First Tin PLC (LSE:1SN) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Results from Taronga Tin Drilling Programme TMTARC067 0.18 % Sn over 12 m from 38 m TMTARC079 0.19 % Sn over 6 m from 19 m | Dec 18, 2025 | Taronga tin project | TMTARC049 0.19 % Sn over 13 m from 8 m |
| Final results from Tin Beetle drilling at Taronga TMGBRC002 0.04 % Sn over 10.0 m from 47.0 m TMGBRC003 0.10 % Sn over 30.0 m from 0.0 m | Aug 29, 2023 | Tin Beetle prospect | TMGBRC001 0.18 % Sn over 48.0 m from 2.0 m |
| Completion of Taronga Drilling and Assay Results TMTARC021 0.20 % Sn over 35.0 m from 63.0 m TMTARC022 0.12 % Sn over 49.0 m from 60.0 m | Jun 12, 2023 | Taronga tin project | TMTARC015 0.20 % Sn over 11.0 m from 24.0 m |
| The assay results at Tellehauser SAXDRE34 0.63 % Sn over 3.85 m from 887 m | Dec 22, 2022 | Tellerhauser Project | SAXDRE25 1.43 % Sn over 0.6 m from 806.0 m |