Andrada Mining Limited (LSE:ATM) Drill core

Andrada Mining Limited

Drill core

ReleaseDateProjectHeadline hole
Lithium Ridge Drill Results
LRD034 0.02 % Li2O over 1.10 m from 3.73 m
LRD035 0.02 % Li2O over 0.20 m from 0.50 m
Aug 26, 2026Lithium Ridge ProjectLRD030 0.02 % Li2O over 0.34 m from 14.96 m
Third Batch of Lithium Ridge Drill Results
LRD024 0.05 % Li2O over 0.44 m from 31.33 m
LRD027 2.28 % Li2O over 9.05 m from 50.82 m
Jun 9, 2026Lithium Ridge ProjectLRD023 1.24 % Li2O over 9.64 m from 50.36 m
Second Batch of Lithium Ridge Drill Results
LRD015 0.01 % Li2O over 0.37 m from 29.77 m
LRD017 0.02 % Li2O over 0.59 m from 19.09 m
May 5, 2026LRD014 0.41 % Li2O over 5.09 m from 8.38 m
High-grade initial drill results at Lithium Ridge
LRD002 0.82 % Li2O over 10.30 m from 29.85 m
LRD003 2.12 % Li2O over 9.63 m from 36.66 m
Feb 9, 2026LRD001 0.01 % Li2O over 0.25 m from 61.79 m
Brandberg West Second Batch Drill Results
AT3 04 0.10 % Sn over 2.25 m from 9.92 m
AT3 06 0.05 % Sn over 2.60 m from 6.40 m
Oct 16, 2024Brandberg West projectAT3 01 0.23 % Sn over 0.32 m from 18.42 m
Initial Drill Results on ML133 (“Lithium Ridge”)
ATNN 02 1.24 % Li2O over 27 m from 31 m
ATNN 03 0.92 % Li2O over 6 m from 10 m
Sep 6, 2023ML133 ("Lithium Ridge")ATNN 01 0.80 % Li2O over 63 m from 17 m
Drill programme results for Spodumene Hill Project
B1 02 0.22 % Li2O over 33.91 m from 17.44 m
B1 03 0.38 % Li2O over 26.47 m from 13.08 m
Jul 6, 2023Spodumene Hill ProjectB1 01 1.38 % Li2O over 14.52 m from 15.48 m
V1V2 final 2022 exploration drilling results
V1V2063 0.164 % Sn over 114.14 m from 151.25 m
Mar 30, 2023V1/V2 pegmatiteV1V2053 0.167 % Sn over 112.77 m from 113.42 m
Li and Ta Infill Drill Programme, Initial Results
V1V2045 0.167 % Sn over 94.7 m from 114.49 m
V1V2049 0.168 % Sn over 131.86 m from 124.19 m
Jun 8, 2022Uis MineV1V2036 1.08 % Li2O over 8.00 m from 140.00 m