Aruma Resources Limited (ASX:AAJ) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Drilling Continues to Expand Tillex Copper-Silver System TX26-012 1.47 % Cu over 9.12 m from 48.4 m TX26-013 1.43 % Cu over 12.7 m from 54 m | Oct 21, 2026 | Tillex Copper-Silver Project | TX26-011 1.69 % Cu over 15.95 m from 46.4 m |
| Exceptional Broad High-Grade Results at Tillex Cu-Ag Project TX26-007 0.45 % Cu over 3 m from 182 m TX26-009 1.07 % Cu over 11.68 m from 39 m | Sep 16, 2026 | Tillex Cu-Ag Project | TX26-006 1.38 % Cu over 14 m from 83 m |
| Exceptional High-grade Drilling Results at Tillex Project TX26-002 1.99 % Cu over 87 m from 30 m TX26-005 1.91 % Cu over 59 m from 38 m | Jun 17, 2026 | Tillex Project | TX26-004 2.04 % Cu over 89 m from 38.8 m |