American Lithium Corp. (NEO:LI) Drill core

American Lithium Corp.

Drill core

ReleaseDateProjectHeadline hole
American Lithium: Recent Drilling at TLC Significantly Expands Higher Grade, Near Surface Lithium Mineralization
TLC-2241 1080 ppm Li over 170 ft from 40 ft
TLC-2242 1090 ppm Li over 265 ft from 10 ft
Dec 8, 2023Tonopah Lithium ProjectTLC-2240 1027 ppm Li over 170 ft from 25 ft
American Lithium Significantly Extends Falchani Lithium Mineralization with Ongoing Drilling - Latest Results up to 5,025 ppm Lithium and 8,290 ppm Cesium
Pz10-TV 2,196 ppm Li over 120.0 m from 0.0 m
Pz05-TV 1,683 ppm Li over 160.15 m from 0.0 m
Aug 24, 2023Falchani Lithium projectPz07-TV 2,345 ppm Li over 95.0 m from 0.0 m
American Lithium Intersects Highest Grade Lithium and Cesium Samples Encountered to Date at Falchani - Up to 5,645 ppm Lithium and up to 12,610 ppm Cesium
Pz03-TV 1,428 ppm Li over 63.0 m from 0.0 m
Pz06-TV 2,739 ppm Li over 86.0 m from 0.0 m
Jul 12, 2023Falchani Lithium projectPz04-TV 5,645 ppm Li over 1.0 m from 54.0 m
American Lithium Reports Highest Grade Assay To-Date and Expands TLC Discovery Project as US Senate Discusses Domestic Resource Security
TLC-1909 825 ppm Li over 74.7 m from 3.0 m
TLC-1910 834 ppm Li over 88.4 m from 1.5 m
May 22, 2019TLC sedimentary lithium projectTLC-1908 665 ppm Li over 77.7 m from 13.7 m
American Lithium 162 Assays for Near Surface Brine Samples and Sonic Core Samples, North Playa Fish Lake Valley
L16-24 153.5 ppm Li over 5 ft from 0 ft
Apr 18, 2017North Playa, Fish Lake ValleyBH13B 452 ppm Li over 5 ft from 0 ft
Lithium One Concludes Summer Drill Program with BEST INTERCEPTS TO DATE from James Bay Lithium Project, INCLUDING 64.0m of 1.65% Li2O and 45.5 of 1.80% Li2O
JBL09-65 1.66 % Li2O over 57.9 m from 41.95 m
JBL09-80 1.80 % Li2O over 45.5 m from 44.50 m
Oct 14, 2009James Bay Lithium ProjectJBL09-66 1.65 % Li2O over 64.0 m from 107.67 m
Lithium One Reports FURTHER DRILL RESULTS including 17.2 METRES of 1.97% Li2O at the James Bay Lithium Project
JBL09-54 1.58 % Li2O over 19.1 m from 65.94 m
JBL09-59 1.40 % Li2O over 20.5 m from 37.80 m
Oct 7, 2009James Bay Lithium ProjectJBL09-53 1.97 % Li2O over 17.2 m from 15.00 m
Lithium One Reports ADDITIONAL DRILL RESULTS including 33.5 METRES OF 1.68% Li2O at the James Bay Lithium Project
JBL09-47 1.72 % Li2O over 23.0 m from 84.90 m
JBL09-45 1.21 % Li2O over 30.3 m from 41.48 m
Sep 17, 2009James Bay Lithium ProjectJBL09-43 1.68 % Li2O over 33.5 m from 5.40 m
Lithium One Reports ADDITIONAL DRILL RESULTS for its James Bay Lithium Project
JBL09-28 1.98 % Li2O over 21.00 m from 48.53 m
JBL09-34 1.65 % Li2O over 23.46 m from 136.24 m
Sep 2, 2009James Bay Lithium ProjectJBL09-23 1.76 % Li2O over 26.97 m from 26.60 m