Los Andes Copper Ltd. (FWB:L41A) Drill core

Los Andes Copper Ltd.

Drill core

ReleaseDateProjectHeadline hole
Los Andes Copper Announces Additional Copper Intercepts at Vizcachitas Copper Project Chile
CMV-011 0.59 % CuEq over 122.00 m from 804 m
CMV-012B 0.63 % CuEq over 330.70 m from 560 m
May 30, 2022Vizcachitas Copper ProjectCMV-008 0.07 % Cu over 579.90 m from 12.2 m
Los Andes Copper Announces the Largest 1% Copper Equivalent Intercept to Date at Vizcachitas Copper Project, Chile
CMV-003 0.09 % Cu over 655.70 m from 42.3 m
CMV-005 0.07 % Cu over 982.90 m from 13.1 m
May 16, 2022Vizcachitas Copper ProjectCMV-002 0.07 % Cu over 622.55 m from 42.3 m
Los Andes Copper Announces 732m at 0.51% Copper Equivalent Mineralization in Initial Drilling Results at Vizcachitas Copper Project, Chile Detailed Table UpdateFeb 10, 2022Vizcachitas Copper ProjectCMV-001B 0.51 % CuEq over 732 m from 64 m
Los Andes Copper Announces 732m at 0.51% Copper Equivalent Mineralization in Initial Drilling Results at Vizcachitas Copper Project, ChileFeb 10, 2022Vizcachitas Copper ProjectCMV-001B 0.51 % Cu over 732 m from 64 m
Los Andes Announces Final Results of 2017 Drill Program at the Vizcachitas Deposit
V201 7- 1 0 0.57 % Cu over 506.0 m from 486.0 m
inc. within 0.95 % Cu over 30.0 m from 558.0 m
Sep 27, 2017Vizcachitas DepositV201 7-0 9B 0.52 % Cu over 77.6 m from 64.4 m
Los Andes Announces Fourth Results of 2017 Drill Program at the Vizcachitas Deposit
V201 7-06 0.53 % Cu over 66.0 m from 588.0 m
V201 7-07 0.62 % Cu over 102.0 m from 44.0 m
Sep 21, 2017Vizcachitas DepositV201 7-0 6 0.51 % Cu over 440.0 m from 64.0 m
Los Andes Announces Third Results of 2017 Drill Program at the Vizcachitas Deposit
V201 7-04 0.48 % Cu over 18.0 m from 198.0 m
V201 5 -0 8Ex 0.50 % Cu over 26.0 m from 804.0 m
Sep 5, 2017Vizcachitas DepositV201 7-0 4 0.51 % Cu over 90.0 m from 92.0 m
Los Andes Announces the Second Batch of Results for the 2017 Drill Program at the Vizcachitas Deposit
V201 7-02 0.53 % Cu over 22.0 m from 138.0 m
Aug 9, 2017Vizcachitas DepositV201 7-01A 0.55 % Cu over 302.1 m from 71.9 m
Los Andes Announces Initial Results of 2017 Drill Program at the Vizcachitas DepositJun 30, 2017Vizcachitas DepositV201 7-01A 0.55 % Cu over 302.1 m from 71.9 m
Los Andes Announces the Final Assay Results from the 2015-2016 Drill Program at the Vizcachitas Deposit
V2015-01 0.411 % Cu over 407.7 m from 68.7 m
V2015-02 0.351 % Cu over 399.7 m from 60.2 m
Mar 31, 2016Vizcachitas DepositV2015-08 0.631 % Cu over 502.0 m from 130.0 m
Los Andes Announces Results of Drill Hole V2015-05 and Upper Portion of V2015-08 at the Vizcachitas DepositMar 7, 2016Vizcachitas DepositV2015-05 0.425 % Cu over 566.0 m from 72.0 m
Los Andes Announces Results of First Four Drill Holes of 2015-2016 Drill Program at the Vizcachitas Deposit
V2015-02 0.602 % Cu over 52.0 m from 142.0 m
V2015-03 0.743 % Cu over 39.1 m from 44.1 m
Feb 26, 2016Vizcachitas DepositV2015-01 0.601 % Cu over 64.0 m from 322.0 m
Los Andes Copper Ltd. (FWB:L41A) Drill core | 6ix