Starr Peak Mining Ltd (NEO:STE) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| STARR PEAK REPORTS 9.49% ZINC-EQUIVALENT OVER 5.90 METERS INCLUDING 3.05 METERS OF 4.17% COPPER AND 17.17% ZINC-EQUIVALENT | May 26, 2022 | NewMétal property | STE-22-092-W3 4.17 % Cu over 3.05 m from 1041.60 m |
| STARR PEAK REPORTS 5.03% ZINC-EQUIVALENT OVER 12.5 METERS, HIGH GRADE COPPER INTERCEPT, AND DISCOVERY OF NEW 1 KM LONG VMS HORIZON STE-21-077 1.69 % Zn over 5.95 m from 750.70 m STE-21-082-W2 1.45 % Zn over 8.80 m from 747.00 m | May 18, 2022 | NewMétal property | STE-22-092-W2 1.27 % Zn over 12.50 m from 1088.00 m |
| STARR PEAK REPORTS VMS INTERCEPTS OF 8.98% ZINC-EQUIVALENT OVER 9.85 METRES AND 1.28% COPPER OVER 7.20 METRES STE-21-81 1.28 % Cu over 7.20 m from 666.40 m STE-21-68 3.62 % Zn over 6.15 m from 743.15 m | Jan 11, 2022 | STE-21-82-W1 4.76 % Zn over 9.85 m from 822.05 m | |
| Starr Peak Reports Maiden Drilling Results up to 20.94% Zn, 0.43% Cu, 39.58 g/t Ag and 0.21 g/t Au Over 12.10 m and a New Discovery at Depth With Additional Massive Sulphides STE-21-04 6.47 % Zn over 12.30 m from 351.00 m STE-21-01 2.40 % Zn over 4.75 m from 189.00 m | May 4, 2021 | STE-21-08 0.21 g/t Au over 12.10 m from 285.60 m |