Endeavour Silver Corp. (FWB:EJD) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Endeavour Silver Intersects 3,431 g/t Silver Equivalent over 1.42 Metres at Guanaceví; Multiple High-Grade Intercepts Highlight Contraria Vein Potential UAP-04 0.46 g/t Au over 6.20 m from 157.35 m UAP-05 0.32 g/t Au over 3.15 m from 224.60 m | Nov 16, 2026 | Guanaceví mine | UAP-03 3,431 g/t AgEq over 3.50 m from 60.45 m |
| Endeavour Silver Intersects High-Grade Silver and Gold Mineralization at its Terronera Operation LL-44 3.84 g/t Au over 2.95 m from 120.10 m LL-48 1.08 g/t Au over 1.55 m from 124.85 m | Jun 18, 2026 | LL-43 2,607 g/t AgEq over 1.30 m from 104.10 m | |
| Endeavour Silver Intersects High-Grade Silver-Lead-Zinc Mineralization at its Kolpa Operation DDH-H1-25-109 33 g/t Ag over 1.7 m from 117.85 m DDH-H1-25-74 95 g/t Ag over 0.6 m from 388.55 m | Sep 25, 2025 | Kolpa Mine | DDH-H1-25-106 107 g/t Ag over 2.2 m from 66.1 m |
| Endeavour Silver Continues to Intersect High Grade Polymetallic Mineralization in the San Patricio Vein System on the Parral Property SPT-34 0.24 g/t Au over 9.10 m from 252.65 m SPT-36 0.45 g/t Au over 1.08 m from 280.50 m | Oct 25, 2023 | Parral Property | SPT-33 0.20 g/t Au over 2.56 m from 338.90 m |
| Endeavour Silver Reports Positive Drill Results for the Parral Project VCS-10 0.77 % Cu over 0.75 m from 219.50 m VCS-12 0.01 g/t Au over 1.20 m from 196.75 m | Dec 16, 2021 | Parral Property | VCS-07 0.01 g/t Au over 2.19 m from 264.25 m |