SDX Energy plcTSXV: SDX

Sea dragon provides an operational update on Egypt

· Issued by SDX Energy plc via CNW

May 25, 2011 (Canada NewsWire Group) --

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

CALGARY, May 25, 2011 /CNW/ - Sea Dragon Energy Inc. ("Sea Dragon" or the "Company") (TSX VENTURE: SDX) is pleased to provide the following update on its operations in Egypt.

NW Gemsa Concession

Geyad-3C Well:

The Geyad-3C well was spud on April 22nd, 2011, drilled to a total depth of 5,635 feet and completed as an oil producer in the Shagar member of the Kareem Formation.  The well is located some 1.4 km to the southeast of the Geyad-1X ST well and 2.9 km southeast of the Geyad-2 ST well within the Geyad Development Lease. The oil bearing Shagar sands were encountered 122 feet higher than prognosis with 14 feet of net oil pay.

The well is currently undergoing testing operations, flowing oil to surface at a rate of 2,430 bopd and 2.53mmscf/d on a 32/64 choke size. The well is already connected to the Geyad production system and upon completion of testing operations, will immediately be placed on continuous production. The Belayim sands were also encountered in the Geyad-3C well with an indicated 5 feet of oil pay.

The Geyad-3C has now confirmed the south easterly extension of the Geyad field. It is the first of two wells to be drilled in 2011 in the Geyad development lease. The next well will be Geyad-5C to be located 1.1 km west-south-west of Well Geyad-1X ST and 1.4 km south of Geyad-2 ST, in the western edge of the field near the oil water contact and used as a water injector.

Al Amir SE #8 Well:

The well was spud on May 20, 2011 and is now drilling below 3,000 feet. The Al Amir SE #8 well is located 2.9 km south of Al Amir SE #7 well, and as with the Al Amir SE #7 well, is targeting the western edge of the field to be completed as a peripheral water injector.

Water injection is expected to commence in late June. This marks the beginning of the water flood project which will result in significant increase in recoverable reserves and production levels from the field.

With the Geyad-3C undergoing testing operations, current production from the Al Amir SE and Geyad fields has temporarily increased to 9,470 bopd (947 bopd net to Sea Dragon). Cumulative production from the NW Gemsa Concession has now exceeded 5.2 million barrels of 42 degree API Crude oil.

Sea Dragon has a 10% working interest in the NW Gemsa Concession with Vegas at 50%, as operator, and Circle Oil PLC with 40%.

Kom Ombo Concession:

Geological, geophysical and engineering work and studies are continuing. The work includes a remapping of the Al Baraka field and exploratory prospects. This work will be complemented by the results of other geotechnical studies now underway to firm up locations for the two exploratory wells and AB-17, AB-18 and AB-19 development wells planned for the fourth quarter, 2011.

Production from the Al Baraka field is approximately 800 bopd (400 bopd net to Sea Dragon).

Sea Dragon has a 50% working Interest and is a joint operator of the Kom Ombo Concession with Dana Gas owning the remaining 50%.

Commenting on the latest developments on the Company's operations in Egypt, Company Chairman and CEO Mr. Said Arrata stated "The success of our development drilling and delineation work in both Al Amir SE and Geyad fields in our NW Gemsa Concession is most gratifying. We are looking forward to the commencement of the water flood project and the resulting increase in production. In Kom Ombo, detailed geotechnical work is well underway in preparation for the fall drilling season".

Certain statements contained in this press release constitute "forward-looking statements" as such term is used in applicable Canadian and US securities laws. These statements relate to analyses and other information that are based upon forecasts of future results, estimates of amounts not yet determinable and assumptions of management. In particular, statements concerning the development of the Al Baraka field and events or projections referenced or implied herein should be viewed as forward-looking statements.

Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or are not statements of historical fact and should be viewed as "forward-looking statements".  Such forward looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements.  Such risks and other factors include, among others, costs and timing of exploration and production development, availability of capital to fund  exploration and production development; political, social and other risks inherent in carrying on business in a foreign jurisdiction, the effects of a recessionary economy and such other business risks as discussed herein and other publicly filed disclosure documents.  Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended.  There can be no assurance that such statements will prove to be accurate as actual results and future events could vary or differ materially from those anticipated in such statements.  Accordingly, readers should not place undue reliance on forward-looking statements contained in this news release.

Forward-looking statements are made based on management's beliefs, estimates and opinions on the date the statements are made and the Company undertakes no obligation to update forward-looking statements and if these beliefs, estimates and opinions or other circumstances should change, except as required by applicable law.

This news release contains forward-looking statements based on assumptions, uncertainties and management's best estimates of future events.  When used herein, words such as "intended" and similar expressions are intended to identify forward-looking statements.  Forward-looking statements are based on assumptions by and information available to the Company.  Investors are cautioned that such forward-looking statements involve risks and uncertainties.  Actual results may differ materially from those currently anticipated.  The forward-looking statements contained herein are expressly qualified by this cautionary statement.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE RELEASE.

Said ArrataTony Anton
Chairman, CEO and DirectorPresident, COO and Director
(403) 457-5035(403) 457-5035
Scott KoyichGraeme Dick
President, Brisco Capital PartnersBrisco Capital Partners
(403) 262-9888(403) 561-8989
skoyich@briscocapital.comgraeme@briscocapital.com

SDX Energy plc on 6ix

Earlier from SDX Energy

Later from SDX Energy

All SDX Energy news releases