NGEx Minerals Ltd. (LSX:A41KP9) Drill core

NGEx Minerals Ltd.

Drill core

ReleaseDateProjectHeadline hole
NGEx Drills 20.50m at 17.83% CuEq and 13.50m at 11.36% CuEq at Lunahuasi
plus 11.36 % CuEq over 13.50 m from 385.50 m
DPDH075 3.30 % Cu over 3.50 m from 290.00 m
Jul 30, 2026DPDH073 1.68 % Cu over 2.10 m from 175.00 m
NGEx Drills 19.00m at 25.84% CuEq Within 57.75m at 9.41% CuEq at Lunahuasi
plus 9.41 % CuEq over 57.75 m from 310.25 m
DPDH071 1.27 % Cu over 573.40 m from 274.60 m
Jul 8, 2026DPDH069 1.07 % Cu over 14.40 m from 437.00 m
NGEx Drills 1,540m at 1.17% CuEq, Including 88m at 8.65% CuEq in Saturn Zone and 501m at 0.73% CuEq in Expanded Porphyry Deposit
HS Zone 1.31 % Cu over 663.00 m from 572.00 m
incl - Saturn 8.65 % CuEq over 88.00 m from 572.00 m
Jun 23, 2026DPDH064 1.17 % CuEq over 1540.10 m from 196.00 m
NGEx Minerals Highlights Lunahuasi High-Grade Gold with 17.3m at 207.79 g/t Au, Including 2.00m at 1,740.00 g/t Au, plus 4.88m at 60.10 g/t Au
DPDH063 60.10 g/t Au over 4.88 m from 831.50 m
DPDH067 1.19 % Cu over 6.10 m from 171.30 m
May 13, 2026DPDH062 0.57 % Cu over 1380.30 m from 224.00 m
NGEx Reports Q1 2026 Results; Phase 4 Lunahuasi Drill Program Continues to Highlight Size, Grade and Upside
DPDH061 5.49 g/t Au over 20.00 m from 310.00 m
May 8, 2026LunahuasiDPGT004 4.71 % CuEq over 23.10 m from 187.9 m
NGEx Drills 34m at 7.25% CuEq plus 48m at 7.72% CuEq, 180m Apart in Mars; Discovers New Zone 300m East of Mars with 23m at 4.72% CuEq
plus 7.25 % CuEq over 33.85 m from 350.65 m
DPDH065 0.72 % Cu over 12.00 m from 188.00 m
Apr 30, 2026DPDH061 0.79 % Cu over 13.30 m from 189.70 m
NGEx Minerals Drills 335.15m at 4.08% CuEq including 19.50m at 18.96% CuEq at Lunahuasi; Increases targeted Phase 4 program to 30,000m
plus 3.41 % Cu over 6.00 m from 357.00 m
DPDH058 0.58 % Cu over 29.70 m from 200.00 m
Mar 23, 2026DPDH056 1.51 % Cu over 10.55 m from 295.00 m
NGEx Minerals Drills 1,246.50m at 0.86% CuEq plus 131.00m at 5.09% CuEq including 5.00m at 29.05% CuEq at Lunahuasi
DPDH055 0.59 % Cu over 729.00 m from 196.00 m
DPDH057 5.09 % CuEq over 131.00 m from 424.00 m
Feb 10, 2026LunahuasiDPDH049 0.86 % CuEq over 1246.50 m from 116.50 m
NGEx Minerals Drills 94.00m at 8.99% CuEq including 21.70m 31.92% CuEq at Lunahuasi
plus 8.99 % CuEq over 94.00 m from 271.00 m
DPDH051 0.66 % Cu over 20.80 m from 188.20 m
Jan 12, 2026DPDH050 1.74 % Cu over 16.40 m from 592.20 m
NGEx Minerals Drills 22.85m at 4.01% Cu and 11.30 g/t Au (14.26% CuEq) within 126.6m at 2.16% Cu and 3.30 g/t Au (5.09% CuEq)Dec 17, 2025DPDH048 2.16 % Cu over 126.55 m from 497.15 m
NGEx Discovers High-Grade Gold Veins at Lunahuasi; Drills 14.74 g/t Gold (Uncut) over 104.80m Core Length, Including 504.00 g/t Gold (Uncut) over 1.55m Core Length and 142.27 g/t Gold (Uncut) over 2.20m Core Length
plus 1.61 % Cu over 462.20 m from 259.00 m
DPDH045 5.28 % Cu over 15.40 m from 191.60 m
Jul 8, 2025LunahuasiDPDH044 0.33 % Cu over 7.70 m from 171.30 m
NGEx Minerals Drills 46.8m at 9.55% CuEq plus 48.9m at 7.75% CuEq at Lunahuasi
plus 9.55 % CuEq over 46.80 m from 492.20 m
DPDH041 0.46 % Cu over 13.00 m from 133.00 m
Jul 2, 2025Lunahuasi high-grade copper-gold-silver projectDPDH040 1.01 % Cu over 133.30 m from 523.00 m
NGEx Minerals Drills 16.4m at 12.97% CuEq plus 13.0m at 9.96% CuEq at Lunahuasi
plus 12.97 % CuEq over 16.35 m from 166.90 m
DPDH037 0.69 % Cu over 17.10 m from 521.40 m
Jun 19, 2025Lunahuasi high-grade copper-gold-silver projectDPDH036 1.48 % Cu over 3.00 m from 170.00 m
NGEx Minerals Discovers Major Copper-Gold Porphyry System at Lunahuasi, Drills 1,619.4m at 0.87% CuEq including 876.4m at 1.13% CuEq
DPDH029 3.89 % Cu over 3.70 m from 318.00 m
plus 3.72 % Cu over 13.00 m from 540.00 m
May 21, 2025Lunahuasi high-grade copper-gold-silver projectDPDH027 0.87 % CuEq over 1619.40 m from 385.60 m
NGEx Minerals Drills 40.0m at 7.02% CuEq, including 10.1m at 18.21% CuEq, plus 271.9m at 2.88% CuEq at Lunahuasi
plus 7.02 % CuEq over 40.00 m from 935.00 m
DPDH034 2.88 % CuEq over 271.90 m from 564.00 m
Apr 24, 2025Lunahuasi high-grade copper-gold-silver projectDPDH033 0.27 % Cu over 14.00 m from 782.00 m
NGEx Drills 51.50m at 4.37% Cu and 10.42 g/t Au (12.26% CuEq), including 21.50m at 8.71% Cu and 23.81 g/t Au (26.68% CuEq), and 27.40m at 7.80% Cu and 23.17 g/t Au (25.19% CuEq) at Lunahuasi
plus 7.80 % Cu over 27.40 m from 461.00 m
DPDH031 1.68 % Cu over 31.65 m from 128.90 m
Mar 13, 2025LunahuasiDPDH030 10.72 % Cu over 0.90 m from 240.00 m
NGEx Drills 53.50m at 7.79% CuEq, 75.45m at 4.95% CuEq, and 15.25m at 16.56% CuEq at Lunahuasi, With Successful Step Out Holes Now Extending Mineralization Over 1,000m North to South
DPDH025 0.81 % Cu over 79.50 m from 902.50 m
plus 7.79 % CuEq over 53.50 m from 1219.50 m
Feb 19, 2025LunahuasiDPDH024 4.95 % CuEq over 75.45 m from 773.80 m
NGEx Minerals Drills 51.10m at 13.84% CuEq within 205.35m at 5.08% CuEq at Lunahuasi, Expands Program to 25,000m with Two Additional Rigs
plus 5.08 % CuEq over 205.35 m from 378.50 m
DPDH025 2.51 % Cu over 7.00 m from 326.50 m
Jan 22, 2025Lunahuasi high-grade copper-gold-silver projectDPDH024 2.73 % Cu over 4.85 m from 492.00 m
NGEx Minerals Drills 12.25m at 23.35% CuEq and 11.90m at 10.74% CuEq at Lunahuasi
plus 2.87 % Cu over 2.70 m from 352.30 m
DPDH025 10.74 % CuEq over 11.90 m from 143.80 m
Dec 18, 2024Lunahuasi high-grade copper-gold-silver projectDPDH024 23.35 % CuEq over 12.25 m from 139.75 m
NGEx Reports Q2 2024 Results; 2023-2024 Lunahuasi Drill Program Successfully Expands High-Grade Mineralization and Confirms Significant Scale Potential
DPDH015 0.73 % Cu over 328.0 m from 556.0 m
DPDH016 0.81 % Cu over 179.6 m from 587.4 m
Aug 12, 2024LunahuasiDPDH013 0.75 % Cu over 509.4 m from 524.0 m
NGEx Reports Lunahuasi Step-Out Drilling Intersects 726.5m at 1.66% Copper Equivalent ("CuEq") and 58.1m at 6.04% CuEq, including 4.8m at 41.12% CuEq, Significantly Expanding High-Grade Mineralization
plus 1.66 % CuEq over 726.5 m from 380.0 m
DPDH020 0.74 % Cu over 750.1 m from 204.0 m
Jun 19, 2024LunahuasiDPDH019 0.24 % Cu over 14.0 m from 524.0 m
NGEx Drills 429.4 Metres at 2.31% Copper Equivalent, Including 102.7 Metres at 4.26% Copper Equivalent and 13.2 Metres at 16.24% Copper Equivalent at Lunahuasi
plus 2.31 % CuEq over 429.4 m from 738.0 m
May 9, 2024LunahuasiDPDH018 0.74 % Cu over 6.1 m from 171.6 m
NGEX DRILLS 509 METRES AT 1.33% COPPER EQUIVALENT AND 328 METRES AT 1.10% COPPER EQUIVALENT AT LUNAHUASI, CONFIRMING EXTENSIVE PORPHYRY-RELATED STOCKWORK MINERALIZATION IN ADDITION TO EXTENSIONS OF PREVIOUSLY REPORTED HIGH-GRADE COPPER-GOLD-SILVER VEINS
plus 1.33 % CuEq over 509.4 m from 524.0 m
DPDH013 0.94 % Cu over 24.0 m from 162.0 m
Apr 30, 2024LunahuasiDPDH012 0.25 % Cu over 181.0 m from 59.0 m
NGEx Minerals Drills 23.0 Metres at 23.02% Copper Equivalent Within 71.9 Metres at 9.63% Copper Equivalent at Lunahuasi
plus 9.63 % CuEq over 71.9 m from 171.2 m
DPDH011 0.28 % Cu over 14.0 m from 168.0 m
Feb 21, 2024LunahuasiDPDH010 3.59 % Cu over 3.7 m from 121.5 m
NGEx Minerals Drills 62 Metres At 6.98% Copper Equivalent And 63 Metres At 5.84% Copper Equivalent At Lunahuasi
plus 5.84 % CuEq over 62.6 m from 226.0 m
DPDH010 3.59 % Cu over 3.7 m from 121.5 m
Jan 8, 2024LunahuasiDPDH009 6.98 % CuEq over 62.0 m from 144.0 m
NGEx Minerals Reports Q3 2023 Results; Resumption of Drilling at Lunahuasi after $85.7 Million Financing
DPDH005 3.50 % CuEq over 33.4 m from 636.0 m
DPDH007 4.05 % CuEq over 90.0 m from 74.0 m
Nov 24, 2023LunahuasiDPDH002 7.52 % CuEq over 60.0 m from 212.0 m
NGEx Minerals Drills 160m at 0.82% CuEq and 234m at 0.65% CuEq Extending Fenix and Alicanto Zones at the Los Helados Project
LHDH086-1 0.82 % CuEq over 160.0 m from 572.0 m
LHDH086-2 0.38 % Cu over 874.0 m from 442.0 m
Jul 18, 2023Los Helados ProjectLHDH085 0.65 % CuEq over 234.0 m from 668.0 m
NGEx Minerals Drills 90m at 4.05% CuEq and 21m at 8.09% CuEq, Confirming Major Discovery at Lunahuasi (ex-Potro Cliffs) Project
plus 8.08 % CuEq over 20.8 m from 439.2 m
DPDH004 0.31 % Cu over 20.0 m from 112.0 m
Jul 4, 2023Potro Cliffs projectDPDH002 5.81 % Cu over 4.0 m from 150.0 m
NGEx Minerals - Fenix Rising: 390m at 1.13% CuEq and 344m at 0.90% CuEq
LHDH81-3 0.54 % Cu over 452.0 m from 814.0 m
LHDH084 1.13 % CuEq over 390.0 m from 1110.0 m
Apr 13, 2023Los Helados copper-gold projectLHDH081-2 0.90 % CuEq over 343.8 m from 1206.0 m
NGEx Minerals Reports New Discovery at Potro Cliffs - Drills 60m at 7.52% CuEq including 10m at 18.00% CuEqApr 4, 2023Potro Cliffs projectDPDH002 7.52 % CuEq over 60.0 m from 212.0 m
NGEx Minerals Extends Both the Alicanto (122m at 1.05% CuEq) and Fenix Zones (220m at 0.72% CuEq); Four Drills Active at Los Helados
LHDH081 0.72 % CuEq over 220.0 m from 1144.0 m
LHDH082 0.38 % Cu over 981.3 m from 152.0 m
Jan 26, 2023Los Helados copper-gold projectLHDH079 0.32 % Cu over 1215.2 m from 148.0 m
NGEx Minerals Reports 989m at 0.69% CuEq, including 220m at 0.95% CuEq at Los Helados Project
Upper ext 0.53 % Cu over 108.0 m from 42.0 m
Lower ext 0.57 % Cu over 252.0 m from 526.0 m
Jul 6, 2022Los Helados ProjectLHDH077 0.69 % CuEq over 989.0 m from 0.0 m
NGEx Minerals Discovers Third High-Grade Zone at Los HeladosJun 12, 2022Los Helados ProjectLHDH078 0.61 % CuEq over 474.8 m from 566.0 m
NGEx Minerals Reports 1,290m at 0.74% CuEq including 142m at 1.38% CuEq in Second High-Grade Zone, Confirming Existence of at Least Two Separate High-Grade Centres at Los HeladosMay 24, 2022Los Helados copper-gold projectFSDH076 0.74 % CuEq over 1290.0 m from 110.0 m
NGEx Minerals Reports 1,016m at 0.65% CuEq including 294m at 0.87% CuEq at Los Helados Project
FSDH075 0.39 % Cu over 908.0 m from 14.0 m
May 16, 2022Los Helados ProjectLHDH074 0.65 % CuEq over 1016.3 m from 42.0 m
NGEx Minerals Reports 876 metres at 0.74% CuEq, including 210 metres at 1.06% CuEq at the Los Helados Copper-Gold DepositApr 26, 2022Los Helados copper-gold projectLHDH073 0.74 % CuEq over 876.0 m from 124.0 m
NGEx Minerals Reports 1.05 g/t gold over 150 metres and 0.63 g/t gold over 198 metres in near-surface oxide material at Valle Ancho Project, Catamarca, Argentina
VADH002 0.63 g/t Au over 198.0 m from 0.0 m
Feb 28, 2022Valle Ancho ProjectVADH001 1.05 g/t Au over 150.0 m from 0.0 m
NGEx Minerals Announces Assay Results from Previously Unsampled Geotechnical Drill Holes into High-Grade Core of Los Helados Deposit: including 440m @ 1.03% CuEq (0.82% Cu, 0.31 g/t Au, 2.9 g/t Ag)
LHDHG03 1.03 % CuEq over 440.0 m from 596.0 m
Sep 8, 2021LHDHG02A 0.52 % Cu over 1101.0 m from 0.0 m