Green Bridge Metals Corporation (CSE:GRBM) Drill core

Green Bridge Metals Corporation

Drill core

ReleaseDateProjectHeadline hole
Green Bridge Metals Intersects 195.0 Metres Grading 0.25% Cu and 10.18% TiO2 at Titac South, Minnesota; Step-Out Hole Confirms Mineralization at Previously Untested Geophysical Target
TS26-004a 0.25 % Cu over 195.0 m from 65.0 m
TS26-007 0.06 % Cu over 362.0 m from 20.0 m
Sep 10, 2026Titac ProjectTS26-001 0.08 % Cu over 272.8 m from 26.2 m
Green Bridge Metals Reports Initial Assays from Drill Program
TS26-003 0.30 % Cu over 190.0 m from 39.0 m
TS26-005 0.31 % Cu over 152.0 m from 231.0 m
May 27, 2026Titac ProjectTS26-002a 0.12 % Cu over 278.1 m from 32.8 m