Batero Gold Corp. (NEO:BAT) Drill core

Batero Gold Corp.

Drill core

ReleaseDateProjectHeadline hole
Batero Gold Drills 106.9 Metres Grading 1.47 g/t Au at Batero-Quinchia Deposit
DDH-ZO-002 0.81 g/t Au over 40.1 m from 1.90 m
DDH-ZO-003 1.00 g/t Au over 29.8 m from 2.20 m
Aug 18, 2017Batero-Quinchia DepositDDH-ZO-001 0.48 g/t Au over 11.2 m from 0.80 m
Batero Extends Continuity of Higher Grade Core of Oxidized Gold Mineralization
Oxide Zone 1.19 g/t Au over 22.30 m from 3.70 m
Transition Zone 0.33 g/t Au over 23.60 m from 21.40 m
Mar 8, 2016La Cumbre depositDDH-ZO-001 0.34 g/t Au over 72.40 m from 0.80 m