Valiant Gold Limited (ASX:VAL) Drill core

Valiant Gold Limited

Drill core

ReleaseDateProjectHeadline hole
Boomerang Drill Results Return High-Grade Gold Intercepts
26BMDD002 4.35 g/t Au over 6.8 m from 423.5 m
26BMDD003 7.93 g/t Au over 4.1 m from 287.4 m
Oct 27, 2026Reedy Gold Project26BMDD001 5.70 g/t Au over 6.0 m from 469.0 m
South Emu-Triton Drilling Continues to Return Strong Results
26REDD003 4.57 g/t Au over 7.0 m from 861.0 m
Aug 30, 2026Boomerang Gold Deposit26REDD002 2.78 g/t Au over 1.0 m from 706.0 m