Power Metal Resources PLC (LSX:A403N7) Drill core

Power Metal Resources PLC

Drill core

ReleaseDateProjectHeadline hole
Block 8 Oman: Drilling Programme Results
AM25DD002 0.19 % Cu over 4 m from 85 m
AM25DD003 0.18 % Cu over 1 m from 42 m
Dec 15, 2025Block 8AM25DD001 0.36 % Cu over 1 m from 72 m
Victoria Goldfields – Berringa Drilling Results
BE23D002 2.38 g/t Au over 5.2 m from 88.9 m
BE23D003 1.89 g/t Au over 1.7 m from 105 m
May 5, 2023Berringa Gold MineBE23D001 0.25 g/t Au over 1.4 m from 381 m
Silver Peak Canada - Overlimit Assay Results
DDH21-2 10,131 g/t AgEq over 0.76 m from 0 m
DDH21-3 2,725 g/t Ag over 0.55 m from 0 m
Dec 1, 2021Silver Peak ProjectDDH21-1 4,649 g/t AgEq over 0.9 m from 0 m
Silver Peak Canada - Drill Programme Assay Results
DDH21-2 8,692.2 g/t Ag over 0.76 m from 0 m
DDH21-3 2,724.6 g/t Ag over 0.55 m from 0 m
Nov 12, 2021Silver Peak ProjectDDH21-1 3,998.2 g/t Ag over 0.9 m from 0 m
Botswana Molopo Farms Complex - Assay ResultsApr 8, 2021MFC ProjectKKME 1-6 1,417 ppm Ni over 0.72 m from 292.68 m
Gold Drill Results and Soil Sample Programme
FDD029 7.50 g/t Au over 0.7 m from 30.8 m
FDD030 0.7 g/t Au over 10.5 m from 7.6 m
Sep 26, 2017FDD028 0.9 g/t Au over 1.5 m from 0.0 m
Ferensola Gold - Phase 3 Assay Results
FDD026 2.5 g/t Au over 1.2 m from 0.0 m
FDD027 2.8 g/t Au over 3.0 m from 294.0 m
Aug 3, 2017FDD025 6.9 g/t Au over 1.6 m from 257.4 m
High Grade Gold Intersected at Southern Target TZ4Jun 7, 2017Ferensola Gold ProjectFDD021 5.2 g/t Au over 1.22 m from 116.45 m
Ferensola Gold - Batch 1 Assay ResultsMay 12, 2017Ferensola Gold ProjectFDD014 37 g/t Au over 0.75 m from 142.25 m
Ferensola Gold - Assay Results and Project Update
FDD002 1.72 g/t Au over 5 m from 19 m
FDD003 2.29 g/t Au over 2.7 m from 51.3 m
Apr 15, 2016Ferensola Gold ProjectFDD001 3.25 g/t Au over 2.45 m from 120 m
Ferensola Gold - Batch 2 Assay Results
FDD002 3.05 g/t Au over 4.2 m from 83.8 m
FDD003 2.29 g/t Au over 2.7 m from 51.3 m
Jan 6, 2016FDD001 3.25 g/t Au over 2.45 m from 120 m