Urbana Corporation (CSE:URB.A) Drill core

Urbana Corporation

Drill core

ReleaseDateProjectHeadline hole
Urbana Corporation Intersects 4.2 g/t Au over 10 Metres and Begins Second Drill Program
UU-25-02 0.58 g/t Au over 3.80 m from 110.20 m
UU-25-05 1.15 g/t Au over 2.00 m from 213.00 m
Mar 16, 2026UU-25-01 3.27 g/t Au over 3.45 m from 89.20 m
Urbana Corporation Intersects 6.98 g/t Gold over 6.00 metres at the Urban Gold Project
UU-25-01 3.28 g/t Au over 3.45 m from 89.20 m
UU-25-02 0.59 g/t Au over 3.80 m from 110.20 m
Aug 7, 2025Urban Gold ProjectUU-25-12 6.98 g/t Au over 6.00 m from 23.00 m