Rua Gold Inc (NEO:RUA) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| RUA GOLD Reports Strong Drill Results and Advances Pre-Feasibility Study at the Auld Creek Gold-Antimony Project ACDDH066 0.32 g/t Au over 1 m from 60 m ACDDH067 0.57 g/t Au over 0.45 m from 263.3 m | Jun 18, 2026 | Auld Creek Gold-Antimony Project | ACDDH065 0.26 g/t Au over 0.7 m from 541.6 m |
| RUA GOLD Reports High-Grade, near Surface Gold Intercepts at Cumberland, Including 1m @ 26.9 g/t Au (within a Broader Intercept of 14m at 3.4 g/t) and 1m @ 16.2 g/t Au, Confirming Continuity of Mineralization at the Gallant Target CUDDH002 3.4 g/t Au over 14 m from 64 m | May 27, 2025 | Reefton Project | CUDDH001 6.3 g/t Au over 3 m from 44 m |
| RUA GOLD Utilizes VRIFY AI to Prioritize Cumberland, Following up on Exceptional Historic Drill Intercept | Jan 13, 2025 | Cumberland gold camp | GAL001 1911 g/t Au over 1.0 m from 47.0 m |