Avalon Advanced Materials Inc. (HAM:OU5A) Drill core

Avalon Advanced Materials Inc.

Drill core

ReleaseDateProjectHeadline hole
Avalon Advanced Materials Further Intersects 1.54% Li2O over 136.95 meters at Big Whopper Deposit, Separation Rapids JV
SR24-119 2.25 % Li2O over 4.50 m from 167.50 m
SR24-120 1.60 % Li2O over 12.80 m from 66.15 m
Aug 19, 2024Separation Rapids ProjectSR24-118 1.32 % Li2O over 2.00 m from 90.00 m
Avalon Undertakes a Mineral Resource Estimate Update following Positive Drill Results for Separation Rapids JV, ON
SR24-114 1.78 % Li2O over 21.50 m from 143.50 m
SR24-115 1.76 % Li2O over 2.00 m from 75.00 m
Aug 13, 2024Separation Rapids ProjectSR24-113 1.68 % Li2O over 66.20 m from 292.25 m
Avalon Reports Drill Results from 2022-2023 Exploration Program at Separation Rapids
SR-23-82 1.50 % Li2O over 31.70 m from 336.00 m
SR-23-83 1.35 % Li2O over 52.35 m from 269.45 m
Jun 1, 2023Separation Rapids Lithium ProjectSR-22-81 1.69 % Li2O over 46.50 m from 325.00 m
Avalon Reports Assay Results from 2018 Winter Drilling Program at Separation Rapids Lithium Project, Kenora, ON
SR18-76 2.28 % Li2O over 0.85 m from 116.50 m
SR18-77 1.50 % Li2O over 8.50 m from 188.10 m
Apr 3, 2018Separation Rapids Lithium ProjectSR18-75 1.04 % Li2O over 6.48 m from 72.36 m