Central Asia Metals PLC (FWB:9C3) Studies
Studies
| Study | Date | Project | Study | NPV | IRR |
|---|---|---|---|---|---|
| Results of the Copper Bay DFS | Jan 18, 2017 | Copper Bay tailings project | Feasibility study | $34.1M, after-tax, 8% | 19.1%, after-tax |
| Study | Date | Project | Study | NPV | IRR |
|---|---|---|---|---|---|
| Results of the Copper Bay DFS | Jan 18, 2017 | Copper Bay tailings project | Feasibility study | $34.1M, after-tax, 8% | 19.1%, after-tax |