Vision Lithium, Inc. (LS:A2JG9P) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| VISION LITHIUM REPORTS DRILL RESULTS FROM ITS CADILLAC LITHIUM PROPERTY - INTERSECTS UP TO 3.14% Li2O CAD-22-04A 3.14 % Li2O over 1.00 m from 31.20 m CAD-22-07 1.74 % Li2O over 1.90 m from 46.70 m | Apr 13, 2022 | Cadillac Lithium property | CAD-22-04 1.15 % Li2O over 0.60 m from 31.80 m |
| Vision Lithium Reports Results from Sirmac Drill Program SIR-12-45-Twin 1.22 % Li2O over 6.0 m from 13.7 m SIR-12-49-Twin 1.22 % Li2O over 12.0 m from 30.1 m | Jul 19, 2018 | Sirmac Lithium Property | SIR-12-26-Twin 1.62 % Li2O over 19.8 m from 2.4 m |
| Vision Lithium Drills 22.4m of 1.7% LI2O on Sirmac Lithium Property SIR-18-02 1.70 % Li2O over 22.40 m from 1.60 m | May 30, 2018 | Sirmac Lithium Property | SIR-12-26 Twin 1.62 % Li2O over 19.80 m from 2.40 m |
| Abitex and Continental Nickel Report 2.35% Nickel and 1.06% Copper over 5.45 Metres at the St. Stephen Project SSD11-012 0.45 % Ni over 0.95 m from 29.50 m SSD11-013 1.06 % Cu over 5.45 m from 45.50 m | Jan 25, 2012 | St. Stephen Project | SSD11-011 0.68 % Ni over 58.20 m from 113.80 m |
| ABITEX REPORTS GOLD ASSAYS UP TO 73 G/T AT LAVOIE U-AU PROJECT L-09-51 1.19 g/t Au over 4.00 m from 121.50 m L-09-54 0.96 g/t Au over 3.50 m from 94.50 m | Dec 10, 2010 | Lavoie uranium-gold project | L-09-50 2.09 g/t Au over 9.50 m from 76.50 m |
| Abitex drilling on Lavoie property intersects 15.3 m @ 0.342% U3O8 and up to 1.783% U3O8 over 2.2 meters L-08-42 0.355 % U3O8 over 9.40 m from 68.05 m L-08-34 0.150 % U3O8 over 1.50 m from 43.25 m | Mar 26, 2009 | Lavoie property | L-08-43 0.697 % U3O8 over 0.50 m from 59.50 m |