| Kalo Gold Confirms Vertically Continuous Gold System at Qiriyaga Complex and Identifies Untested Epithermal Feeder Target at Depth - 16.90 m at 3.25 g/t Au VA25-DH10 0.91 g/t Au over 5.5 m from 0.0 m VA25-DH12 0.66 g/t Au over 34.0 m from 1.5 m | Apr 8, 2026 | Qiriyaga Complex | VA26-DH17 3.25 g/t Au over 16.90 m from 74.1 m |
|---|
| Kalo Gold Drills New Discovery, Intersects Bonanza-Grade 12.80 g/t Au over 22.12 m, including 25.10 g/t Au over 10.05 m at Qiriyaga Complex, Vatu Aurum Project, Fiji | Oct 15, 2025 | Qiriyaga Complex | VA25-DH11 12.80 g/t Au over 22.12 m from 43.48 m |
|---|
| Kalo Gold Identifies Potential for Increased Gold Values Within 300m of Surface Along Vuinubu Ridge Trend, Vatu Aurum Gold Project KVD01 1.34 g/t Au over 14.0 m from 0.0 m KVD02 0.67 g/t Au over 33.0 m from 43.0 m | Feb 15, 2024 | Vatu Aurum Gold Project | FCD30 1.17 g/t Au over 58.0 m from 28.0 m |
|---|
| Kalo Discovers New Epithermal Gold and Copper Mineralization at Vatu Aurum Gold Project, Fiji | Sep 27, 2023 | Vatu Aurum Gold Project | KGD-2023-08 1.23 g/t Au over 4 m from 53 m |
|---|
| Kalo Gold Drills Additional Thick, Near-Surface, High-Grade Gold Mineralization, with 69m at 0.91 G/T Au (Including 4m of 5.11 G/T Au), at Vatu Aurum Gold Project in Fiji KGD-04 5.11 g/t Au over 4.00 m from 34.0 m | Jul 13, 2021 | Vatu Aurum Gold Project | KGD-03 1.01 g/t Au over 24.00 m from 21.00 m |
|---|
| Kalo Gold Announces Drill Results From First Two Holes at Vatu Aurum Gold Project Confirming Multiple Thick, Near-Surface Gold Intersections | Mar 29, 2021 | Vatu Aurum Gold Project | KGD-01 0.94 g/t Au over 101.00 m from 0.00 m |
|---|