Shares Issued: 36,524,244
THUNDER BAY, ON, June 9 /CNW/ - SABINA RESOURCES LIMITED (TSX-V: SBB) is
pleased to present assays from recent 2005 drilling at its 100%-owned Hackett
River Property, Nunavut. Sabina is presently engaged in the second phase of a
CAD$12 Million exploration campaign at Hackett River. The 2005 program is
focused on expansion of the Boot Lake, East Cleaver and Main "A" Zone deposit
areas.
Sabina expended a total of CAD$7 Million at Hackett River in 2004 thereby
earning a 100% interest in the Hackett River Project subject to Earn-Back
rights or a 2% NSR royalty held by Cominco Mining Partnership (CMP), an
affiliate of Teck Cominco Limited. CMP declined to exercise its Initial Earn-
Back right leaving Sabina with a 100% interest in the Hackett River Project
pending completion of an additional CAD$5 Million expenditure. Upon completion
of the additional CAD$5 Million expenditure, CMP has 90 days to exercise its
Alternate Earn-Back right to acquire a 60% interest in the Hackett River
Project. Terms include paying Sabina CAD$1 Million cash with its election
notice, funding all expenditures to the completion of a bankable feasibility
study and paying to Sabina an additional sum of CAD$1 Million cash upon
completion of the feasibility study. Should CMP terminate its right to earn
back an interest in the Hackett River Project, it shall retain a 2% NSR in the
project.
Initial 2005 assay values of up to 10.09% Zinc and 229.9 g/T Silver
(6.68 oz Ag/short ton) over 23.1m may indicate the discovery of a new lens of
mineralization at the Boot Lake Deposit. The results add significant zinc and
silver-rich potential tonnage and grade onto the west margin of known massive
sulphide mineralization at a potentially open-pittable 200m to 250m vertical
depth. A second drill at the Main "A" Zone deposit has expanded the known
extent of significant footwall copper grades in the west limb area yielding up
to 2.85% Copper over 10.6m. All three main deposit areas including East
Cleaver are open to expansion and will be further tested in 2005.
Wardrop Engineering Inc. is providing independent professional services
to Sabina in preparation of an updated NI 43-101 mineral resource estimate for
all results up to and including 2004 drilling, to be released early in the 3rd
Quarter, 2005. Wardrop will subsequently update the resource estimate with
2005 drill results and provide recommendations to Sabina for advancing the
Hackett River project to a production pre-feasibility assessment.
Boot Lake Deposit
Results from the SHR-05-03 intersection at 200m vertical depth, which
indicate the west end of an apparent eastward zinc enrichment trend with
consistently elevated silver (cosympathetic with lead grade), include:
<<
-------------------------------------------------------------------------
Zone From (m) To (m) Interval Cu % Pb % Zn % Ag g/t Au g/t
-------------------------------------------------------------------------
1 163.05 168.30 5.25 0.04 0.55 2.10 251.0 0.26
-------------------------------------------------------------------------
1(a) 166.00 167.00 1.00 0.02 0.67 1.55 699.7 0.83
-------------------------------------------------------------------------
2 178.10 178.80 0.70 0.05 0.24 3.28 61.6 0.08
-------------------------------------------------------------------------
3 209.00 209.80 0.80 0.09 0.02 3.96 2.7 0.06
-------------------------------------------------------------------------
4 211.45 213.30 1.85 0.07 0.01 3.40 3.4 0.05
-------------------------------------------------------------------------
5 233.00 243.55 9.55 0.41 0.01 4.55 21.0 0.06
-------------------------------------------------------------------------
5(a) 234.10 236.10 2.00 0.87 0.03 12.39 14.9 0.21
-------------------------------------------------------------------------
True thickness of intervals are estimated to be approximately 75% of the
drill intercept.
Results from the SHR-05-07 intersection, 50m east of Hole SHR-05-03 at
225m vertical depth include:
-------------------------------------------------------------------------
Zone From (m) To (m) Interval Cu % Pb % Zn % Ag g/t Au g/t
-------------------------------------------------------------------------
1 144.50 165.20 20.70 0.13 0.25 4.08 124.8 0.11
-------------------------------------------------------------------------
1(a) 144.50 158.00 13.50 0.06 0.38 5.84 112.7 0.08
-------------------------------------------------------------------------
1(b) 150.85 155.60 4.75 0.03 0.01 10.33 101.2 0.07
-------------------------------------------------------------------------
2 210.50 212.00 1.50 2.82 less 0.78 35.9 0.12
than
0.01
-------------------------------------------------------------------------
True thickness of intervals are estimated to be approximately 90% of the
drill intercept.
Results from the Hole SHR-05-08 intersection, 50m east of Hole SHR-05-07
at 250m vertical depth include:
-------------------------------------------------------------------------
Zone From (m) To (m) Interval Cu % Pb % Zn % Ag g/t Au g/t
-------------------------------------------------------------------------
1 178.25 201.35 23.10 0.30 1.37 10.09 229.9 0.12
-------------------------------------------------------------------------
1(a) 190.60 194.35 3.75 0.04 5.12 21.41 566.0 0.12
-------------------------------------------------------------------------
True thickness of intervals are estimated to be approximately 93% of the
drill intercept.
Hole SHR-05-01 was abandoned due to technical problems at surface.
Main A Zone Deposit
The Hole SHR-05-04 intersection is located in the western extension of
the West Limb of the "A" Zone (also called the Main Zone) where zinc and
silver-rich massive sulphide mineralization in the main deposit is underlain
by a thick copper enriched zone characteristic of a volcanogenic massive
sulphide feeder zone. Results from this hole include:
-------------------------------------------------------------------------
Zone From (m) To (m) Interval Cu % Pb % Zn % Ag g/t Au g/t
-------------------------------------------------------------------------
1 143.35 144.20 0.85 0.02 0.03 4.26 7.6 less
than
0.01
-------------------------------------------------------------------------
2 168.00 170.75 2.75 0.77 0.08 1.89 38.8 0.06
-------------------------------------------------------------------------
3 173.00 179.00 6.00 0.80 0.14 0.48 49.5 0.17
-------------------------------------------------------------------------
4 191.00 208.30 17.30 1.11 0.02 0.07 33.3 0.20
-------------------------------------------------------------------------
5 271.90 282.50 10.60 2.85 0.03 0.03 18.2 0.02
-------------------------------------------------------------------------
True thickness of intervals are estimated to be approximately 59% of the
drill intercept.
Hole SHR-05-02 was lost due to freezing in the hole.
This release has been prepared under the supervision of Harvey Klatt,
P.Geo., a Qualified Person under the meaning of National Instrument 43-101.
All assays were performed by Global Discovery Laboratories, Vancouver, B.C.
Sabina Resources Limited is debt free and has a strong treasury.
ON BEHALF OF THE BOARD OF DIRECTORS
Abraham Drost, President
The statements made in this Press Release may contain forward looking
statements that may involve a number of risks and uncertainties. Actual events
or results could differ materially from the Company's expectations and
projections. The TSX Venture Exchange does not accept responsibility for the
accuracy or the adequacy of this release.
>>
%SEDAR: 00005733E
Sabina gets high grade zinc and silver assays from 2005 expansion drilling at Hackett River, Nunavut
Sabina Gold & Silver Corp. on 6ix
Earlier from Sabina Gold & Silver
- Sabina and Wolfden announce assays; building on new gold discovery at Follansbee Red Lake
- Sabina to update resource estimate at high grade silver and zinc-rich Hackett River property - restated
- Sabina to update Resource Estimate at high grade silver and zinc-rich Hackett River property
Later from Sabina Gold & Silver
- Sabina update; Up to 2.09 oz gold over 2.26m in high grade zone at Follansbee, Red Lake
- Sabina reports 5.05 g/T gold over 34.95m in drill core at Follansbee, Red Lake; Surface trenching and Phase 3 drilling to commence
- Sabina: Surface channel sampling gold results at Follansbee Red Lake confirm continuity of drill results to surface
- Sabina Resources Limited - Resource estimate at Hackett River shows in excess of 140 million ounces silver and 1.7 million tonnes zinc
- Sabina Resources Limited - Drilling continues to expand Bonanza-Follansbee Red Lake Gold Zones - Step-Out Drilling Intersects 29.89g/t Au Across 2.0 Meters
Follow Sabina Gold & Silver into a list and get an email when it puts out news.
Follow Sabina Gold & Silver