Wildcat Resources Ltd. (ASX:WC8) Drill core

Wildcat Resources Ltd.

Drill core

ReleaseDateProjectHeadline hole
CONTINUED STRONG DRILL RESULTS
BCRC101 0.82 % Li2O over 3 m from 20 m
BCRC102 1.01 % Li2O over 3 m from 45 m
Aug 30, 2026Bolt Cutter Central and Tabba TabbaBCRC100 0.34 % Li2O over 4 m from 43 m
BOLT CUTTER EMERGING AS A KEY SPOKE IN GROWING LITHIUM HUB
BCDD001 2.02 % Li2O over 12.8 m from 45.3 m
BCRC034 1.65 % Li2O over 12 m from 90 m
Jan 12, 2026Bolt Cutter CentralBCRC002 1.70 % Li2O over 20.0 m from 43.0 m