ECR Minerals plc (LSX:A2DGMM) Drill core

ECR Minerals plc

Drill core

ReleaseDateProjectHeadline hole
Blue Mountain drilling results & operations update
S29H6 2380 ppm Au over 1 m from 6 m
S27H12 1630 ppm Au over 1 m from 6 m
Dec 12, 2025Blue Mountain ProjectS28H5 1600 ppm Au over 1 m from 6 m
Strong Maiden Drill Results & Operations Update
LWDR025 3.33 g/t Ag over 4 m from 14 m
LWDR026 2.04 g/t Au over 1 m from 21 m
Dec 1, 2025Lolworth ProjectLWDR012 3.57 g/t Au over 2 m from 14 m
Bailieston project - initial drilling results
BH3DD046 0.84 g/t Au over 0.15 m from 135.2 m
BH3DD045 0.15 g/t Au over 0.3 m from 129.5 m
May 27, 2025Bailieston ProjectBH3DD044 3.86 g/t Au over 0.2 m from 133.5 m
Initial Drilling Results From Tambo Gold ProjectNov 20, 2024Tambo Gold ProjectDOCD002 8.51 g/t Au over 0.40 m from 44.6 m
Further High-Grade Gold Intercepts at Blue Moon Prospect, Bailieston...
BBMDD010 17.77 g/t Au over 0.5 m from 84.9 m
BBMDD011 1.07 g/t Au over 0.45 m from 94.25 m
Feb 24, 2023Blue Moon ProspectBBMDD009 0.16 g/t Au over 0.3 m from 204.6 m
Encouraging Results from First Drill Hole of 2022 at Blue Moon, VictoriaNov 17, 2022Bailieston ProjectBBMDD004 7.29 g/t Au over 0.5 m from 96.9 m
Drill Results from BH3DD035 Show Signs of Grade Continuity at...Jul 11, 2022Bailieston ProjectBH3DD035 16.15 g/t Au over 0.25 m from 163.25 m
Multiple High Grade Gold Intercepts from hole BH3DD034 at HR3...Jun 8, 2022Bailieston ProjectBH3DD034 20.34 g/t Au over 0.3 m from 18.2 m
Drilling Identifies Further High Gold Grades at the Upper-Maori...May 4, 2022Bailieston ProjectBH3DD022 12.74 g/t Au over 0.50 m from 49.5 m
Drilling Continues to Extend Gold Mineralisation within the Maori ReefMar 2, 2022Bailieston ProjectBH3DD019 9.5 g/t Au over 0.5 m from 99.9 m
Initial drilling Results from Cherry Tree, Bailieston Gold Project, Victoria...
BCTDD003 11.02 g/t Au over 0.5 m from 98.85 m
Aug 10, 2021Bailieston ProjectBCTDD002 1.08 g/t Au over 0.5 m from 65.6 m
High-Grade Drilling Results – Bailieston Gold Project, Victoria Goldfields...
BH3DD003 1.19 g/t Au over 0.8 m from 135.8 m
Apr 20, 2021Bailieston Gold ProjectBH3DD001 19.0 g/t Au over 0.5 m from 110.9 m
High Grade Gold Assays from Drilling at Blue Moon Prospect Victoria...
BBM006 3.88 g/t Au over 3 m from 170 m
BBM004 0.28 g/t Au over 16 m from 85 m
Mar 14, 2019Blue Moon ProspectBBM007 3.81 g/t Au over 15 m from 51 m
Drilling Results
AMC001 1.32 g/t Au over 2.10 m from 87.30 m
AMC002 1.89 g/t Au over 1.00 m from 85.40 m
Jun 5, 2018ABB001 2.20 g/t Au over 0.95 m from 32.85 m
Drill Results - Bailieston Gold Project, Australia
MGARC04 0.48 g/t Au over 9 m from 15 m
MGARC05 0.85 g/t Au over 13 m from 10 m
Jul 24, 2017MGARC02 0.93 g/t Au over 1 m from 125 m
Positive Drilling and Trenching Results from Itogon Gold Project, Philippines
EDD002 0.50 g/t Au over 2.7 m from 0.0 m
EDD004 2.12 g/t Au over 4.4 m from 0.0 m
Jun 18, 2015Itogon Gold ProjectEDD001 0.37 g/t Au over 2.0 m from 6.0 m
Positive Drilling Results from Itogon Gold Proj...
ERC002 0.35 g/t Au over 1 m from 5 m
ERC003 0.66 g/t Au over 14 m from 0 m
May 29, 2014Itogon Gold ProjectERC001 0.73 g/t Au over 8 m from 15 m
Exceptional Silver Swan Drilling Results
ATD002 11 % Zn over 10 m from 296 m
Jun 21, 2010Austin deposit10ATD001 2 % Cu over 58 m from 148 m
Preliminary Drilling ResultsApr 20, 2006Prohibition06PRRD001 6.54 g/t Au over 7 m from 27 m
Meekatharra Drilling Results
05JSRC005 0.77 g/t Au over 4 m from 18 m
05JSRC008 1.57 g/t Au over 14 m from 3 m
Jun 22, 2005Annean Joint Venture05JSRC004 0.9 g/t Au over 1 m from 86 m
Initial Drilling Results
04BBRCDD002 4.85 g/t Au over 9 m from 287 m
04BBRCDD003 1.71 g/t Au over 2 m from 177 m
Dec 9, 2004Bluebird04BBRCDD001 0.73 g/t Au over 1 m from 101 m