| ETM Withdraws from Non-Core Spanish Projects | Nov 19, 2026 | Operations update | ASX |
|---|
| ETM upgrades U.S. OTC quotation to OTCID | Nov 18, 2026 | Other filings | ASX |
|---|
| Legal Update | Nov 8, 2026 | Legal or regulatory action | ASX |
|---|
| Notification of cessation of securities - ETM | Oct 29, 2026 | Financing | ASX |
|---|
| Legal Update | Oct 27, 2026 | Legal or regulatory action | ASX |
|---|
| Quarterly Activities/Appendix 5B Cash Flow Report | Oct 25, 2026 | Quarterly report | ASX |
|---|
| Penouta project update | Oct 12, 2026 | Operations update | ASX |
|---|
| Notification of cessation of securities - ETM | Oct 2, 2026 | Financing | ASX |
|---|
| Cessation of Chief Financial Officer | Sep 23, 2026 | Management or board change | ASX |
|---|
| Half Yearly Report and Accounts | Sep 7, 2026 | Interim report | ASX |
|---|
| S&P DJI Announces September 2026 Quarterly Rebalance | Sep 4, 2026 | Other filings | ASX |
|---|
| Legal Update | Sep 1, 2026 | Legal or regulatory action | ASX |
|---|
| Notification of cessation of securities - ETM | Aug 5, 2026 | Financing | ASX |
|---|
| Quarterly Activities/Appendix 5B Cash Flow Report | Jul 29, 2026 | Quarterly report | ASX |
|---|
| ETM Completes Acquisition of Penouta | Jul 20, 2026 | Acquisition or disposal | ASX |
|---|
| Greenlandic Government decision on Kvanefjeld extension | Jun 28, 2026 | Legal or regulatory action | ASX |
|---|
| Kvanefjeld Rare Earth Target Discovered | Jun 11, 2026 | Operations update | ASX |
|---|
| Former US official, Alex Gray appointed to Advisory Board | May 25, 2026 | Management or board change | ASX |
|---|
| ETM and Traxys conclude offtake MoU for Penouta | May 11, 2026 | Material contract | ASX |
|---|
| Penouta Mineral Resource Update | May 3, 2026 | Operations update | ASX |
|---|
| Key Spanish Foreign Direct Investment Approval for Penouta | Apr 7, 2026 | Acquisition or disposal | ASX |
|---|
| Update on Kvanefjeld Exploration Licence | Apr 7, 2026 | Operations update | ASX |
|---|
| Trading Halt | Apr 1, 2026 | Trading halt or suspension | ASX |
|---|
| Pause in Trading | Apr 1, 2026 | Trading halt or suspension | ASX |
|---|
| Update regarding Kvanefjeld Project | Mar 31, 2026 | Operations update | ASX |
|---|
| Update - S&P DJI March 2026 Rebalance of the All Ordinaries | Mar 10, 2026 | Other filings | ASX |
|---|
| Legal Update | Mar 9, 2026 | Legal or regulatory action | ASX |
|---|
| S&P DJI Announces March 2026 Quarterly Rebalance | Mar 6, 2026 | Other filings | ASX |
|---|
| Update on Shenghe Top-Up Right | Jan 29, 2026 | Other filings | ASX |
|---|
| Successful A$24.7m Placement | Jan 29, 2026 | Financing | ASX |
|---|
| Quarterly Activities/Appendix 5B Cash Flow Report | Jan 26, 2026 | Quarterly report | ASX |
|---|
| Appointment of Ballard Partners | Jan 8, 2026 | Management or board change | ASX |
|---|
| Update on Greenland Litigation | Nov 16, 2025 | Legal or regulatory action | ASX |
|---|
| Update on Legal Proceedings | Nov 10, 2025 | Legal or regulatory action | ASX |
|---|
| Appointment of Danish Advisors to Advisory Board | Nov 4, 2025 | Management or board change | ASX |
|---|
| Arbitration update | Oct 28, 2025 | Legal or regulatory action | ASX |
|---|
| Judicial Approval for Penouta Acquisition | Oct 20, 2025 | Acquisition or disposal | ASX |
|---|
| Share Purchase Plan Closes Early Raising $8M | Aug 25, 2025 | Financing | ASX |
|---|
| ETM Secures Penouta Mine and $10m Strategic Placement | Aug 6, 2025 | Financing | ASX |
|---|
| Reinstatement to Quotation | Aug 6, 2025 | Trading halt or suspension | ASX |
|---|
| Suspension from Quotation | Aug 1, 2025 | Trading halt or suspension | ASX |
|---|
| Recommended Preferred Bidder for the Acquisition of Penouta | Jul 17, 2025 | Acquisition or disposal | ASX |
|---|
| Qualified Bidder Status for the Acquisition of Penouta Spain | Jul 13, 2025 | Acquisition or disposal | ASX |
|---|
| Quarterly Activities and Cashflow Report - 31 March 2025 | Apr 30, 2025 | Quarterly report | ASX |
|---|
| Response to ASX Price Query | Mar 13, 2025 | Explanation request | ASX |
|---|
| Options Prospectus | Jan 24, 2025 | Offer document | ASX |
|---|
| Successful A$9.35m Placement | Jan 20, 2025 | Financing | ASX |
|---|
| Response to ASX Price and Volume Query | Jan 3, 2025 | Explanation request | ASX |
|---|
| Appendix 5B | Oct 30, 2024 | Quarterly report | ASX |
|---|
| Quarterly Activities Report | Oct 30, 2024 | Quarterly report | ASX |
|---|
| Arbitration Proceedings - Tribunal Orders Bifurcation | Oct 3, 2024 | Legal or regulatory action | ASX |
|---|
| Results from Second Drilling Program at Villasrubias | Sep 18, 2024 | Operations update | ASX |
|---|
| Additional Exploration Licences Granted in Spain | Jun 20, 2024 | Operations update | ASX |
|---|
| Kvanefjeld Project, Greenland - Update on Legal Proceedings | May 26, 2024 | Legal or regulatory action | ASX |
|---|
| Update on Arbitration Process | Jan 18, 2024 | Legal or regulatory action | ASX |
|---|
| Update on Arbitration Proceedings | Nov 2, 2023 | Legal or regulatory action | ASX |
|---|
| Energy Transition Minerals Secures Strategic Lithium Project | Oct 31, 2023 | Acquisition or disposal | ASX |
|---|
| Decision Received on Amended Exploitation Licence Applicatio | Sep 11, 2023 | Legal or regulatory action | ASX |
|---|
| Drilling Results from the Villasrubias Project | Sep 6, 2023 | Operations update | ASX |
|---|
| Application for Four Additional Exploration Licences - Spain | Aug 7, 2023 | Operations update | ASX |
|---|
| Draft Decision on Amended Exploitation Licence Application | Aug 3, 2023 | Legal or regulatory action | ASX |
|---|
| Arbitration - Filing of the Statement of Claim | Jul 20, 2023 | Legal or regulatory action | ASX |
|---|
| High Grade Lithium Intersected at Villasrubias Project | Jun 28, 2023 | Other filings | ASX |
|---|
| Government of Greenland Refuses Exploitation Licence Applica | Jun 2, 2023 | Legal or regulatory action | ASX |
|---|
| AGM Presentation | May 30, 2023 | Other filings | ASX |
|---|
| Dispute Claim Amount, Reported Misinformation | May 12, 2023 | Legal or regulatory action | ASX |
|---|
| Drilling Begins at Villasrubias Lithium Project | Mar 16, 2023 | Operations update | ASX |
|---|
| Aeromagnetic Results from Villasrubias - JORC Table | Jan 15, 2023 | Operations update | ASX |
|---|
| Areas of Lithium Prospectivity Identified at Villasrubias | Jan 12, 2023 | Operations update | ASX |
|---|
| Response to ASX Price Query Letter | Dec 28, 2022 | Explanation request | ASX |
|---|
| Licensing Update for the Kvanefjeld Rare Earth Element Proje | Dec 19, 2022 | Operations update | ASX |
|---|
| Update on Arbitration concerning the Kvanefjeld Project | Sep 26, 2022 | Other filings | ASX |
|---|
| Notice of General Meeting/Proxy Form | Sep 21, 2022 | Meeting notice | ASX |
|---|
| Update on Draft Exploitation Licence Decision | Aug 31, 2022 | Other filings | ASX |
|---|
| Draft Exploitation Licence Decision and White Paper Review | Jul 26, 2022 | Other filings | ASX |
|---|
| Lithium Project Acquisition Presentation | Jul 14, 2022 | Acquisition or disposal | ASX |
|---|
| Agreement to acquire interest in lithium project | Jul 14, 2022 | Acquisition or disposal | ASX |
|---|
| Litigation Funding Secured | Jul 5, 2022 | Legal or regulatory action | ASX |
|---|
| Pause in trading | Jul 5, 2022 | Trading halt or suspension | ASX |
|---|
| Notification From Government of Greenland | May 10, 2022 | Other filings | ASX |
|---|
| Commencement of Arbitration Against Greenland and Denmark | Mar 22, 2022 | Other filings | ASX |
|---|
| S&P DJI Announces March 2022 Quarterly Rebalance | Mar 4, 2022 | Other filings | ASX |
|---|
| Greenland Government Meetings Update | Feb 24, 2022 | Other filings | ASX |
|---|
| Greenland Government Meeting on Uranium Legislation | Dec 19, 2021 | Other filings | ASX |
|---|
| GGG appoints new Managing Director to commence strategic rev | Dec 5, 2021 | Other filings | ASX |
|---|
| Greenlands New Uranium Legislation | Nov 11, 2021 | Other filings | ASX |
|---|
| Public Consultation White Paper Responses Submitted | Nov 1, 2021 | Other filings | ASX |
|---|
| Company Prepares White Paper Following Public Consultation | Sep 16, 2021 | Other filings | ASX |
|---|
| Update on Kvanefjeld Public Meetings | Aug 24, 2021 | Other filings | ASX |
|---|
| Quarterly Cashflow Report | Jul 27, 2021 | Quarterly report | ASX |
|---|
| Greenland Government Extends Public Consultation | May 31, 2021 | Other filings | ASX |
|---|
| Company Seeks Consultation with New Greenland Government | Apr 21, 2021 | Other filings | ASX |
|---|
| Greenland Election Outcome | Apr 9, 2021 | Other filings | ASX |
|---|
| Kvanefjeld Project Public Consultation Update | Feb 15, 2021 | Other filings | ASX |
|---|
| Extension to Kvanefjeld Public Consultation Period | Feb 4, 2021 | Other filings | ASX |
|---|
| Kvanefjeld Public Consultation to Commence | Dec 17, 2020 | Other filings | ASX |
|---|
| Completion of $30M Capital Raising and Launch of SPP | Nov 24, 2020 | Financing | ASX |
|---|
| Advanced Test Work Delivers Increasing RE Recoveries | Oct 6, 2020 | Other filings | ASX |
|---|
| Kvanefjeld EIA Accepted for Public Consultation | Sep 23, 2020 | Other filings | ASX |
|---|
| EIA Review Status | Aug 27, 2020 | Other filings | ASX |
|---|
| Key Appointment - Executive General Manager | Jul 1, 2020 | Management or board change | ASX |
|---|
| S&P DJI Announces June 2020 Quarterly Rebalance | Jun 11, 2020 | Other filings | ASX |
|---|
| Updated EIA Lodged with Greenland Government | May 21, 2020 | Other filings | ASX |
|---|
| Approval of Exploitable Minerals Documentation | Apr 28, 2020 | Other filings | ASX |
|---|
| Path to Finalise Environmental Impact Assessment | Oct 21, 2019 | Other filings | ASX |
|---|
| Company Secures $7 million Via Share Placement | Jul 31, 2019 | Financing | ASX |
|---|
| Mining License Application Formally Lodged | Jul 23, 2019 | Other filings | ASX |
|---|
| Kvanefjeld Optimised Capital Cost Estimate | Jul 9, 2019 | Other filings | ASX |
|---|
| Kvanefjeld Optimised Feasibility Update | May 15, 2019 | Other filings | ASX |
|---|
| Social Impact Assessment Ready for Public Consultation | Mar 28, 2019 | Other filings | ASX |
|---|
| Engineering Studies Completed | Mar 26, 2019 | Other filings | ASX |
|---|
| MoU Signed with Southern Municipality & Business Council | Mar 7, 2019 | Other filings | ASX |
|---|
| Engineering Optimisation Studies Advancing | Jan 29, 2019 | Other filings | ASX |
|---|
| Shenghe Forms JV to Import Radioactive Material to China | Jan 22, 2019 | Other filings | ASX |
|---|
| Key Optimised Flotation Circuit Test Work Completed | Jan 9, 2019 | Other filings | ASX |
|---|
| ASX Price Query Response | Dec 23, 2018 | Explanation request | ASX |
|---|
| Civil Engineering Optimisation for Kvanafjeld | Oct 21, 2018 | Other filings | ASX |
|---|
| Permitting and Coalition Government Update | Oct 10, 2018 | Other filings | ASX |
|---|
| International Engineering Team Conducts Site Visit | Sep 17, 2018 | Other filings | ASX |
|---|
| EIA Report Lodged with Greenland Government | Sep 2, 2018 | Other filings | ASX |
|---|
| IAEA Inaugural Safeguards Inspection of Kvanefjeld | Aug 31, 2018 | Other filings | ASX |
|---|
| MoU Signed with Shenghe for the Commercisation of Kvanefjeld | Aug 20, 2018 | Other filings | ASX |
|---|
| Optimisation Test Work Progressing to Final Pilot Plant | Jul 11, 2018 | Other filings | ASX |
|---|
| New Pro-Mining Coalition Government in Greenland | May 8, 2018 | Other filings | ASX |
|---|
| Flotation Optimisation Update | Apr 16, 2018 | Other filings | ASX |
|---|
| EIA and SIA for Kvanefjeld Project Set for Completion | Apr 3, 2018 | Other filings | ASX |
|---|
| Enhanced Rare Earth Leaching Method Established | Jan 14, 2018 | Other filings | ASX |
|---|
| Major Metallurgical Improvements - Including JORC Table 1 | Dec 20, 2017 | Other filings | ASX |
|---|
| Major Improvements to Kvanefjeld Metallurgical Performance | Dec 6, 2017 | Other filings | ASX |
|---|
| Greenland Minerals Secures $10.25 Million Via Placement | Nov 23, 2017 | Financing | ASX |
|---|
| Kvanefjeld Maritime Safety Study Approved | Oct 11, 2017 | Other filings | ASX |
|---|
| Kvanefjeld Project Update 2017 Field Season Complete | Sep 14, 2017 | Operations update | ASX |
|---|
| Kvanefjeld Environmental Impact Assessment Update | Jul 18, 2017 | Other filings | ASX |
|---|
| Rare Earth Market Update | Jul 4, 2017 | Other filings | ASX |
|---|
| Shenghe Technical Cooperative Program Commences | Mar 16, 2017 | Other filings | ASX |
|---|
| Kvanefjeld EIA Review Process - Status Update | Mar 14, 2017 | Other filings | ASX |
|---|
| Refundable Research and Development Rebate Received | Nov 16, 2016 | Other filings | ASX |
|---|
| Le Shan Shenghe Receives FIRB Approval | Nov 10, 2016 | Other filings | ASX |
|---|
| S&P DJ Indices Announces March Quarterly Rebalance | Nov 7, 2016 | Other filings | ASX |
|---|
| Response to ASX price query | Oct 25, 2016 | Explanation request | ASX |
|---|
| Shenghe Agreement Further Clarity and Information | Oct 3, 2016 | Other filings | ASX |
|---|
| Strategic Relationship With Shenghe Resources Holding Ltd | Sep 23, 2016 | Other filings | ASX |
|---|
| Response to ASX Query | Aug 25, 2016 | Explanation request | ASX |
|---|
| Greenland and Denmark Pass Uranium Export Legislation | Jun 8, 2016 | Other filings | ASX |
|---|
| Prospectus | Jun 2, 2016 | Offer document | ASX |
|---|
| Reinstatement to Official quotation | Jun 1, 2016 | Trading halt or suspension | ASX |
|---|
| $2M Capital Raising to Fund Kvanefjeld Project Permitting | May 31, 2016 | Financing | ASX |
|---|
| Suspension from official quotation | May 27, 2016 | Trading halt or suspension | ASX |
|---|
| Kvanefjeld Feasibility Study Update | Apr 6, 2016 | Other filings | ASX |
|---|
| Rights Issue to Fund the Permitting Process | Mar 30, 2016 | Financing | ASX |
|---|
| Greenland Repeals Zero Tolerance Uranium Policy | Mar 30, 2016 | Other filings | ASX |
|---|
| Update Feasibility Study Progress | Mar 30, 2016 | Other filings | ASX |
|---|
| Changes to board and management | Mar 30, 2016 | Other filings | ASX |
|---|
| Hydro Power Generation Concept for Kvanefjeld | Mar 8, 2016 | Other filings | ASX |
|---|
| Greenland and Denmark Confirm Uranium Agreements | Feb 11, 2016 | Other filings | ASX |
|---|
| Secondary Trading Prospectus | Feb 10, 2016 | Offer document | ASX |
|---|
| Greenland and Denmark Landmark Agreement on Uranium | Feb 10, 2016 | Other filings | ASX |
|---|
| Greenland Ratifies International Uranium Conventions | Feb 10, 2016 | Other filings | ASX |
|---|
| Government Pre Hearing Approvals Complete | Feb 10, 2016 | Other filings | ASX |
|---|
| Refinery Piloting Successfully Completed | Feb 10, 2016 | Other filings | ASX |
|---|
| Reinstatement | Feb 10, 2016 | Other filings | ASX |
|---|
| Completion of $3M Underwritten Part of Rights Issue | Feb 10, 2016 | Financing | ASX |
|---|
| Refinery Pilot Plant Yields Excellent Initial Results | Feb 10, 2016 | Other filings | ASX |
|---|
| Kvanefjeld Project Optimisation | Feb 10, 2016 | Other filings | ASX |
|---|
| Kvanefjeld - Mining Licence Application Update | Feb 10, 2016 | Other filings | ASX |
|---|
| Successful Pilot Plant Operation Kvanefjeld Project | Feb 10, 2016 | Other filings | ASX |
|---|
| Maiden Ore Reserves Estimate for the Kvanefjeld Project | Feb 10, 2016 | Operations update | ASX |
|---|
| Positive Kvanefjeld Feasibility Study | Feb 10, 2016 | Other filings | ASX |
|---|
| Research and Development Rebate Received | Feb 10, 2016 | Other filings | ASX |
|---|
| New Memorandum of Understanding Signed With NFC | Feb 10, 2016 | Other filings | ASX |
|---|
| Acquisition of Outstanding 2% Royalty | Feb 10, 2016 | Acquisition or disposal | ASX |
|---|
| S&P DJ Indices Announces March Quarterly Review | Feb 10, 2016 | Other filings | ASX |
|---|
| Update on Current Activities, Outlook and Funding | Feb 10, 2016 | Guidance | ASX |
|---|
| Updated mineral resource estimate | Feb 10, 2016 | Operations update | ASX |
|---|
| Assay of Historic Drill Cores at Kvanefjeld | Feb 10, 2016 | Operations update | ASX |
|---|
| Tetra Tech Engineering Design Study Complete | Feb 10, 2016 | Other filings | ASX |
|---|
| Kvanefjeld Update - Key Milestones Approaching | Feb 10, 2016 | Other filings | ASX |
|---|
| EURARE Project Update | Feb 10, 2016 | Operations update | ASX |
|---|
| Reinstatement to Official List | Feb 10, 2016 | Other filings | ASX |
|---|
| Renounceable Right Issue Prospectus | Feb 10, 2016 | Offer document | ASX |
|---|
| Fully Underwritten Renounceable Rights Issue | Feb 10, 2016 | Financing | ASX |
|---|
| Company signs Memorandum of Understanding with China NFC | Feb 10, 2016 | Other filings | ASX |
|---|
| Process Engineering Design for Refining Circuit Complete | Feb 10, 2016 | Other filings | ASX |
|---|
| Update on Environmental & Social Impact Assessments | Feb 10, 2016 | Other filings | ASX |
|---|
| Technical Update Refining Process | Feb 10, 2016 | Other filings | ASX |
|---|
| Companys participation in EU rare earth project | Feb 10, 2016 | Other filings | ASX |
|---|
| Kvanefjeld Feasibility Study Developments | Feb 10, 2016 | Other filings | ASX |
|---|
| Feasibility Update - Implementation Strategy | Feb 10, 2016 | Other filings | ASX |
|---|
| Company adjustments to maximise cash resources | Feb 10, 2016 | Other filings | ASX |
|---|
| Concentrator Pilot Plant Campaign Results Exceed Expectation | Feb 10, 2016 | Other filings | ASX |
|---|
| Political developments in Greenlands uranium policy | Feb 10, 2016 | Other filings | ASX |
|---|
| Settlement finalised, move to 100% ownership of Kvanefjeld | Feb 10, 2016 | Other filings | ASX |
|---|
| Greenland Minerals and Energy Completes Capital Raising | Feb 10, 2016 | Financing | ASX |
|---|
| Kvanefjeld Feasibility Study Underway | Feb 10, 2016 | Other filings | ASX |
|---|
| Technical Update - Hydrometallurgical Advances | Feb 10, 2016 | Other filings | ASX |
|---|
| Continued Beneficiation Success Strengthens Kvanefjeld | Feb 10, 2016 | Other filings | ASX |
|---|
| Amended settlement to move 100% ownership of Kvanefjeld | Feb 10, 2016 | Other filings | ASX |
|---|
| Extension of Settlement Period | Feb 10, 2016 | Other filings | ASX |
|---|
| Initial Mineral Resource Estimate Zone 3 | Feb 10, 2016 | Operations update | ASX |
|---|
| Open Briefing on PFS Outcomes | Feb 10, 2016 | Other filings | ASX |
|---|