| Filing | Date | Type | Filed with |
|---|
| Change in substantial holding | Nov 11, 2026 | Ownership change notice | ASX |
|---|
| Presentation - HPA First Project - Stage 2 Update | Nov 4, 2026 | Other filings | ASX |
|---|
| Commencement of Debt Drawdown | Nov 1, 2026 | Financing | ASX |
|---|
| Amended Quarterly Activities/Appendix 4C Cash Flow Report | Oct 30, 2026 | Quarterly report | ASX |
|---|
| Quarterly Activities/Appendix 4C Cash Flow Report | Oct 30, 2026 | Quarterly report | ASX |
|---|
| Quarterly Activities/Appendix 4C Cash Flow Report | Oct 30, 2026 | Quarterly report | ASX |
|---|
| Ceasing to be a substantial holder for A4N | Oct 27, 2026 | Ownership change notice | ASX |
|---|
| Notice of Annual General Meeting | Oct 23, 2026 | Meeting notice | ASX |
|---|
| Product Marketing Update | Oct 22, 2026 | Operations update | ASX |
|---|
| Change in substantial holding | Oct 9, 2026 | Ownership change notice | ASX |
|---|
| Cleansing Notice | Sep 24, 2026 | Financing | ASX |
|---|
| Application for quotation of securities - A4N | Sep 24, 2026 | Financing | ASX |
|---|
| Proposed issue of securities - A4N | Sep 23, 2026 | Financing | ASX |
|---|
| Product Marketing Update | Sep 22, 2026 | Operations update | ASX |
|---|
| Change in substantial holding for A4N | Sep 21, 2026 | Ownership change notice | ASX |
|---|
| 2026 Sustainability Performance Report | Sep 14, 2026 | Other filings | ASX |
|---|
| Ceasing to be a substantial holder | Sep 3, 2026 | Ownership change notice | ASX |
|---|
| Securities Trading Policy | Aug 30, 2026 | Other filings | ASX |
|---|
| Corporate Governance Statement and Appendix 4G | Aug 30, 2026 | Other filings | ASX |
|---|
| Annual Report and Appendix 4E | Aug 30, 2026 | Annual report | ASX |
|---|
| Product Marketing Update | Aug 17, 2026 | Operations update | ASX |
|---|
| Change in substantial holding for A4N | Aug 5, 2026 | Ownership change notice | ASX |
|---|
| Half Yearly Report and Accounts | Feb 26, 2026 | Interim report | ASX |
|---|
| Successful A$225M Capital Raising Supports Stage 2 Project | Jan 29, 2026 | Financing | ASX |
|---|
| Quarterly Activities/Appendix 4C Cash Flow Report | Jan 28, 2026 | Quarterly report | ASX |
|---|
| Capital Raising Presentation | Jan 28, 2026 | Financing | ASX |
|---|
| Capital Raising to Unlock Scale in Semiconductor Sector | Jan 28, 2026 | Financing | ASX |
|---|
| Trading Halt | Jan 28, 2026 | Trading halt or suspension | ASX |
|---|
| Stage 2 - Government Funding Update | Oct 30, 2025 | Other filings | ASX |
|---|
| Annual Report and Appendix 4E | Aug 28, 2025 | Annual report | ASX |
|---|
| Semiconductor Sector Product Marketing Update | Mar 2, 2025 | Operations update | ASX |
|---|
| Response to ASX Aware Letter | Feb 9, 2025 | Explanation request | ASX |
|---|
| Leadership Changes - Update | Feb 2, 2025 | Management or board change | ASX |
|---|
| Leadership Changes | Feb 2, 2025 | Management or board change | ASX |
|---|
| Significant Acceleration in Semiconductor Sector Demand | Jan 13, 2025 | Operations update | ASX |
|---|
| Contractual Close Reached for Senior Debt Funding | Dec 16, 2024 | Financing | ASX |
|---|
| Alpha Sapphire Update | Dec 11, 2024 | Other filings | ASX |
|---|
| Projects Update | Dec 3, 2024 | Operations update | ASX |
|---|
| HPA First Project - Stage 2 Construction Commenced | Aug 20, 2024 | Other filings | ASX |
|---|
| Successful $175M Equity Raising to take FID | May 21, 2024 | Other filings | ASX |
|---|
| Presentation to Investors | May 19, 2024 | Other filings | ASX |
|---|
| Stage 2 - Compelling DFS Underpins FID and Equity Raising | May 19, 2024 | Financing | ASX |
|---|
| Maiden Sapphire Growth | May 13, 2024 | Operations update | ASX |
|---|
| Product Marketing and Products Pricing Update | May 7, 2024 | Operations update | ASX |
|---|
| $400M Australian Government Support for Stage 2 Development | Apr 17, 2024 | Financing | ASX |
|---|
| Pause in Trading | Apr 16, 2024 | Trading halt or suspension | ASX |
|---|
| $40M Strategic Placement to Accelerate Alpha Sapphire | Nov 1, 2023 | Financing | ASX |
|---|
| $30M QCMBTF Facility Agreements Complete | Oct 31, 2023 | Other filings | ASX |
|---|
| Project Marketing Update | Oct 17, 2023 | Operations update | ASX |
|---|
| Stage 1 HPA Line nears completion | Oct 11, 2023 | Other filings | ASX |
|---|
| HPA First Project Finance Update | Oct 3, 2023 | Other filings | ASX |
|---|
| $30M for Alpha Sapphire from QIC Critical Minerals Fund | Sep 28, 2023 | Other filings | ASX |
|---|
| S&P DJI Announces September 2023 Quarterly Rebalance | Sep 1, 2023 | Other filings | ASX |
|---|
| Expansion of IP Licencing Rights | Jul 25, 2023 | Other filings | ASX |
|---|
| Receipt of Initial Payment of Federal Government Grant Funds | Jun 7, 2023 | Other filings | ASX |
|---|
| Expansion of Synthetic Sapphire Glass Agreements with Ebner | Jun 4, 2023 | Other filings | ASX |
|---|
| HPA First Project Update | Apr 18, 2023 | Operations update | ASX |
|---|
| Tranche 2 Funds from Critical Minerals Grant | Apr 17, 2023 | Other filings | ASX |
|---|
| $21.7M Queensland Government Grant - Additional Information | Apr 5, 2023 | Other filings | ASX |
|---|
| Alpha Awarded Queensland Government Grant | Apr 4, 2023 | Other filings | ASX |
|---|
| Agreements for Sapphire Glass Production with Ebner Group | Mar 22, 2023 | Other filings | ASX |
|---|
| HPA First Project - First Production | Nov 28, 2022 | Other filings | ASX |
|---|
| Orica strategic partnership expanded with placement and MoU | Nov 13, 2022 | Financing | ASX |
|---|
| Federal Government Grants Update | Sep 21, 2022 | Other filings | ASX |
|---|
| Alpha Awarded up to $15.5M Federal Government Grant | Apr 27, 2022 | Other filings | ASX |
|---|
| Company and Project Update | Apr 25, 2022 | Operations update | ASX |
|---|
| Alpha Awarded $45M Federal Government Grant | Mar 15, 2022 | Other filings | ASX |
|---|
| Impact of Brisbane Floods | Mar 1, 2022 | Other filings | ASX |
|---|
| Quarterly Cashflow Report | Jan 24, 2022 | Quarterly report | ASX |
|---|
| Quarterly Activities Report | Jan 24, 2022 | Quarterly report | ASX |
|---|
| HPA First Project - Product Marketing Update | Dec 14, 2021 | Other filings | ASX |
|---|
| Project Approval, Land Settlement and PPF Site Works | Nov 4, 2021 | Other filings | ASX |
|---|
| NAIF - Strategic Assessment Phase Approval | Sep 27, 2021 | Other filings | ASX |
|---|
| Collerina Project Divestment | Sep 1, 2021 | Acquisition or disposal | ASX |
|---|
| HLX: Strategic Tenement Acquisition | Sep 1, 2021 | Acquisition or disposal | ASX |
|---|
| Orica and Alpha Execute Definitive Agreements | Aug 17, 2021 | Other filings | ASX |
|---|
| HPA First Project and Product Marketing Update | Jul 5, 2021 | Other filings | ASX |
|---|
| Presentation to Benchmark Minerals EV Fest | Jun 4, 2021 | Other filings | ASX |
|---|
| Successful Completion of $50M Placement | Jun 2, 2021 | Financing | ASX |
|---|
| Accelerating Production with Precursor Production Facility | Jun 1, 2021 | Other filings | ASX |
|---|
| Marketing and Product Development Update | May 27, 2021 | Other filings | ASX |
|---|
| Carbon Footprint Modelling Highlights Green Credentials | May 21, 2021 | Other filings | ASX |
|---|
| MoU for EU Specialty Markets | May 2, 2021 | Other filings | ASX |
|---|
| MoU with CleanCo QLD to provide up to 100% renewable energy | Apr 29, 2021 | Other filings | ASX |
|---|
| MoU for Japan and China Specialty Markets | Apr 28, 2021 | Other filings | ASX |
|---|
| MoU with global materials company Saint Gobain | Apr 12, 2021 | Other filings | ASX |
|---|
| S&P DJI Announces March 2021 Quarterly Rebalance | Mar 12, 2021 | Other filings | ASX |
|---|
| Product Marketing and Project Update | Mar 1, 2021 | Operations update | ASX |
|---|
| HPA First Project Receives QLD Govt MCU Approval | Feb 1, 2021 | Other filings | ASX |
|---|
| Product Marketing and Product Development Update | Dec 13, 2020 | Other filings | ASX |
|---|
| MOU to market products to specialty North American markets | Nov 24, 2020 | Other filings | ASX |
|---|
| Maiden Sale of 5N Pre-Cursor Product | Nov 10, 2020 | Other filings | ASX |
|---|
| Company and HPA First Project Update | Oct 27, 2020 | Operations update | ASX |
|---|
| Conditional Divestment of Wonogiri Copper Gold Project | Oct 26, 2020 | Acquisition or disposal | ASX |
|---|
| High-purity Li-ion cathode pre-cursor | Oct 7, 2020 | Other filings | ASX |
|---|
| 5N purity, alumina coating pre-cursor for Li-ion electrodes | Sep 27, 2020 | Other filings | ASX |
|---|
| HPA First Project and Company Update | Sep 8, 2020 | Other filings | ASX |
|---|
| Offtake, Marketing and Financing MOU with Traxys | Aug 19, 2020 | Other filings | ASX |
|---|
| Proposed issue of Securities - A4N | May 26, 2020 | Financing | ASX |
|---|
| Successful Placement Raises $7M to Advance HPA First Project | May 26, 2020 | Financing | ASX |
|---|
| Company Activities Update | Mar 24, 2020 | Other filings | ASX |
|---|
| HPA First Project Definitive Feasibility Study | Mar 16, 2020 | Other filings | ASX |
|---|
| MoU Signed with Chemical Counterparty for HPA First Project | Feb 9, 2020 | Other filings | ASX |
|---|
| Response to ASX Price Query | Jan 24, 2020 | Explanation request | ASX |
|---|
| Successful AMGC Grant Application | Sep 4, 2019 | Other filings | ASX |
|---|
| HPA Pilot Plant Update | Aug 28, 2019 | Other filings | ASX |
|---|
| Successful Sale of Rajawali Interest in Alpha HPA | Aug 21, 2019 | Other filings | ASX |
|---|
| Successful Placement raises $3.5 million | Jul 30, 2019 | Financing | ASX |
|---|
| Additional Information | Jul 2, 2019 | Other filings | ASX |
|---|
| HPA First Process Confirmed and Commencement of Pilot Plant | Jul 1, 2019 | Other filings | ASX |
|---|
| Response to ASX Appendix 5B Query | May 3, 2019 | Explanation request | ASX |
|---|
| HPA First PFS Upgrade and Project Update | Mar 7, 2019 | Operations update | ASX |
|---|
| Continued Process Improvement on 2nd SX Mini-Rig Run | Dec 3, 2018 | Other filings | ASX |
|---|
| HPA First Pre-Feasibility Study Presentation | Nov 19, 2018 | Other filings | ASX |
|---|
| HPA First Project - Pre-Feasibility Study (PFS) | Nov 19, 2018 | Other filings | ASX |
|---|
| Homeville Resource Update | Sep 28, 2018 | Operations update | ASX |
|---|
| Assays confirm 4N (99.99%) HPA | Sep 6, 2018 | Operations update | ASX |
|---|
| HPA Project Update | Aug 30, 2018 | Operations update | ASX |
|---|
| Successful HPA Production using the HPA First Process | Aug 5, 2018 | Other filings | ASX |
|---|
| Conditional Change of Managing Director | Jul 11, 2018 | Other filings | ASX |
|---|
| Underwritten Non-Renounceable Rights Issue | Jul 10, 2018 | Financing | ASX |
|---|
| Fast Track to HPA Production | Jul 9, 2018 | Other filings | ASX |
|---|
| Exploration Drilling Confirms High Grade Cobalt Discovery | Jun 19, 2018 | Operations update | ASX |
|---|
| Becker Gold Project Update | May 24, 2018 | Operations update | ASX |
|---|
| Exploration Drilling Update | May 20, 2018 | Operations update | ASX |
|---|
| Acquisition of Becker Gold Project | May 17, 2018 | Acquisition or disposal | ASX |
|---|
| Outstanding Aluminium Solvent Extraction Test Results | Apr 26, 2018 | Other filings | ASX |
|---|
| Exploration Drilling Program | Apr 18, 2018 | Operations update | ASX |
|---|
| Prefeasibility Study Testwork Update | Mar 21, 2018 | Other filings | ASX |
|---|
| CCAL Testwork returns excellent Ni, Co, Al recoveries | Feb 21, 2018 | Other filings | ASX |
|---|
| Metallurgical Program to Develop Collerina PFS Commences | Dec 7, 2017 | Other filings | ASX |
|---|
| Successful Recovery of Scandium | Nov 30, 2017 | Other filings | ASX |
|---|
| Successful Solvent Extraction of Ni, Co and Mn | Nov 29, 2017 | Other filings | ASX |
|---|
| 4N (99.99%) Purity Achieved in HPA Test Work Program | Nov 23, 2017 | Other filings | ASX |
|---|
| Successful Production of High Purity Alumina Sample | Nov 12, 2017 | Other filings | ASX |
|---|
| Successful Share Placement | Nov 5, 2017 | Financing | ASX |
|---|
| Outstanding Aluminium Solvent Extraction Test Work Results | Oct 23, 2017 | Other filings | ASX |
|---|
| CCAL Testwork returns excellent recoveries for Ni, Co and Al | Oct 4, 2017 | Other filings | ASX |
|---|
| Commencement of High Purity Alumina Testwork | Sep 20, 2017 | Other filings | ASX |
|---|
| Geophysics identifies large alteration zone at Becker | Aug 14, 2017 | Other filings | ASX |
|---|
| Commencement of CCAL Testwork | Aug 11, 2017 | Other filings | ASX |
|---|
| High Grade Cobalt Mineralisation intersected at Collerina | Aug 1, 2017 | Other filings | ASX |
|---|
| Commencement of Collerina Project Drilling | May 29, 2017 | Operations update | ASX |
|---|
| Cobalt Evaluation Drill Program to Commence at Collerina | Apr 26, 2017 | Other filings | ASX |
|---|
| Becker Project Joint Venture Advances in Chile | Apr 24, 2017 | Other filings | ASX |
|---|
| Placement to raise $1.2M for Collerina Nickel Cobalt Project | Mar 15, 2017 | Financing | ASX |
|---|
| Response to Appendix 5B Query | Feb 6, 2017 | Quarterly report | ASX |
|---|
| Exploration of Gold-Silver Prospects in Chile and Argentina | Jan 24, 2017 | Other filings | ASX |
|---|
| Updated Internal Scoping Study Delivers Positive Results | Aug 30, 2016 | Other filings | ASX |
|---|
| Review of R&D Tax Incentive Claims | Aug 25, 2016 | Other filings | ASX |
|---|
| R&D Tax Incentive Refund | Jun 2, 2016 | Other filings | ASX |
|---|
| MFC Establishes Dedicated Nickel Development Vehicle | Mar 30, 2016 | Other filings | ASX |
|---|
| 1.54 Moz Gold Equivalent Wonogiri Project Maiden Resource | Mar 30, 2016 | Other filings | ASX |
|---|
| Admission to Official List | Mar 30, 2016 | Other filings | ASX |
|---|
| High Grade Copper at Lipi, Central Jampang Project | Mar 30, 2016 | Other filings | ASX |
|---|
| Progress Gold Results from Jampang | Mar 30, 2016 | Other filings | ASX |
|---|
| Significant Copper Results at Jampang | Mar 30, 2016 | Other filings | ASX |
|---|
| Further Nickel Mineralisation at Homeville | Mar 30, 2016 | Other filings | ASX |
|---|
| Correction to significant drill result Wonogiri hole WDD010 | Mar 30, 2016 | Other filings | ASX |
|---|
| Significant drill result from Wonogiri hole WDD010 | Mar 30, 2016 | Other filings | ASX |
|---|
| 215 Metre Porphyry Gold-Copper Intersection at Wonogiri | Mar 30, 2016 | Other filings | ASX |
|---|
| Proposed Debt for Equity Swap | Mar 30, 2016 | Other filings | ASX |
|---|
| Memorandum of understanding to acquire 80% Wonogiri Project | Mar 30, 2016 | Acquisition or disposal | ASX |
|---|
| Excellent Metallurgical Results from Wonogiri | Mar 30, 2016 | Other filings | ASX |
|---|
| Jampang Maiden Resource Estimate and Update | Mar 30, 2016 | Operations update | ASX |
|---|
| Wonogiri Drilling Update - 95.5 Metre Intersection | Mar 30, 2016 | Operations update | ASX |
|---|
| Leaching testwork returns excellent recoveries at Homeville | Feb 11, 2016 | Other filings | ASX |
|---|
| Magnetic Surveys Identify Drill Targets on Toluludu Prospect | Feb 10, 2016 | Other filings | ASX |
|---|
| Regional Drilling Program at Wonogiri Completed | Feb 10, 2016 | Operations update | ASX |
|---|
| Excellent gravity gold recovery from Wonogiri | Feb 10, 2016 | Other filings | ASX |
|---|
| Appointment of Managing Director | Feb 10, 2016 | Management or board change | ASX |
|---|
| Wonogiri drilling intersects high grade mineralisation | Feb 10, 2016 | Operations update | ASX |
|---|
| Acquisition of 80% of MMGs Indonesian Copper Gold Portfolio | Feb 10, 2016 | Acquisition or disposal | ASX |
|---|
| Randu Kuning High Grade Zone Extended | Feb 10, 2016 | Other filings | ASX |
|---|
| $3.8 Million Subscriptions | Feb 10, 2016 | Other filings | ASX |
|---|
| Commencement of 3,000 Metre Drilling Program at Wonogiri | Feb 10, 2016 | Operations update | ASX |
|---|
| Positive Scoping Study Results for Randu Kuning Deposit | Feb 10, 2016 | Other filings | ASX |
|---|
| ASX Price Query & Response | Feb 10, 2016 | Explanation request | ASX |
|---|
| Potential $6.75M Placement & Sale of Wonogiri Part Interest | Feb 10, 2016 | Financing | ASX |
|---|
| Appendix 5B - Query and Response | Feb 10, 2016 | Quarterly report | ASX |
|---|
| New Copper Gold Intercept at Yeoval Resource NSW | Feb 10, 2016 | Other filings | ASX |
|---|
| Augur Earns 80% of Wonogiri Project | Feb 10, 2016 | Other filings | ASX |
|---|
| Direct Ownership of Wonogiri Licence | Feb 10, 2016 | Other filings | ASX |
|---|
| Augur Resources Share Purchase Plan | Feb 10, 2016 | Financing | ASX |
|---|
| Yeoval Farmin Progress | Feb 10, 2016 | Other filings | ASX |
|---|
| Response to ASX Query - Appendix 5B | Feb 10, 2016 | Explanation request | ASX |
|---|
| Wonogiri Update - 104.1 Metres @ 1.53 g/t AuEq | Feb 10, 2016 | Other filings | ASX |
|---|
| Wonogiri Update - Longest Mineralised Intersection to Date | Feb 10, 2016 | Other filings | ASX |
|---|
| 118.0 Metres @ 0.98 AuEq Drill Intercept at Wonogiri | Feb 10, 2016 | Other filings | ASX |
|---|
| New Zone of Gold Mineralisation at Wonogiri | Feb 10, 2016 | Other filings | ASX |
|---|
| Yeoval Copper-Gold Project Farm-in Update | Feb 10, 2016 | Other filings | ASX |
|---|
| Gold Mineralised Corridor Extended to Over 1300 Metres | Feb 10, 2016 | Other filings | ASX |
|---|
| 132.0 metres at 0.75 g/t Gold and 0.17% Copper at Wonogiri | Feb 10, 2016 | Other filings | ASX |
|---|
| Augur Moves to 51% of Wonogiri Gold-Copper Project | Feb 10, 2016 | Other filings | ASX |
|---|
| Japmang Project Drilling Update | Feb 10, 2016 | Operations update | ASX |
|---|
| Extensive mineralisation in holes 17 and 18 at Wonogiri | Feb 10, 2016 | Other filings | ASX |
|---|
| 123 metre gold and copper intersection at Wonogiri | Feb 10, 2016 | Other filings | ASX |
|---|
| 120 Metre Au and Cu Intersection Further Extends Wonogiri | Feb 10, 2016 | Other filings | ASX |
|---|
| 199 Metre Gold and Copper Zone at Wonogiri | Feb 10, 2016 | Other filings | ASX |
|---|
| Final Results for Wonogiri Hole WDD010 | Feb 10, 2016 | Other filings | ASX |
|---|
This page holds 200 of 245 filings.