Batero Gold Corp. (FWB:68B) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Batero Gold Drills 106.9 Metres Grading 1.47 g/t Au at Batero-Quinchia Deposit DDH-ZO-002 0.81 g/t Au over 40.1 m from 1.90 m DDH-ZO-003 1.00 g/t Au over 29.8 m from 2.20 m | Aug 18, 2017 | Batero-Quinchia Deposit | DDH-ZO-001 0.48 g/t Au over 11.2 m from 0.80 m |
| Batero Extends Continuity of Higher Grade Core of Oxidized Gold Mineralization Oxide Zone 1.19 g/t Au over 22.30 m from 3.70 m Transition Zone 0.33 g/t Au over 23.60 m from 21.40 m | Mar 8, 2016 | La Cumbre deposit | DDH-ZO-001 0.34 g/t Au over 72.40 m from 0.80 m |