Eastport Critical Metals Corp. (FWB:5NM) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Eastport Critical Metals Reports 110.8m at 0.43% Cu at Nak-Main and Launches 291 km2 Gravity Survey at 30km Thole-Copper Snake Copper in Soil Anomaly NAKDD26-012 0.52 % Cu over 16.0 m from 63.3 m NAKDD25-001 0.27 % Cu over 41.0 m from 60.9 m | Sep 28, 2026 | Matsitama Copper Project | NAKDD25-006 0.43 % Cu over 110.8 m from 123.6 m |
| Eastport Intersects 47.5m at 0.64% TREO From 20m Including 7.5m at 2.52% TREO Within 330m at 0.21% TREO at Semarule | Sep 14, 2026 | Semarule Project | SEM005 0.211 % TREO over 330 m from 20.0 m |
| Eastport Critical Metals Intersects 47.5m at 0.64% TREO From 20m Including 7.5m at 2.52% TREO Within 330m at 0.21% TREO at Semarule | Sep 14, 2026 | Semarule Project | SEM005 0.211 % TREO over 330 m from 20.0 m |
| Eastport Critical Metals Intersects over 120m of Copper Mineralisation in Step-Out Diamond Drilling at NAK-East, Extending the NAK Strike Length by 5km NEDD25-002 1,185 ppm Cu over 97.4 m from 64.9 m NEDD26-003 1,118 ppm Cu over 122.4 m from 85.0 m | Aug 4, 2026 | Matsitama Project | NEDD25-001 1,350 ppm Cu over 18.1 m from 109.0 m |
| Eastport Critical Metals Confirms Extensive Copper Mineralisation at Flagship Matsitama Copper Project with Multiple Intercepts Exceeding 100 Metres NAKDD25-004 2,394 ppm Cu over 100.6 m from 142.7 m NAKDD25-007 3,002 ppm Cu over 109.6 m from 16.0 m | Jul 20, 2026 | Matsitama Copper Project | NAKDD25-003 2,346 ppm Cu over 137.1 m from 80.3 m |