Nova Pacific Metals Corp. (LSX:A40GFH) Drill core

Nova Pacific Metals Corp.

Drill core

ReleaseDateProjectHeadline hole
Nova Pacific Metals Continues to Report Promising Results from Phase 1 Drilling at the Lara VMS Project
NP25-040 1.42 g/t AuEq over 6 m from 149 m
Sep 11, 2025Lara VMS ProjectNP25-039 0.65 g/t AuEq over 5 m from 183 m
Nova Pacific Reports Best Drill Results to Date, Including 5.1 g/t AuEq Over 11 m
NP25-014 5.1 g/t AuEq over 11 m from 233 m
NP25-041 0.7 g/t AuEq over 12.9 m from 288.1 m
Aug 26, 2025Vancouver Island. The Lara ProjectNP25-009 1.8 g/t AuEq over 5.35 m from 212 m
Nova Pacific Reports Strong Intercepts Including 2.5 g/t AuEq Over 10 m, 4.0 g/t AuEq Over 6.05 m, and 1.7 g/t AuEq Over 12 m at Lara VMS Project on Vancouver Island, B.C.
NP25-018 0.6 g/t AuEq over 3 m from 47 m
NP25-022 1.7 g/t AuEq over 12 m from 166 m
Aug 14, 2025Lara VMS ProjectNP25-008 0.5 g/t AuEq over 2 m from 144 m
Nova Pacific Drills 11 m @ 1.8 g/t AuEq at Lara VMS Project on Vancouver Island, B.C. with 29 Holes PendingJul 15, 2025Lara VMS ProjectNP25-005 1.8 g/t AuEq over 11 m from 135 m
Nova Pacific Drills 16.2m @ 3.2 g/t AuEq and 17.64m @ 1.92 g/t AuEq from First Assay Results at Lara VMS Project on Vancouver Island, B.C.
NP25-002 0.9 g/t AuEq over 2 m from 28 m
NP25-003 1.5 g/t AuEq over 2 m from 73.18 m
Jun 24, 2025Lara VMS ProjectNP25-001 0.7 g/t AuEq over 2.03 m from 26.67 m
Nova Pacific Metals Releases Complete Back-Pack Drilling Results at Lara
24BP02 3.16 g/t Au over 0.90 m from 0.00 m
24BP03 4.60 g/t Au over 0.90 m from 0.00 m
Dec 19, 2024Lara Project24BP01 12.70 g/t Au over 1.00 m from 0.00 m