Visionary Copper and Gold Mines Inc. (FWB:CAX) Drill core

Visionary Copper and Gold Mines Inc.

Drill core

ReleaseDateProjectHeadline hole
Visionary Copper and Gold Mines Reports Wide Intersections of Copper and Gold at Pt. Leamington Deposit with Mineralization in Every Hole at the New Kraken Zone
PL-112 0.45 % Cu over 75.8 m from 248.2 m
PL-114 0.58 g/t Au over 10.0 m from 8.0 m
May 13, 2026Pt. Leamington ProjectPL-111 1.20 g/t Au over 2.8 m from 120.3 m
Visionary Intersects 51.9m of 0.46 g/t Gold, 0.37% Copper and 75.8m of 0.45% Copper at Pt. Leamington, Newfoundland
PL-112 0.46 g/t Au over 51.9 m from 60.1 m
Mar 2, 2026Pt. Leamington ProjectPL-111 1.20 g/t Au over 2.8 m from 120.3 m
Callinex Intersects the Descendent in 125m Step-out at the Pine Bay Project, MB
DSC-112-W1 1.71 % CuEq over 7.00 m from 1578.59 m
PBM-024W1 0.08 % Cu over 4.00 m from 1018.00 m
Jan 22, 2024Pine Bay ProjectDSC-112 0.03 % Cu over 8.00 m from 1513.00 m
Callinex Receives Final Drill Assays and Awaits Maiden Resource Estimate on Rainbow Deposit Located in the Flin Flon Mining District, MB
PBM-180 0.61 % Cu over 24.00 m from 147 m
PBM-181 0.60 % Cu over 6.05 m from 132.95 m
Jan 23, 2023Pine Bay ProjectPBM-179 0.61 % Cu over 6.00 m from 540 m
Callinex Intersects 33.67m of 4.29% Copper and Other High-Grade Intervals at the Rainbow Deposit located in the Flin Flon Mining District, MB
PBM-174 2.12 % Cu over 4.95 m from 545.55 m
PBM-174-W1 2.47 % Cu over 6.00 m from 550.0 m
Sep 19, 2022Rainbow DepositPBM-173-W1 3.51 % Cu over 5.00 m from 627.0 m
Callinex Discovers the Alchemist: New High-Grade Copper, Zinc, Gold and Silver Deposit at the Pine Bay Project, MB
ALC-112 0.31 % Cu over 4.00 m from 585.5 m
ALC-113 0.07 % Cu over 20.00 m from 654.0 m
Sep 7, 2022Pine Bay ProjectALC-111 0.90 % Cu over 2.44 m from 713.56 m
Callinex Intersects 9m of 12.53% Copper and Other High-Grade Intervals at the Rainbow Deposit located in the Flin Flon Mining District, MB
PBM-155 1.05 % Cu over 5.00 m from 312.0 m
PBM-161 2.17 % Cu over 13.30 m from 831.0 m
Mar 1, 2022Pine Bay ProjectPBM-147 0.85 % Cu over 9.00 m from 114.0 m
Callinex Announces Expansion of Rainbow Deposit to Surface and at Depth with Multiple Copper-Gold-Zinc Assays
PBM-134 1.07 % Cu over 6.40 m from 525.0 m
PBM-138-W1 3.04 % Cu over 31.00 m from 656.0 m
Jan 31, 2022Pine Bay ProjectPBM-128-W1 6.28 % Cu over 7.60 m from 589.6 m
Callinex Mines Intersects 37m of 6% Copper in the Rainbow Deposit located in the Flin Flon Mining District, MB
PBM-132 1.38 % Cu over 6.00 m from 652.00 m
PBM-135 2.50 % Cu over 0.50 m from 903.00 m
Sep 7, 2021Pine Bay ProjectPBM-113-W3 1.38 % Cu over 5.00 m from 861.00 m
Callinex Intersects 67m of 2.73% Copper and 20.53m of 2.58% Copper in Step-outs at the Rainbow Deposit in the Flin Flon Mining District, MB
PBM-131 2.58 % Cu over 20.53 m from 709.00 m
Jun 30, 2021Pine Bay ProjectPBM-129-W2 2.73 % Cu over 67.00 m from 776.00 m
Callinex Intersects 4.87m of 14.94% Copper in 90m Step-out from the Rainbow Deposit in the Flin Flon Mining District, MB
PBM-123 0.78 % Cu over 0.50 m from 560.50 m
PBM-124 2.54 % Cu over 0.85 m from 574.27 m
Jun 8, 2021Pine Bay ProjectPBM-122 1.12 % Cu over 2.00 m from 496.25 m
Callinex Intersects 7.55m of 5.01% Copper Eq in 257m Vertical Step-out from the Rainbow Deposit in the Flin Flon Mining District, MB
PBM-118 3.30 % Cu over 7.77 m from 621.83 m
PBM-119 2.02 % Cu over 5.60 m from 609.34 m
Apr 26, 2021Pine Bay ProjectPBM-117 0.14 % Cu over 0.22 m from 919.83 m
Callinex Intersects 5.00m of 10.63% CuEq and 5.40m of 4.43% CuEq 65m Step-out at the Rainbow Discovery in the Flin Flon Mining District, MB
PBM-113-W1 (Orange Zone) 10.63 % CuEq over 5.00 m from 833.70 m
Nov 18, 2020Pine Bay ProjectPBM-113-W1 (Yellow Zone) 4.43 % CuEq over 5.40 m from 770.60 m
Callinex Intersects 5m of 8.35% CuEq and 9m of 3.72% CuEq with 145m Step-out from the Rainbow Discovery in the Flin Flon Mining District, MB
PBM-113 (Yellow Zone) 8.35 % CuEq over 5.00 m from 819.00 m
PBM-113 2.21 % Cu over 4.00 m from 874.00 m
Nov 16, 2020Pine Bay ProjectPBM-112 (Orange Zone) 0.07 % Cu over 2.64 m from 638.00 m
Callinex Mines Discovers Two High Grade Copper, Gold, Silver and Zinc Lenses in the Flin Flon Mining District of ManitobaSep 9, 2020Pine Bay ProjectPBM-111 3.09 % Cu over 2.96 m from 892.04 m
Callinex Mines Discovers 28.6m of 57 g/t Ag Including 16.5m of 94 g/t Ag Near Surface at the Nash Creek Project in Bathurst Mining District, New Brunswick
NC20-321 1.7 g/t Ag over 7.0 m from 109.0 m
SJ20-95 21.0 g/t Ag over 1.0 m from 81.0 m
Jun 15, 2020Nash Creek ProjectNC20-313 57.0 g/t Ag over 28.6 m from 163.0 m
Callinex Mines Announces Results from the 2018 Drilling Campaign
NC18-283 2.53 % Zn over 5.0 m from 42.0 m
NC18-285 1.37 % Zn over 6.0 m from 20.0 m
Dec 13, 2018Nash Creek ProjectNC18-281 10.91 % Zn over 3.0 m from 99.0 m
Callinex Reports Final Drill Results to be Included in Upcoming PEA
NC17-253 3.76 % ZnEq over 4.00 m from 15.00 m
NC17-256 2.57 % ZnEq over 5.00 m from 8.00 m
Apr 4, 2018Nash Creek ProjectNC17-252 4.55 % ZnEq over 4.00 m from 81.00 m
Callinex Intersects 11.8m of 3.9% Zinc Equivalent Mineralization at Nash Creek in New Brunswick
NC17-263 3.93 % ZnEq over 11.8 m from 37.2 m
NC17-271 2.64 % ZnEq over 2.0 m from 175.0 m
Feb 14, 2018Nash Creek ProjectNC17-251 2.16 % ZnEq over 4.1 m from 57.3 m
Callinex Mines Intersects 13.0 Meters of 5.7% Zinc Equivalent Mineralization at Nash Creek in New Brunswick
NC17-259 1.52 % ZnEq over 14.00 m from 47.50 m
NC17-260 5.74 % ZnEq over 13.00 m from 72.00 m
Jan 29, 2018Nash Creek ProjectNC17-254 7.72 % ZnEq over 9.00 m from 49.00 m
Callinex Mines Intersects Extensive Near-Surface Zinc Mineralization at Nash Creek in New Brunswick
NC17-247 1.90 % ZnEq over 7.0 m from 82.0 m
NC17-249 2.78 % ZnEq over 53.8 m from 18.5 m
Jan 22, 2018Nash Creek ProjectNC17-246 3.85 % ZnEq over 12.0 m from 44.1 m
Callinex Mines Intersects 9 Meters of 10% Zinc and Continues to Expand the Near-Surface Nash Creek Deposit
NC17-255 2.81 % ZnEq over 21.0 m from 118.0 m
NC17-257 10.34 % Zn over 9.0 m from 118.0 m
Jan 18, 2018Nash Creek ProjectNC17-248 2.53 % ZnEq over 13.0 m from 82.0 m
Callinex Mines Intersects 7.9m of 2.5% Zn and 0.42 g/t Au in the Flin Flon Mining District
PBM-026 2.4 % Cu over 3.8 m from 399.2 m
Jan 12, 2018Big Island ProjectTZ17-03 2.5 % Zn over 7.9 m from 69.5 m
Callinex Mines Drills 1.9 Metres of Massive Sulphides Grading 8.0% Zinc Equivalent at Superjack Project
SJ17-88 8.04 % ZnEq over 1.9 m from 239.3 m
Nov 16, 2017Superjack ProjectSJ17-87 5.27 % ZnEq over 3.5 m from 627.4 m
Callinex Mines Drills 2.7 Metres of 6.2% Zinc Eqivalent at Superjack Project; Discovers New Zinc ZoneSep 20, 2017Superjack ProjectSJ17-90 6.22 % ZnEq over 2.7 m from 40.4 m
Callinex Mines Drills 18.7 Meters of 5.8% Zinc Equivalent at Nash Creek Zinc Project
NC17-242 2.47 % ZnEq over 4.2 m from 35.2 m
NC17-244 3.00 % ZnEq over 1.3 m from 20.8 m
Sep 12, 2017Nash Creek Zinc ProjectNC17-240 1.46 % ZnEq over 4.6 m from 45.8 m
Callinex Mines Intersects 9.0m of 5.2% Zinc Equivalent at Nash Creek Deposit
NC17-223 4.50 % ZnEq over 1.20 m from 89.10 m
NC17-224 2.48 % ZnEq over 26.37 m from 67.00 m
Jul 13, 2017Nash Creek ProjectNC17-222 1.80 % ZnEq over 1.56 m from 208.44 m
Callinex Reports Initial Drill Results at Pine Bay
284-3-93W02 3.42 % Cu over 0.20 m from 1272.15 m
Jan 19, 2017Pine Bay Project95-02-DPN 1.99 % Cu over 1.74 m from 783.42 m
Callinex Intersects 44.2 Meters of 4.0% Copper Equivalent Mineralization
PBM003 0.0 % Cu over 0.6 m from 488.8 m
PBM004 3.9 % Cu over 44.2 m from 45.5 m
Apr 24, 2015Pine Bay ProjectPBM001 0.0 % Cu over 3.0 m from 39.0 m
Callinex Drill Results Extend Mineralized Zone at Gossan Hill property Manitoba
GOS066 1.95 g/t Au over 1.75 m from 130.75 m
GOS067 12.99 g/t Au over 4.70 m from 104.00 m
May 10, 2013GOS056 3.41 g/t Au over 3.75 m from 448.25 m
Gossan Hill Gold Zone Expanded 3.88 g/t Gold over 4.25 Meters
GOS 34 1.77 g/t Au over 2.90 m from 394.40 m
GOS035 0.96 g/t Au over 0.55 m from 163.15 m
May 16, 2012GOS 33 19.88 g/t Au over 2.45 m from 316.60 m
Step Out Drilling at Gossan Hill Outlines New Gold Mineralization
GOS049 1.46 g/t Au over 2.66 m from 144.34 m
GOS051 3.23 g/t Au over 2.54 m from 77.82 m
Apr 16, 2012Gossan Hill PropertyGOS046 1.46 g/t Au over 4.02 m from 109.40 m
Assays from Gossan Hill Reveal 30.37 g/t Gold over 1.58 Metres
GOS 34 1.77 g/t Au over 2.90 m from 394.40 m
GOS 36 2.21 g/t Au over 3.97 m from 152.81 m
Mar 13, 2012Gossan Hill PropertyGOS 33 30.37 g/t Au over 1.58 m from 317.47 m
Coles Creek Assays Reveal 11.70 Meters of 175 g/t Silver, 0.194 g/t Gold, 2.114% Zinc, 1.521% Lead
COLE 48 175.839 g/t Ag over 11.70 m from 122.30 m
COLE 49 0.059 g/t Au over 253.00 m from 27.00 m
Nov 25, 2011COLE 28 W1 0.135 g/t Au over 152.80 m from 144.20 m
Troitsa Property Drilling Discovers 82.06 Meters 0f 0.326% Copper
TR11-02 0.016 g/t Au over 174.69 m from 50.60 m
TR11-03 0.015 g/t Au over 47.57 m from 41.25 m
Nov 16, 2011Troitsa PropertyTR11-01 0.014 g/t Au over 179.53 m from 50.55 m