Zinnwald Lithium PLC (GETTEX:7WW) Drill core

Zinnwald Lithium PLC

Drill core

ReleaseDateProjectHeadline hole
High Grade Underground Drill Results at Abbeytown
ABUG002 8.88 g/t Ag over 3.00 m from 76.00 m
inc. ABUG002 11.48 g/t Ag over 2.00 m from 76.00 m
Jan 30, 2019Abbeytown ProjectABUG001 21.70 g/t Ag over 2.00 m from 75.60 m
Update on Centerra Gold Joint Venture
BB002 0.88 g/t Au over 12.30 m from 114.10 m
inc. BB002 2.07 g/t Au over 1.95 m from 124.45 m
Dec 13, 2018Maurliden MineBB001 1.15 g/t Au over 7.55 m from 108.25 m
Further high grade mineralisation at Abbeytown
ERAB006 28.02 g/t Ag over 3 m from 127 m
ERAB007 92.89 g/t Ag over 4.5 m from 105 m
Oct 24, 2018Abbeytown Zinc-Lead-Silver-Copper ProjectERAB005 90.68 g/t Ag over 4.1 m from 171.4 m