Vista Gold Corp (LSX:A0MRZD) Drill core

Vista Gold Corp

Drill core

ReleaseDateProjectHeadline hole
Vista Gold Corp. Announces Final Results from Phase 2 Drilling at Mt Todd
VB21-013 1.25 g/t Au over 6.0 m from 130.0 m
Sep 22, 2021Mt Todd Gold ProjectVB21-012 1.29 g/t Au over 10.0 m from 469.0 m
Vista Gold Corp. Announces Drill Results at Mt Todd
VB21-007 1.77 g/t Au over 2.5 m from 42.5 m
VB21-008 0.56 g/t Au over 17.0 m from 265.0 m
Jun 30, 2021VB21-006 1.58 g/t Au over 6.0 m from 53.0 m
Vista Gold Corp. Announces Mineralized Intercept 500 Meters North of Batman Deposit and Provides Comprehensive Exploration Program UpdateMar 24, 2021Mt Todd Gold ProjectVB21-002 1.23 g/t Au over 30.0 m from 224.0 m
Vista Gold Drilling Confirms Adjacent Mineralized Zone at the Mt Todd Gold ProjectDec 14, 2020Mt Todd Gold ProjectVB20-001 0.72 g/t Au over 60 m from 84 m
Vista Gold Corp. Announces Final Mt. Todd 2012 Drilling Program Results and Provides Update on Mt. Todd Development
VB12-020 0.47 g/t Au over 21.0 m from 383.0 m
VB12-021 0.70 g/t Au over 8.0 m from 226.0 m
Feb 11, 2013Mt. Todd gold projectVB12-019 1.21 g/t Au over 6.9 m from 244.9 m
Vista Gold Corp. Reports Additional Mt. Todd Drilling Results, Including 1.49 g/t Gold over 129 meters
VB12-016 1.49 g/t Au over 129.0 m from 563.0 m
VB12-017 0.54 g/t Au over 50.0 m from 185.0 m
Sep 25, 2012Mt. Todd gold projectVB12-015 0.64 g/t Au over 11.3 m from 130.7 m
Vista Gold Corp. Reports Additional Mt. Todd Drilling Results, including 1.03 g/t Gold over 206 meters
VB12-011 0.99 g/t Au over 24.9 m from 169.1 m
VB12-012 0.60 g/t Au over 21.0 m from 336.0 m
Aug 29, 2012Mt. Todd gold projectVB12-010 0.65 g/t Au over 10.2 m from 300.0 m
Vista Gold Corp. Reports 3.52 g/t Gold and 132.0 g/t Silver over 23.7m at its Guadalupe de los Reyes Gold/Silver Project
12GL-03 2.62 g/t Au over 5.6 m from 8.7 m
12GL-04 2.775 g/t Au over 10.1 m from 3.1 m
Aug 9, 2012Guadalupe de los Reyes Gold/Silver Project12GL-02 2.03 g/t Au over 3.0 m from 10.1 m
Vista Gold Corp. Revises the Scope of the Mt. Todd Feasibility Study to Incorporate Increased Plant Throughput as Infill Drill Results Continue to be Positive
VB12-005 0.82 g/t Au over 26.2 m from 455.9 m
VB12-006 1.01 g/t Au over 43.0 m from 162.0 m
Jun 5, 2012Mt. Todd gold projectVB12-004 0.70 g/t Au over 41.0 m from 92.0 m
Vista Gold Corp. Reports Drilling and Initial Metallurgical Test Results for the Historic Heap Leach Pad at Mt. Todd in Australia
DLC-002 0.58 g/t Au over 10.0 m from 0.0 m
DLC-003 0.50 g/t Au over 10.0 m from 0.0 m
May 16, 2012Mt. Todd gold projectDLC-001 0.51 g/t Au over 10.0 m from 0.0 m
Vista Gold Corp. Reports Drilling Results and Provides Update on Ongoing Exploration Activities at Mt. Todd in Australia
VB12-001 1.22 g/t Au over 42.4 m from 579.8 m
VB12-002 1.12 g/t Au over 8.9 m from 89.5 m
Apr 25, 2012Mt. Todd gold projectVB11-015 1.35 g/t Au over 19.0 m from 223.0 m
Vista Gold Corp. Provides Update on Mt. Todd Feasibility Study Status and Reports Results from Ongoing Drilling at the Guadalupe de los Reyes Gold/Silver Project
12GC-01 4.46 g/t Au over 2.2 m from 167.6 m
12GL-01 2.40 g/t Au over 16.5 m from 36.6 m
Mar 30, 2012Guadalupe de los Reyes Gold/Silver Project12GV-03 1.63 g/t Au over 9.0 m from 128.5 m
Vista Gold Corp. Announces Additional Results from Drilling at the Guadalupe de los Reyes Gold-Silver Project (Including Results from one Drill Hole in the Guadalupe Vein with 12.15 g/tonne Gold and 738 g/tonne Silver over 5.3 Meters of Vein Width) and the Award of Contract for the Completion of a P
12GV-02 738 g/t Ag over 5.3 m from 239.9 m
12ZAP-01 0.54 g/t Au over 7.1 m from 0 m
Feb 27, 2012Guadalupe de los Reyes Gold-Silver Project11GV-01 14.9 g/t Au over 2.0 m from 55.0 m
Vista Gold Corp. Announces Initial Results from Guadalupe de los Reyes Drilling Program
11GW-002 0.61 g/t Au over 1.0 m from 70.2 m
11GW-003 2.16 g/t Au over 2.0 m from 77.6 m
Jan 19, 2012Guadalupe de los Reyes Gold-Silver Project11GW-001 2.22 g/t Au over 7.0 m from 53.5 m
Drilling Results at Vista's Mt. Todd Project Identify Long Intervals of Gold Mineralization With Higher Grades
VB08034 0.68 g/t Au over 21 m from 600 m
VB08035 0.63 g/t Au over 111 m from 281 m
Nov 12, 2008Vista's Mt. Todd ProjectVB08032 1.05 g/t Au over 29 m from 191 m
Vista Announces Initial Drill Results for Mt. Todd, Australia, Project and Decision to Develop Advanced Projects
VB07-002 1.00 g/t Au over 53 m from 432 m
VB07-004 1.07 g/t Au over 194 m from 121 m
May 30, 2007Mt. Todd projectVB07-001 1.66 g/t Au over 172 m from 205 m