Fulcrum Metals PLC (LS:A3D7LX) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| 8% increase in average AuEq grade to 0.7g/t TH-135-4 1.076 g/t AuEq over 4.75 m from 0.00 m TH-185-7 1.012 g/t Au over 5.90 m from 0.00 m | Jan 27, 2026 | Teck Hughes tailings project | TH-110-6 0.849 g/t Au over 7.90 m from 0.00 m |
| Assay values of up to 1.62g/t Au at Teck Hughes TH-185-7 1.01 g/t Au over 5.90 m from 0.00 m TH-335-4 1.62 g/t Au over 0.80 m from 4.00 m | Oct 15, 2025 | Teck Hughes tailings project | TH-135-4 1.02 g/t Au over 4.75 m from 0.00 m |