First Tin PLC (LSE:1SN) Drill core

First Tin PLC

Drill core

ReleaseDateProjectHeadline hole
Results from Taronga Tin Drilling Programme
TMTARC067 0.18 % Sn over 12 m from 38 m
TMTARC079 0.19 % Sn over 6 m from 19 m
Dec 18, 2025Taronga tin projectTMTARC049 0.19 % Sn over 13 m from 8 m
Final results from Tin Beetle drilling at Taronga
TMGBRC002 0.04 % Sn over 10.0 m from 47.0 m
TMGBRC003 0.10 % Sn over 30.0 m from 0.0 m
Aug 29, 2023Tin Beetle prospectTMGBRC001 0.18 % Sn over 48.0 m from 2.0 m
Completion of Taronga Drilling and Assay Results
TMTARC021 0.20 % Sn over 35.0 m from 63.0 m
TMTARC022 0.12 % Sn over 49.0 m from 60.0 m
Jun 12, 2023Taronga tin projectTMTARC015 0.20 % Sn over 11.0 m from 24.0 m
The assay results at Tellehauser
SAXDRE34 0.63 % Sn over 3.85 m from 887 m
Dec 22, 2022Tellerhauser ProjectSAXDRE25 1.43 % Sn over 0.6 m from 806.0 m