Core Silver Corp. (FWB:8ZR) Drill core

Core Silver Corp.

Drill core

ReleaseDateProjectHeadline hole
Core Silver Intersects High-Grade Copper-Molybdenum Veins up to 7.31% Cu & 1.01% Mo Confirming Large Porphyry System at Laverdiere
LAV25-010 0.11 % Cu over 10.50 m from 444.75 m
LAV25-011 1.6 g/t Ag over 2.00 m from 12.50 m
Mar 16, 2026Blue PropertyLAV25-007 107.8 g/t Ag over 2.00 m from 156.00 m
Core Assets Drills Longest Massive Sulphide Intercept to Date 11.78m of 10.6% Zinc, 0.36% Copper & 16g/t Silver from Surface
SLM24-061 10.6 % Zn over 11.78 m from 0.00 m
SLM24-062 1.0 % Zn over 3.58 m from 0.00 m
Nov 19, 2024Silver Lime ProjectSLM24-060 2.5 % Zn over 39.90 m from 0.00 m
Core Assets Extends Pete's-Sulphide City-Gally Mineralized Trend to 2.5km With Massive Sulphide at Surface Grading Up To 680g/t Ag, >36.4% Pb+Zn & 0.55% CuApr 4, 2024Silver Lime CRD-Porphyry ProjectSLM23-028 159 g/t Ag over 6.40 m from 27.43 m
Core Assets Drills 4.55 Metres of 116g/t Ag, 11.7% Pb+Zn, and 0.41% Cu at the Jackie Target & Exhibits Drilling Core at AME Round Up Conference in Vancouver
SLM23-038 187 g/t Ag over 2.20 m from 17.05 m
SLM23-039 61 g/t Ag over 2.55 m from 8.00 m
Jan 24, 2024Silver Lime CRD-Porphyry ProjectSLM23-042 116 g/t Ag over 4.55 m from 0 m
Core Assets Drills 1,030g/t Ag, 32.4% Pb+Zn, and 1.16% Cu within 8m of 139g/t Ag and 3.5% Pb+Zn at Gally
SLM23-046 75 g/t Ag over 10.00 m from 3.00 m
SLM23-049 111 g/t Ag over 4.50 m from 3.40 m
Oct 17, 2023Silver Lime CRD-Porphyry ProjectSLM23-048 139 g/t Ag over 8.00 m from 0 m
High-Grade Ag-Pb-Zn at Core Assets Silver Lime 6.4 Metres of 159g/t Ag (5.1 oz/t), 16.4% Pb + Zn & 0.23% Cu - Part of a 2.4km Trend
SLM23-016 Weighted 138 g/t Ag over 3.33 m from 0.00 m
SLM23-017 218 g/t Ag over 0.45 m from 0.05 m
Aug 22, 2023Silver Lime CRD-Porphyry ProjectSLM23-016 193 g/t Ag over 1.25 m from 0.00 m
Core Assets Samples 4.3% Cu, 31g/t Ag, 0.63% Mo, and 0.13 g/t Au at Surface & Summarizes 2022 Exploration Work at the Laverdiere Skarn-Porphyry Project
LAV22-002 0.03 g/t Au over 399.32 m from 2.98 m
LAV22-003 0.03 g/t Au over 30.49 m from 4.51 m
May 16, 2023Laverdiere Skarn-Porphyry ProjectLAV22-001 0.04 g/t Au over 267.05 m from 0.95 m
Core Assets Reports Assay Results From the First Four Drill Holes Completed at the Silver Lime Project, Including 1.25m of 215g/t Ag, 18.8% Zn+Pb, 0.36% Cu & 5.37m of 51g/t Ag, 5.1% Zn+Pb, and 0.19% Cu
SLM22-002 51 g/t Ag over 5.37 m from 1.10 m
SLM22-003 62 g/t Ag over 0.93 m from 154.78 m
Mar 6, 2023Silver Lime ProjectSLM22-001 23 g/t Ag over 21.65 m from 0 m