ReleaseDateProjectHeadline hole
Kutcho Copper Further Expands Mineralization Down Dip at Main with 4.9m of 2.89% CuEq*
KC18-263 1.01 % Cu over 4.70 m from 198.30 m
KC18-265 1.07 % Cu over 6.16 m from 216.70 m
Nov 20, 2018KC18-261 1.29 % Cu over 9.95 m from 126.00 m
Kutcho Copper Extends Mineralization down dip at Main Deposit with 5.4m of 4.0% CuEq*
KC18-279 1.28 % Cu over 11.27 m from 131.15 m
KC18-280 1.91 % Cu over 5.58 m from 59.42 m
Nov 6, 2018Main DepositKC18-278 1.68 % Cu over 13.16 m from 236.07 m
Kutcho Copper Drills 34.2m of 3.3% CuEq* (including 8.4m of 5.1% CuEq*); Metallurgical Test Work Underway
KC18-243 2.17 % Cu over 12.67 m from 158.19 m
KC18-245 3.3 % CuEq over 34.28 m from 117.72 m
Oct 18, 2018KC18-235 2.58 % Cu over 15.61 m from 68.45 m
Kutcho Copper Drills 11.5m of 1.9% CuEq* (including 1.5m of 6.6% CuEq*) at Esso Below Existing Resource Model; Drills 21.9m of 3.3% CuEq* and 10.4m of 5.3% CuEq* at Main Deposit
KC18-234 1.00 % Cu over 3.52 m from 33.20 m
KC18-237 1.19 % Cu over 4.60 m from 65.82 m
Oct 2, 2018Main DepositKC18-225-W1 1.9 % CuEq over 11.53 m from 540.30 m
Kutcho Copper Drills 28m of 5.7% CuEq* (including 10.4m of 12% CuEq*); Provides Project Update
KC18-227-W1 1.17 % Cu over 3.2 m from 401.5 m
Sep 11, 2018KC18-038-W1 5.7 % CuEq over 28.0 m from 495.0 m