Energy Transition Minerals Ltd. (LSX:A3D10V) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Results from Second Drilling Program at Villasrubias VR-13 0.25 % Li2O over 1.85 m from 50.65 m VR-19 0.670 % Li2O over 0.70 m from 26.90 m | Sep 18, 2024 | Villasrubias Lithium Project | VR-12A 0.53 % Li2O over 1.80 m from 52.55 m |
| Drilling Results from the Villasrubias Project VR-02 0.29 % Li2O over 0.70 m from 14.15 m VR-03 0.27 % Sn over 0.28 m from 36.42 m | Sep 6, 2023 | Villasrubias Project | VR-01 1.23 % Li2O over 1.63 m from 23.85 m |
| High Grade Lithium Intersected at Villasrubias Project VR-02 0.29 % Li2O over 0.70 m from 14.15 m | Jun 28, 2023 | Villasrubias Project | VR-01 1.23 % Li2O over 1.63 m from 23.85 m |