Ormonde Mining PLC (AQUIS:ORM) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Peralonso Drilling Results PERDD002 1.14 g/t Au over 5.8 m from 8.9 m PERDD004 4.51 g/t Au over 1.0 m from 72.0 m | Mar 11, 2013 | Peralonso Permit | PERDD001 3.39 g/t Au over 10.1 m from 46.9 m |
| Drilling Results at Peralonso PERDD005 1.87 g/t Au over 6.0 m from 75.0 m PERDD006 1.38 g/t Au over 6.0 m from 0.0 m | Jan 23, 2013 | Peralonso Permit | PERDD004 4.51 g/t Au over 1.0 m from 72.0 m |
| Salamanca Drilling Results SC-1 4.3 g/t Au over 1.0 m from 4.2 m SC-2 5.9 g/t Au over 1.0 m from 28.0 m | Feb 28, 2007 | Salamanca Gold Project | ORMP-1 16.6 g/t Au over 1.0 m from 73.0 m |
| La Zarza drilling results ORM-35 2.8 % Cu over 2.0 m from 102.0 m ORM-38 0.7 % Cu over 5.0 m from 199.0 m | Feb 19, 2007 | La Zarza Copper-Gold Project | ORM-34 2.2 % Cu over 8.4 m from 323.6 m |
| Drilling Results and Update ORM14 2.0 % Cu over 47.2 m from 67.9 m ORM15 0.6 g/t Au over 37.0 m from 72.0 m | Jan 16, 2006 | La Zarza Gold-Copper Project | ORM12 4.5 g/t Au over 3.0 m from 295.0 m |
| Preliminary Drilling Results TRIVES-001-2 1.6 g/t Au over 1.61 m from 55.50 m TRIVES-002 2.4 g/t Au over 3.00 m from 137.35 m | Jan 12, 2005 | Trives Gold Project | TRIVES-001 6.4 g/t Au over 1.15 m from 33.40 m |