Green Bridge Metals Corporation (MUN:J48) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Green Bridge Metals Intersects 195.0 Metres Grading 0.25% Cu and 10.18% TiO2 at Titac South, Minnesota; Step-Out Hole Confirms Mineralization at Previously Untested Geophysical Target TS26-004a 0.25 % Cu over 195.0 m from 65.0 m TS26-007 0.06 % Cu over 362.0 m from 20.0 m | Sep 10, 2026 | Titac Project | TS26-001 0.08 % Cu over 272.8 m from 26.2 m |
| Green Bridge Metals Reports Initial Assays from Drill Program TS26-003 0.30 % Cu over 190.0 m from 39.0 m TS26-005 0.31 % Cu over 152.0 m from 231.0 m | May 27, 2026 | Titac Project | TS26-002a 0.12 % Cu over 278.1 m from 32.8 m |