Shearwater Group plc (LSX:A2PRX8) Drill core

Shearwater Group plc

Drill core

ReleaseDateProjectHeadline hole
Cabeza drilling results and update
CABDD002 0.35 g/t Au over 24.0 m from 0 m
CABDD003 0.64 g/t Au over 3.0 m from 52 m
Jun 28, 2013Cabeza de Caballo PermitCABDD001 0.31 g/t Au over 1.0 m from 17 m
Peralonso Drilling Results And Update
PERDD002 1.14 g/t Au over 5.8 m from 8.9 m
PERDD004 4.51 g/t Au over 1.0 m from 72.0 m
Mar 11, 2013Peralonso PermitPERDD001 3.39 g/t Au over 10.1 m from 46.9 m
Peralonso Drilling Results
PERDD005 1.87 g/t Au over 6.0 m from 75.0 m
PERDD006 1.38 g/t Au over 6.0 m from 0.0 m
Jan 23, 2013Peralonso PermitPERDD004 2.42 g/t Au over 7.0 m from 79.0 m