project | GDL22-19 1.7 % Li2O over 3.4 m from 160.4 m |
| New High-Grade Lithium Intersections at Donner Lake Lithium Project; Field Program Underway GDL22-10 0.03 % Li2O over 1.65 m from 148.30 m GDL22-11 1.25 % Li2O over 14.61 m from 141.70 m | Jun 21, 2022 | Donner Lake Lithium Project | GDL22-07 1.53 % Li2O over 8.2 m from 103.5 m |
| New Drill Results Extend Strike Length of the High Grade Northwest Dyke to 500 Metres at Grid Metals Donner Lake Lithium Property GDL22-12 1.48 % Li2O over 5.89 m from 219.56 m GDL22-13 1.52 % Li2O over 2.72 m from 139.48 m | Apr 26, 2022 | Grid Metals Donner Lake Lithium Property | GDL22-03 1.62 % Li2O over 4.13 m from 160.92 m |
| Grid Metals Intersects 13.75 metres of 1.53% Li2O and 8.0 metres of 1.47% in First Two Holes at the Donner Lake Lithium Property Manitoba Canada GDL22-02 1.47 % Li2O over 8.00 m from 57.00 m | Apr 5, 2022 | Donner Lake Lithium Project | GDL22-01 1.53 % Li2O over 13.75 m from 87.50 m |
| Grid Metals Outlines Drills Wide Intercepts of Nickel at Bannockburn Nickel Property; Commences Mineralogical Study on Project with 0.38 % Ni over 7.56 m from 118.00 m GBN21-02 0.28 % Ni over 296.50 m from 40.50 m | Mar 11, 2022 | Bannockburn Nickel Property | GBN21-01 0.24 % Ni over 160.89 m from 71.50 m |
| Grid Provides Manitoba Project Update: Releases High Grade Lithium Drill Intercepts from the Main Dyke Pegmatite; Announces Drilling Plans for Ni-Cu-Co-PGM, Lithium and PGE Projects MLI-18-02 1.6 % Li2O over 2.88 m from 36.75 m MLI-18-03 1.5 % Li2O over 5.41 m from 78.67 m | Sep 14, 2021 | Mayvillle Lithium Property | MLI-18-01 1.7 % Li2O over 3.80 m from 14.68 m |
| Grid Metals Announces Positive Metallurgical Test Results and Initial Rhodium Assays for East Bull Lake EBL21-06 158 ppb Rh over 1.00 m from 51.00 m EBL21-07 189 ppb Rh over 1.00 m from 7.00 m | Aug 23, 2021 | EBL21-01 109 ppb Rh over 1.00 m from 66.00 m | |
| Grid Metals Reports Initial Drilling Results at Bannockburn Nickel with 0.34 % Ni over 48.00 m from 147.00 m | Jun 28, 2021 | Bannockburn Nickel Sulphide Property | GBN21-02 0.28 % Ni over 296.50 m from 40.50 m |
| Grid Metals Reports New Drill Results from East Bull Lake Palladium Property; Completes Initial Drilling at Bannockburn Nickel Property EBL21-11 1.30 g/t PdEq over 14.25 m from 93.00 m EBL21-12 1.60 g/t PdEq over 16.00 m from 94.00 m | Jun 17, 2021 | East Bull Lake Palladium Property | EBL21-10 1.21 g/t PdEq over 14.00 m from 66.00 m |
| Grid Metals Intersects 37.6 g/t Palladium and 21.3% Copper in Massive Sulfide Vein at East Bull Lake; Parisien Lake Zone Continues to Expand with 21.3 % Cu over 0.54 m from 158.76 m EBL21-08 2.05 g/t Pd over 2.75 m from 199.25 m | May 5, 2021 | EBL21-07 11.5 g/t Pd over 1.00 m from 6.00 m | |
| Grid Metals Reports Additional Positive Drill Results from East Bull Lake Palladium Property with 1.38 g/t Pd over 3.00 m from 96.00 m EBL21-05 0.39 g/t Pd over 22.00 m from 52.00 m | Apr 9, 2021 | East Bull Lake Palladium Property | EBL21-04 0.81 g/t PdEq over 77.00 m from 30.00 m |
| Grid Metals Provides New Drill Results From East Bull Lake and Strengthens Technical Team EBL21-02 0.94 g/t PdEq over 24.00 m from 77.00 m EBL21-03 0.59 g/t Pd over 40.35 m from 27.70 m | Mar 11, 2021 | EBL21-01 1.05 g/t PdEq over 54.00 m from 61.00 m | |
| Grid Metals Files NI 43-101 Report on Bannockburn Nickel Property: Historical Drilling Identifies Potential for Bulk Tonnage Nickel Deposit and High Grade Nickel Mineralization MBB4-09 0.327 % Ni over 202.5 m from 63.5 m MBB4-10 0.253 % Ni over 193.2 m from 65 m | Feb 17, 2021 | Bannockburn Nickel Property | MBB4-06 0.255 % Ni over 182.3 m from 65.2 m |
| Grid Metals Discovers Nickel Mineralization and Intersects Additional Pd-Rich Mineralization at East Bull Lake EBL20-13 1.13 g/t PdEq over 119.17 m from 4.00 m EBL20-14 0.83 g/t PdEq over 15.76 m from 84.00 m | Jan 28, 2021 | EBL20-12 0.65 g/t Pd over 12.00 m from 3.00 m | |
| Grid Metals Drills High Grade Lithium Pegmatite MLI-18-02 1.6 % Li2O over 2.9 m from 36.7 m MLI-18-03 1.5 % Li2O over 5.4 m from 78.6 m | Jun 18, 2018 | MLI-18-01 1.7 % Li2O over 3.8 m from 14.7 m |