Hamak Strategy Limited (FWB:J9J) Drill core

Hamak Strategy Limited

Drill core

ReleaseDateProjectHeadline hole
Further High-Grade Drilling Results at Akoko
2026-037 29.53 g/t Au over 4 m from 13 m
2026-038 0.85 g/t Au over 4 m from 6 m
Jul 8, 2026Akoko Project2026-013 0.79 g/t Au over 17 m from 7 m
Further Excellent Drilling Results ReceivedJun 22, 2026Akoko Oxide Gold Project2026-086 1.61 g/t Au over 44 m from 5 m
Drilling Hits 3.42g/t over 23m at Akoko ProjectJun 15, 2026Akoko Project2026-043 3.42 g/t Au over 23 m from 15 m
Further High-Grade Drilling Results from Akoko
2026-051 1.57 g/t Au over 14 m from 16 m
Jun 4, 2026Akoko Gold Project2026-021 2.12 g/t Au over 28 m from 3 m
Drilling Intersects 29.53 g/t over 4m at Akoko
2026-037 29.53 g/t Au over 4 m from 13 m
2026-038 0.85 g/t Au over 4 m from 6 m
May 11, 2026Akoko Gold Project2026-013 0.79 g/t Au over 17 m from 7 m
Wide Gold Intersections from Nimba DrillingOct 8, 2025Nimba gold projectFADD-001 0.97 g/t Au over 29 m from 49 m
Extremely Positive Results from First Drill Hole
NZ22-002 0.38 g/t Au over 1.0 m from 31.0 m
NZ22-003 1.05 g/t Au over 4.0 m from 134.0 m
Dec 12, 2022Ity MineNZ22-001 6.98 g/t Au over 20.0 m from 29.0 m