Substantial Increase in Mineral Resource at Bennet Well
Filed with ASX · · 50 pages · English
• An increase in the total Mineral Resource (JORC 2012) estimate of Bennet Well to 38.9 Mt at 360 ppm eU3O8, for total contained uranium-oxide of 30.9 Mlb (13,990 t) at 150 ppm cut-off • 33% increase in uranium grade from 270 ppm to 360 ppm eU3O8 • Mineral Resource exceeds 30 Mlb contained uranium oxide • Mineralisation remains open inclusive of the new area under application ELA 08/2774 (ASX anno
Cauldron Energy Limited on 6ix
Later from Cauldron Energy
- Cauldron Wins Legal Proceedings
- 10,000m Drilling Campaign Set to Begin at Bennet Well
- Bennet Well Resource Grows
- Cauldron Energy to Urge Mines Minister to Grant Licences
- Marree Project Exploration Update
Follow Cauldron Energy into a list and get an email when it puts out news.
Follow Cauldron Energy