Suplejack Resource Update
Filed with ASX · · 18 pages · English
Prodigy Gold NL (“Prodigy Gold” or the “Company”) is pleased to announce a revised Mineral Resource Estimate at the 100% owned Suplejack Project, Northern Territory (Table 1). Table 1. July 2018 Mineral Resource Estimate for the Suplejack Project, reported using a 0.8 g/t gold cut-off and above the 230 m RL (180 m below surface) Tonnes (Mt) Au g/t Ounces (koz) The updated Mineral Resource is based
Story so far
Earlier from Prodigy Gold NL
- Lake Mackay JV - Exploration Update
- Final Capstan aircore results further extend gold anomalies
- Farm-in Agreement with Newcrest Mining signed
- New bedrock gold target identified in Capstan aircore holes
- Capstan aircore results confirm large scale gold anomalism
Later from Prodigy Gold NL
- Capstan Infill Aircore - 3m at 2.8g/t Au & 1m at 4.0g/t Au
- Capstan Prospect Diamond Drilling Underway
- Final Capstan Infill Aircore Results
- Lake Mackay JV - IGO meet 70% Earn-in Expenditure
- Capstan Prospect Stratigraphic Drilling Results
Follow Prodigy Gold NL into a list and get an email when it puts out news.
Follow Prodigy Gold NL