Fortune Bay Corp. (GETTEX:5QN) Drill core

Fortune Bay Corp.

Drill core

ReleaseDateProjectHeadline hole
Fortune Bay Drills 1.20 g/t Gold over 23.2 m and Extends Shallow Mineralized System at Golden Pond, Goldfields
GP26-02 1.20 g/t Au over 23.20 m from 15.00 m
GP26-03 0.96 g/t Au over 1.00 m from 29.00 m
May 12, 2026GP26-01 0.84 g/t Au over 2.00 m from 12.00 m
Fortune Bay Drills 9.9 g/t over 7.0 m within 3.7 g/t over 21.0 m in Large Step-Out from Box Deposit
B26-349 0.55 g/t Au over 4.00 m from 355.00 m
Apr 21, 2026Box MineB26-350 3.70 g/t Au over 21.00 m from 342.00 m
Fortune Bay Drills Multiple Gold Zones at Goldfields including 6.61 g/t over 5.0 m within 2.54 g/t over 17.0 m
B25-347 1.91 g/t Au over 15.0 m from 297 m
B25-348 2.29 g/t Au over 9.3 m from 273.68 m
Mar 3, 2026Goldfields Gold ProjectB25-346 2.54 g/t Au over 17.0 m from 228 m
AERO ENERGY AND FORTUNE BAY CONFIRM SHALLOW HIGH-GRADE URANIUM UP TO 13.80% U3O8 FROM DRILLING AT MURMAC
M24-017 2,571 ppm U over 8.40 m from 84.20 m
M24-018 227 ppm U over 0.40 m from 139.55 m
Oct 8, 2024Murmac Uranium ProjectM24-016A 105 ppm U over 0.15 m from 93.50 m
FORTUNE BAY INTERSECTS 13.22 G/T GOLD OVER 8 METRES IN ADDITIONAL STEP-OUT HOLES AT BOX, GOLDFIELDS PROJECT
B21-339 0.78 g/t Au over 11.0 m from 342.0 m
B21-338 0.62 g/t Au over 3.0 m from 342.0 m
Mar 7, 2022Goldfields ProjectB21-340 13.22 g/t Au over 8.0 m from 426.0 m
Fortune Bay Intersects 8.00 G/t Gold Over 12 Metres in Initial Step-Out Holes At Box, Goldfields Project
B21-335 0.50 g/t Au over 6.0 m from 297.0 m
B21-336 8.00 g/t Au over 12.0 m from 509.0 m
Sep 14, 2021Goldfields ProjectB21-334 0.65 g/t Au over 11.0 m from 246.0 m
Fortune Bay Announces Expansion of the Athona Deposit From Phase 1 Drilling Results, Goldfields Project
A21-219 0.61 g/t Au over 14.0 m from 21.0 m
A21-220 1.00 g/t Au over 7.0 m from 137.0 m
Jun 15, 2021Goldfields ProjectA21-218 0.53 g/t Au over 3.0 m from 61.0 m
Fortune Bay Announces Drill Core Resampling Results for the Goldfields Project
B11-316 1.63 g/t Au over 10.00 m from 230.00 m
B11-318 2.32 g/t Au over 7.42 m from 299.00 m
Nov 25, 2020Goldfields ProjectB05-279 2.26 g/t Au over 24.00 m from 71.70 m