Minerals 260 Limited (ASX:MI6) Drill core

Minerals 260 Limited

Drill core

ReleaseDateProjectHeadline hole
Grade Control Drilling Strengthens Bullabulling Resource
BBGC0070 10.9 g/t Au over 7 m from 7 m
BBGC0123 9.0 g/t Au over 11 m from 49 m
Oct 12, 20266.2Moz Bullabulling Gold ProjectBBGC0026 3.4 g/t Au over 21 m from 27 m
Drilling at Bullabulling Continues to Deliver Strong Results
BBRD0682 3.0 g/t Au over 5 m from 234 m
BBRC0688 1.1 g/t Au over 12 m from 36 m
Aug 19, 20266.2Moz Bullabulling Gold ProjectBBRC0658 3.0 g/t Au over 8 m from 56 m
Bullabulling Drilling Extends Gold Mineralisation at Depth
BBRD0645 8.9 g/t Au over 2 m from 250 m
BBRC0649 3.5 g/t Au over 3 m from 205 m
Jun 24, 20264.5Moz Bullabulling Gold ProjectBBRD0644 3.8 g/t Au over 3.9 m from 283 m
Strong Drilling Results, Maiden Reserve and MRE on Track
BBRC0500 3.3 g/t Au over 11 m from 185 m
BBRC0501 0.8 g/t Au over 19 m from 94 m
Mar 29, 2026Bullabulling Gold ProjectBBRC0489 2.7 g/t Au over 4 m from 72 m
Strong Results and Drilling Recommences at Bullabulling
BBRC0412 10.3 g/t Au over 2 m from 99 m
BBRD0422 8.5 g/t Au over 1 m from 158.6 m
Feb 15, 2026Bullabulling Gold ProjectBBRC0483 12.7 g/t Au over 7 m from 158 m
High-Grade Gold Continues to be Intersected at Bullabulling
BBRC0431 1.3 g/t Au over 12 m from 180 m
BBRC0462 1.26 g/t Au over 19 m from 42 m
Dec 14, 20254.5Moz Bullabulling Gold ProjectBBRC0376 1.0 g/t Au over 14 m from 88 m
Drilling Extends Mineralisation at Depth & Along Strike
BBRC0288 2.4 g/t Au over 10 m from 75 m
BBRC0320 10.9 g/t Au over 10 m from 203 m
Nov 4, 2025Bullabulling Gold ProjectBBRC0299 2.0 g/t Au over 12 m from 220 m