Galiano Gold, Inc. (NEO:GAU) Drill core

Galiano Gold, Inc.

Drill core

ReleaseDateProjectHeadline hole
Galiano Gold Expands Abore Mineralized System with New Intercepts Including 32m @ 4.7 g/t Au and 53m @ 3.9 g/t Au
ABDD26-456 8.4 g/t Au over 5.7 m from 456.9 m
ABDD26-458 3.0 g/t Au over 21.2 m from 508.0 m
May 11, 2026Asanko Gold MineABDD26-454 1.0 g/t Au over 19.8 m from 473.2 m
Galiano Gold Expands Abore High-Grade Footprint with Multiple Intercepts in Latest Drilling Including 14.2 g/t Au over 15m and 4.7 g/t Au over 24m
ABDD25-428 0.6 g/t Au over 3.9 m from 173.2 m
ABDD25-429 4.7 g/t Au over 23.8 m from 151.2 m
Jan 29, 2026Asanko Gold MineABDD25-424 2.5 g/t Au over 3.0 m from 28.5 m
Galiano Gold Advances Towards a Maiden Underground Resource at Abore with Additional High-Grade Results Encountered Including 4.7 g/t Au over 28m and 3.5 g/t Au over 17m
ABDD25-391 1.4 g/t Au over 19.3 m from 196.0 m
ABDD25-392 1.2 g/t Au over 13.2 m from 418.0 m
Nov 17, 2025Asanko Gold MineABDD25-390 1.2 g/t Au over 4.2 m from 242.8 m
GALIANO GOLD REPORTS EXCEPTIONAL DRILL RESULTS AT ABORE, INCLUDING 23m @ 6.8 g/t Au AND 16.4m @ 5.3 g/t Au, WITH MULTIPLE ORE SHOOTS AND NEW HIGH-GRADE ZONE IDENTIFIED
ABPC25-368 2.0 g/t Au over 44.8 m from 279.3 m
ABDD25-380 2.9 g/t Au over 30.6 m from 147.9 m
Aug 20, 2025Asanko Gold MineABDD25-388 6.8 g/t Au over 23.0 m from 240.0 m
GALIANO GOLD ANNOUNCES POSITIVE INITIAL DEEP DRILLING RESULTS AT ABORE INCLUDING 36m @ 2.5 g/t Au
ABDD25-350 2.5 g/t Au over 36.2 m from 370 m
ABPC25-352 1.9 g/t Au over 17.2 m from 415 m
Jul 14, 2025Asanko Gold MineABDD25-349 0.6 g/t Au over 3 m from 438 m
GALIANO GOLD ANNOUNCES DISCOVERY OF NEW HIGH-GRADE ZONE AT ABORE WITH INTERCEPT OF 50m @ 3.2 g/t Au & RESULTS OF INFILL DRILLING PROGRAM
ABDD25-331 2.24 g/t Au over 5.0 m from 7.6 m
ABDD25-340 0.72 g/t Au over 9 m from 61 m
May 5, 2025Asanko Gold MineABPC23-224 12.44 g/t Au over 45.0 m from 191.0 m
GALIANO GOLD ANNOUNCES SIGNIFICANT DRILL RESULTS FROM ABORE, INCLUDING 45m @ 12.4 g/t Au & 37m @ 10.6 g/t Au
ABPC23-226 10.58 g/t Au over 37.0 m from 199.0 m
ABPC23-239 3.29 g/t Au over 54.0 m from 207.0 m
Mar 11, 2024Asanko Gold MineABPC23-224 12.44 g/t Au over 45.0 m from 191.0 m
Asanko Gold Drills 57 Meters at 3.0 g/t Gold at Tontokrom
TTPC19-002 0.94 g/t Au over 21 m from 64 m
TTPC19-004 0.58 g/t Au over 7 m from 31 m
Apr 30, 2019Tontokrom TargetTTPC19-001 2.62 g/t Au over 13 m from 128 m