Aruma Resources Limited (ASX:AAJ) Drill core

Aruma Resources Limited

Drill core

ReleaseDateProjectHeadline hole
Drilling Continues to Expand Tillex Copper-Silver System
TX26-012 1.47 % Cu over 9.12 m from 48.4 m
TX26-013 1.43 % Cu over 12.7 m from 54 m
Oct 21, 2026Tillex Copper-Silver ProjectTX26-011 1.69 % Cu over 15.95 m from 46.4 m
Exceptional Broad High-Grade Results at Tillex Cu-Ag Project
TX26-007 0.45 % Cu over 3 m from 182 m
TX26-009 1.07 % Cu over 11.68 m from 39 m
Sep 16, 2026Tillex Cu-Ag ProjectTX26-006 1.38 % Cu over 14 m from 83 m
Exceptional High-grade Drilling Results at Tillex Project
TX26-002 1.99 % Cu over 87 m from 30 m
TX26-005 1.91 % Cu over 59 m from 38 m
Jun 17, 2026Tillex ProjectTX26-004 2.04 % Cu over 89 m from 38.8 m