Vista Gold Corp (BX:JEJ) Studies

Vista Gold Corp

Studies

StudyDateProjectStudyNPVIRR
Vista Gold Confirms Strong Economics for Mt Todd Gold Project With Re-sized 15,000 Tonnes Per Day Feasibility StudyJul 29, 2025Mt Todd gold projectFeasibility studyUS$1.1B, after-tax, 5%27.8%, after-tax
Vista Gold Announces Updated Feasibility Study for Mt Todd Gold ProjectMar 13, 2024Mt Todd gold projectFeasibility studyUS$1.13B, after-tax, 5%20.4%, after-tax
Vista Gold Corp. Announces 2021 Financial Results and Files Feasibility Study for the Mt Todd Gold ProjectFeb 24, 2022Mt Todd Gold ProjectFeasibility studyUS$999.5M, after-tax, 5%20.6%, after-tax
Vista Gold Corp. Files Updated Preliminary Feasibility Study For The Mt Todd Gold ProjectOct 7, 2019Mt Todd gold projectPre-feasibility studyUS$823M, 5%23.4%
Vista Gold Announces Updated Preliminary Feasibility Study for the Mt Todd Gold Project with Increased After-Tax NPV5% of $823 Million and IRR of 23.4%Sep 10, 2019Mt Todd gold projectPre-feasibility studyUS$823M, after-tax, 5%23.4%, after-tax
Vista Gold Announces Updated Mt Todd Preliminary Feasibility Study Showing Strong Returns At US$1300 Gold PriceJan 24, 2018Mt Todd gold projectPre-feasibility studyUS$679.0M, after-tax, 5%20.5%, after-tax
Vista Gold Corp. Announces Mt. Todd Gold Project Preliminary Feasibility Study And Increase In Reserves Of 44% To 5.9 Million Ounces Of GoldMay 29, 2013Mt. Todd gold projectPre-feasibility studyUS$591.3M, after-tax, 5%15.9%, after-tax
Vista Gold Corp. Announces Positive Preliminary Economic Assessment for Guadalupe de los Reyes Project Indicating an After-Tax Net Present Value of $57.3 MillionMar 4, 2013Guadalupe de los ReyesPreliminary economic assessmentUS$57.3M, after-tax, 8%21%, after-tax
Vista Gold Corp. Announces Updated Mineral Resources for the Guadalupe de los Reyes Gold ProjectSep 3, 2009Guadalupe de los Reyes gold projectTechnical report
Vista Gold Corp. Announces Results of a Preliminary Economic Assessment and Increases Estimated Measured and Indicated Resources by 12.8% at Its Mt. Todd Gold Project, Northern Territory, AustraliaJun 4, 2009Mt. Todd gold projectPreliminary economic assessmentUS$232,894k, pre-tax, 8%21.6%, pre-tax
Vista Gold Corp. Announces 57% Increase in Measured and Indicated Gold Resource Estimates at the Mt. Todd Project Increasing Measured and Indicated Resources by 1.65 Million Ounces and Inferred Resources by 318,000 OuncesJan 26, 2009Mt. Todd Gold ProjectTechnical report
Vista Gold Corp., Mt. Todd Gold Project - Updated Resource Calculation Ounces of GoldFeb 27, 2008Mt. Todd Gold ProjectTechnical report
Vista Gold Corp. Announces Gold Resource Estimate for the Awak Mas Gold Project, South Sulawesi, IndonesiaJun 6, 2007Awak Mas Gold ProjectTechnical report
Vista Gold Corp. Announces Filing of Technical Reports for Various Properties and a Resource Estimate for the Amayapampa Project, BoliviaOct 18, 2006Amayapampa projectTechnical report
Vista Gold Corp. Announces Gold Resource Estimate for the Mt. Todd Gold Project, Northern Territory, Australia, and General UpdateJun 26, 2006Mt. Todd Gold ProjectTechnical report
Vista Gold Corp. Announces Updated Feasibility Study for Possible Restart of Operations at the Hycroft Mine in Nevada and Updates the Economics on the Paredones Amarillos Gold Project in MexicoJan 30, 2006Hycroft MineFeasibility studyUS$18.9M, pre-tax, 5%29.5%, pre-tax
Vista Gold Corp. Announces Canyon Resources Corporation Elects Not to Exercise Hycroft Option, New Hycroft Resource Estimate Reports 30% Increase in Measured and Indicated Gold ResourcesAug 4, 2005Hycroft mineTechnical report