Studies
| Study | Date | Project | Study | NPV | IRR |
|---|
| Aston Bay Announces Pre-Feasibility Study Results and Maiden Mineral Reserve for the Storm Copper Project, Nunavut | Nov 10, 2026 | Storm Copper Project | Pre-feasibility study | C$165.1M, after-tax, 7% | 32.8%, after-tax |
|---|
| Aston Bay Files Technical Report for Storm Copper Project Initial Mineral Resource Estimate | Apr 17, 2025 | Storm Copper Project | Technical report | | |
|---|
| Aston Bay Announces Initial Mineral Resource Estimate for Near-Surface Mineralization at the Storm Copper Project, Nunavut, Canada | Mar 3, 2025 | Storm Copper Project | Technical report | | |
|---|
| Aston Bay Holdings Ltd. Files Initial Mineral Resource Estimate Technical Report for the Seal Zinc Deposit on SEDAR | Jan 17, 2018 | Seal Zinc deposit | Technical report | | |
|---|
| Aston Bay Holdings Ltd. Announces Initial Mineral Resource Estimate for the Seal Zinc Deposit, Aston Bay Property, Somerset Island, Nunavut | Dec 6, 2017 | Aston Bay Property | Technical report | | |
|---|