Arizona Eagle Mining Corp. (NEO:AZEM) Drill core

Arizona Eagle Mining Corp.

Drill core

ReleaseDateProjectHeadline hole
Arizona Eagle Mining Corp. Announces Discovery of Zinc-Silver VMS Mineralization Northeast of McCabe Mine in Drill Intersections
Eagle-26-02 5.73 g/t Au over 4.2 m from 402.6 m
Eagle-26-02a 1.16 g/t Au over 1.7 m from 375.5 m
Aug 25, 2026Eagle ProjectEagle-26-01 2.73 g/t Au over 1.2 m from 355.7 m
Arizona Eagle Mining Corp. Announces Discovery in Phase 1 Drilling, Extends Gold Mineralization Northeast of Historic McCabe Gold Mine
Eagle 26-02 including and including 5.73 g/t Au over 4.2 m from 402.6 m
Eagle 26-02A 1.16 g/t Au over 1.7 m from 375.5 m
May 6, 2026Eagle ProjectEagle 26-01 2.73 g/t Au over 1.2 m from 355.7 m
Core Nickel Announces Assay Results from Winter Drill Program at Halfway Lake and Provides Update on the Mel Deposit
HFW-25-010 0.17 % Ni over 1.0 m from 39.2 m
HFW-25-015 0.65 % Ni over 1.1 m from 43.0 m
Jun 12, 2025Halfway Lake ProjectHFW-25-007 0.80 % Ni over 0.7 m from 72.8 m