Talon Metals Corp. (NEO:TLO) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Talon Metals Discovers Mineralized Magmatic Conduit at Roland Nickel-Copper Target in Michigan 26RL0009 0.49 % Ni over 3.11 m from 552.44 m 26RL0011 1.03 % Ni over 0.91 m from 568.75 m | Oct 6, 2026 | Talon's Eagle Mine | 26RL0010 0.77 % Ni over 25.85 m from 569.38 m |
| Talon Metals Reports Assays from Record 46.43-Meter Vault Zone Intercept at Tamarack | Sep 9, 2026 | Tamarack Nickel-Copper-Cobalt Project | 25TK0562A 13.37 % Ni over 46.43 m from 752.97 m |
| Talon Metals Reports New High-Grade Nickel-Copper Assays Across the Vault Zone 25TK0567 0.85 % Ni over 103.42 m from 420.58 m 25TK0568C 3.00 % Ni over 7.15 m from 630.85 m | Aug 4, 2026 | Tamarack Nickel-Copper-Cobalt Project | 25TK0567A 10.90 % Ni over 0.25 m from 660.07 m |
| Talon Metals Reports Additional High-Grade Nickel-Copper Assays from the Vault Zone 25TK0567 3.46 % Ni over 20.19 m from 645.27 m 25TK0568 2.77 % Ni over 20.32 m from 611.57 m | May 19, 2026 | Tamarack Nickel-Copper-Cobalt Project | 25TK0563D 12.05 % Ni over 3.13 m from 757.16 m |
| Talon Metals Confirms Fourth Mineralized Level at the Vault Zone and Reports Additional Massive and Mixed Sulphide Intercepts | Apr 9, 2026 | Tamarack Nickel-Copper-Cobalt Project | 25TK0566 5.56 % Ni over 7.73 m from 721.57 m |
| Talon Metals Reports New Assays and Step-Out Drilling Results | Feb 4, 2026 | 25TK0563B 9.60 % Ni over 8.85 m from 774.40 m | |
| Talon Metals Extends High-Grade Vault Zone with Step-Out Drilling in Multiple Sulphide Stacks | Dec 11, 2025 | Tamarack Nickel-Copper-Cobalt Project | 25TK0565 2.38 % Ni over 19.11 m from 670.00 m |
| Talon Metals Identifies Potential for Repeated Massive Sulphide Accumulations Extending over 300 Meters Below the Deepest Vault Zone Intercept *Combined 14.86 % Ni over 34.90 m from 762.34 m | Nov 4, 2025 | Tamarack Nickel-Copper-Cobalt Project | 25TK0563 1.06 % NiEq over 89.50 m from 419.50 m |
| Talon Metals Reports Record Assays from Historic Tamarack Discovery Grading 57.76% Copper Equivalent or 28.88% Nickel Equivalent over 34.9 Combined Meters 1 including 13.11 % Ni over 20.39 m from 762.34 m 1+2 combined 28.88 % NiEq over 34.90 m from 762.34 m | Jun 5, 2025 | Tamarack Nickel Copper Project | 25TK0563 42.79 % CuEq over 47.33 m from 762.34 m |
| Talon Metals Makes Second Historic Discovery in a Month at Tamarack: 34.9 Meters of Massive Nickel Mineralization Intercepted in a New Zone | May 12, 2025 | Tamarack Nickel Copper Project | 16TK0250 12.62 % Ni over 8.25 m from 707.75 m |
| Talon Metals Assays Confirm Highest Grade Intercept in Tamarack Project History | May 1, 2025 | Tamarack Nickel Copper Project | 16TK0250 12.62 % Ni over 8.25 m from 707.77 m |
| Talon Metals Drills Significant Nickel-Copper Mineralization Intercept at Tamarack During Feasibility Study Drilling | Apr 15, 2025 | Tamarack Nickel Copper Project | 24TK0507 0.47 % Ni over 17.05 m from 274.95 m |
| Talon Metals Reports More Drilling Success and Assays from Its Michigan Boulderdash Discovery 24BD0008 10.47 % CuEq over 2.35 m from 182.11 m 24BD0002 0.43 % Ni over 20.50 m from 10 m | Feb 27, 2025 | Boulderdash discovery | 24BD0003 2.24 % CuEq over 110.31 m from 9.54 m |
| Talon Metals Intercepts 4.81 Meters Grading 4.89% Ni, 4.10% Cu, 0.06% Co, 4.10 g/t Pd, 6.10 g/t Pt and 7.16 G/t Au (9.26% NiEq) 10TK0127 2.80 % Ni over 6.27 m from 377.8 m | May 22, 2024 | Tamarack Nickel-Copper-Cobalt Project | 24TK0503 4.89 % Ni over 4.81 m from 429.63 m |
| Talon Metals Reports 12.7 Meter Intercept Outside of the Resource Area Assaying 7.5% Nickel Equivalent | Mar 20, 2024 | Tamarack Nickel Project | 23TK0447 7.50 % NiEq over 12.72 m from 380.07 m |
| Talon Metals Reports New Assay Results Outside of the Tamarack Resource Area: 9.31% Nickel Equivalent in the Raptor Zone 23TK0483 9.31 % NiEq over 2.20 m from 651.97 m 23TK0490 6.46 % Ni over 0.64 m from 651.88 m | Jan 16, 2024 | Tamarack Nickel Project | 23TK0482 0.75 % Ni over 3.97 m from 294 m |
| Talon Metals Intercepts High-Grade Nickel-Copper Mineralization in 14 New Holes Located Outside of the Tamarack Nickel Project Resource 22TK0424 6.22 % Ni over 10.49 m from 255.29 m 22TK0425 0.84 % Ni over 48.68 m from 310.29 m | Nov 16, 2023 | Tamarack Nickel Project | 22TK0421 8.05 % NiEq over 8.50 m from 221.50 m |
| Talon Metals Drills 101.71 Meters (333 Feet) of 3.04% Nickel Equivalent at the Tamarack Nickel Project | Aug 21, 2023 | Tamarack Nickel Project | 23TK0473 1.94 % Ni over 101.71 m from 332.79 m |
| Talon Metals Confirms High-Grade Mineralization in the New Raptor Zone with Assays Grading up to 6.93% Nickel 22TK0440 4.03 % Ni over 1.81 m from 651.61 m 22TK0439 2.20 % Ni over 2.63 m from 539.86 m | Apr 19, 2023 | Tamarack Nickel Project | 22TK0430 2.48 % Ni over 3.1 m from 670.05 m |
| US EV Battery Supply Chain: Talon Metals Sets Record Massive Sulphide Intercept Length of 23.44 Meters Grading 6.04% Ni, 2.85% Cu (7.58% NiEq) at the Tamarack Nickel Project 21TK0370 2.75 % Ni over 52.26 m from 430.68 m 21TK0380 6.04 % Ni over 23.44 m from 453.73 m | Sep 22, 2022 | Tamarack Nickel Project | 21TK0343 4.91 % Ni over 18.24 m from 360.47 m |
| US EV Battery Supply Chain: Talon Metals Hits 29.39 Meters Grading 2.21% Nickel Equivalent at the Tamarack Nickel Project 21TK0369 2.21 % NiEq over 29.39 m from 180.27 m 22TK0383 1.35 % Ni over 8.47 m from 142.35 m | Sep 8, 2022 | Tamarack Nickel Project | 21TK0368 1.74 % Ni over 14.44 m from 178.71 m |
| US EV Battery Supply Chain: Talon Metals Announces Thick High-Grade Nickel-Copper Assay Results from the Tamarack Nickel Project 21TK0358 5.65 % Ni over 2.93 m from 264.26 m 22TK0390 3.77 % Ni over 2.53 m from 137.65 m | Jul 13, 2022 | Tamarack Nickel Project | 21TK0318 0.79 % Ni over 6.76 m from 244.94 m |
| US EV Battery Supply Chain: Talon Metals Announces Numerous High-Grade Nickel-Copper Intercepts Outside Main Resource Area at Tamarack Nickel Project 21TK0348 5.41 % Ni over 13.19 m from 250.25 m 21TK0339 1.52 % Ni over 5.54 m from 152.35 m | Mar 23, 2022 | Tamarack Nickel Project | 21TK0355 4.88 % Ni over 15.09 m from 202.87 m |
| US EV Battery Supply Chain: Drilling Continues to Deliver High-Grade Nickel and Copper Intercepts at the Tamarack Nickel Project 21TK0316 0.72 % Ni over 7.46 m from 225.76 m 21TK0320 5.68 % Ni over 9.93 m from 267.77 m | Nov 30, 2021 | Tamarack Nickel Project | 21TK0299 0.61 % Ni over 5.77 m from 121.19 m |
| Talon Metals Announces First Assays for Newly Discovered Pool of Massive Nickel-Copper Mineralization: 13.92 Meters (45.5 Feet) Grading 5.54% Ni, 2.14% Cu (6.70% NiEq) | Jul 6, 2021 | Tamarack Nickel-Copper-Cobalt Project | 21TK0313 0.64 % Ni over 6.00 m from 213 m |
| Talon Metals Drilling Extends Thick Nickel-Copper Mineralization to the North-East of the Resource Area at the Tamarack Nickel Project | Jun 15, 2021 | Tamarack Nickel Project | 09TK0094 0.83 % Ni over 27 m from 349.5 m |
| Talon Metals Announces Drilling to Date Intersects Nickel-Copper Mineralization in More than 60 Holes, All Located Outside of the Resource Area at the Tamarack Nickel Project 21TK0283 1.30 % Ni over 30.36 m from 146 m 21TK0290 1.00 % Ni over 31.73 m from 153 m | Jun 1, 2021 | Tamarack Nickel Project | 20TK0267 0.87 % Ni over 16.99 m from 232 m |
| Talon Metals Discovers Thick Pool of Massive Nickel-Copper Mineralization Outside of the Resource Area: 13.88 Meters (45.5 Feet) Starting at Only 225 Meters 15TK0229 7.68 % Ni over 2.84 m from 700.83 m 18TK0264 9.95 % Ni over 0.25 m from 539.04 m | May 19, 2021 | Tamarack Nickel-Copper-Cobalt Project | 12TK0164 3.67 % Ni over 2.89 m from 473.43 m |
| Talon Metals Reports More High-Grade Massive Sulphide Intercepts Outside of the Resource Area at the Tamarack Nickel Project 21TK0283 1.30 % Ni over 30.36 m from 146 m 21TK0290 1.00 % Ni over 31.73 m from 153 m | May 4, 2021 | Tamarack Nickel Project | 20TK0267 0.87 % Ni over 16.99 m from 232 m |
| Talon Metals Intersects 138.18 Meters (453.35 Feet) Grading 2.26% Nickel Equivalent at the Tamarack Nickel Project 08TK0089 2.77 % Ni over 83.5 m from 326.00 m | Apr 13, 2021 | Tamarack Nickel Project | 20TK0277 1.66 % Ni over 138.18 m from 317.5 m |
| Talon Metals Drills Massive Sulphide Nickel Mineralization in First Three Holes Drilled in New Target Area at the Tamarack Nickel Project 07L024 1.86 % Ni over 5.04 m from 133.5 m | Apr 7, 2021 | Tamarack Nickel Project | 13TK0174 1.18 % Ni over 11 m from 170 m |
| Talon Metals Consistently Intersects Nickel-Copper Mineralization in a New Zone Outside of the Tamarack Nickel Project Resource Area 20TK0271 2.12 % Ni over 9.55 m from 236 m | Mar 31, 2021 | Tamarack Nickel-Copper-Cobalt Project | 20TK0266 1.03 % Ni over 11.75 m from 236 m |
| Talon Metals Reports Assays for Record Massive Sulphide Interval at the Tamarack Nickel Project: 21.73 Meters (71.2 Feet) Grading 8.35% NiEq 12TK0160 4.19 % Ni over 6.66 m from 587.82 m 12TK0161 0.46 % Ni over 0.79 m from 511.39 m | Mar 23, 2021 | Tamarack Nickel Project | 20TK0278 6.72 % Ni over 21.73 m from 459.72 m |
| Talon Metals Kicks off the New Year Intersecting 8.39 Meters (27.53 Feet) of Mineralization Grading 8.15% Nickel (9.83% NiEq) at the Tamarack Nickel Project 20TK0266 1.03 % Ni over 11.75 m from 236 m 20TK0271 2.12 % Ni over 9.55 m from 236 m | Jan 12, 2021 | Tamarack Nickel Project | 20TK0273 7.28 % Ni over 9.65 m from 414.73 m |
| Talon Metals Intersects 2.71 Meters (8.9 Feet) of Shallow Mineralization Grading 5.13% Nickel Outside of the Company's Current Resource Area | Dec 15, 2020 | Tamarack Nickel-Copper-Cobalt Project | 20TK0271 2.12 % Ni over 9.55 m from 236 m |
| Talon Drilling Update: Talon Intercepts Massive and Disseminated Sulphides at Shallow Depths More than 300 Meters (985 Feet) Away from Its Current Resource Area 03L007 0.47 % Cu over 28.90 m from 185.8 m 03L010 0.45 % Cu over 14.30 m from 199.5 m | Sep 16, 2020 | Tamarack Nickel-Copper-Cobalt Project | 02L001 0.23 % Cu over 19.50 m from 143 m |
| Talon Intersects Its Highest Nickel and Copper Grades of the Drill Program at the Tamarack Project: 7.14 Meters (23.4 Feet) Grading 10.15% Nickel Equivalent (Or 27.06% Copper Equivalent) 16TK0233E 2.34 % Cu over 10.54 m from 513.11 m 16TK0233C 1.93 % Cu over 5.73 m from 500.45 m | Jun 3, 2020 | Tamarack Project | 12TK0153C 3.26 % Cu over 7.14 m from 578.45 m |
| Talon Drilling Update: Talon Intersects 5.73 Meters (18.8 Feet) of Mixed Massive Sulphides Outside of Talon's Resource Area | Apr 2, 2020 | Tamarack Project | 16TK0233A 4.94 % Ni over 9 m from 508 m |
| First Drill Results: Talon Metals Intercepts 11.36 Meters (37 Feet) of Mixed Massive Sulphides Grading 7.1% Ni, 2.98% Cu, 1.11 g/t PGEs, 0.16 g/t Au and 0.14% Co at Tamarack | Mar 2, 2020 | Tamarack Nickel-Copper-Cobalt Project | 12TK0153A 2.98 % Cu over 11.36 m from 555 m |
| Talon Metals Identifies a New High Conductance Electro-Magnetic Anomaly Within the Tamarack Zone Indicating Potential to Extend MSU Mineralization 08TK0062 0.98 % Ni over 0.80 m from 279 m | Sep 24, 2019 | Tamarack Project | 08TK0061 2.5 % Ni over 0.94 m from 331.32 m |
| Talon Metals announces 167% increase in tonnage for the inferred massive sulphide resource, and an increase in grade from 6.42% to 7.26% NiEq in the Massive Sulphide Unit at Tamarack 08TK0058 4.96 % Ni over 3.3 m from 448.8 m 08TK0068 2.64 % Ni over 5.3 m from 378.4 m | Apr 8, 2015 | Tamarack North Project | 08TK0049 6.03 % Ni over 12 m from 396 m |
| Talon Metals update: 2014 exploration program at Tamarack concludes with a new intercept of 17.34 meters of massive sulphide at 6.17% Ni, 2.34% Cu, 1.72 g/t PGEs and 0.71 g/t Au (7.56% NiEq) 14TK0213 6.26 % NiEq over 7.69 m from 435.66 m 14TK0203 1.07 % NiEq over 23.93 m from 263.07 m | Jan 15, 2015 | Tamarack North Project | 14TK0211 6.80 % NiEq over 3.97 m from 425.03 m |
| Talon Metals update: Drilling at Tamarack intercepts 15.94 meters of massive sulphide at 7.14% Ni, 2.43% Cu, 0.81 g/t Pt and 0.68 g/t Pd 14TK0203 1.07 % NiEq over 23.93 m from 263.07 m 14TK0204 0.88 % NiEq over 47.00 m from 288.00 m | Dec 1, 2014 | Tamarack Project | 14TK0211 6.80 % NiEq over 3.97 m from 425.03 m |