Ormonde Mining PLC (FWB:ORQ1) Drill core

Ormonde Mining PLC

Drill core

ReleaseDateProjectHeadline hole
Peralonso Drilling Results
PERDD002 1.14 g/t Au over 5.8 m from 8.9 m
PERDD004 4.51 g/t Au over 1.0 m from 72.0 m
Mar 11, 2013Peralonso PermitPERDD001 3.39 g/t Au over 10.1 m from 46.9 m
Drilling Results at Peralonso
PERDD005 1.87 g/t Au over 6.0 m from 75.0 m
PERDD006 1.38 g/t Au over 6.0 m from 0.0 m
Jan 23, 2013Peralonso PermitPERDD004 4.51 g/t Au over 1.0 m from 72.0 m
Salamanca Drilling Results
SC-1 4.3 g/t Au over 1.0 m from 4.2 m
SC-2 5.9 g/t Au over 1.0 m from 28.0 m
Feb 28, 2007Salamanca Gold ProjectORMP-1 16.6 g/t Au over 1.0 m from 73.0 m
La Zarza drilling results
ORM-35 2.8 % Cu over 2.0 m from 102.0 m
ORM-38 0.7 % Cu over 5.0 m from 199.0 m
Feb 19, 2007La Zarza Copper-Gold ProjectORM-34 2.2 % Cu over 8.4 m from 323.6 m
Drilling Results and Update
ORM14 2.0 % Cu over 47.2 m from 67.9 m
ORM15 0.6 g/t Au over 37.0 m from 72.0 m
Jan 16, 2006La Zarza Gold-Copper ProjectORM12 4.5 g/t Au over 3.0 m from 295.0 m
Preliminary Drilling Results
TRIVES-001-2 1.6 g/t Au over 1.61 m from 55.50 m
TRIVES-002 2.4 g/t Au over 3.00 m from 137.35 m
Jan 12, 2005Trives Gold ProjectTRIVES-001 6.4 g/t Au over 1.15 m from 33.40 m